Data analysis results of DauThau.info software for bid solicitors BQL CÔNG TRÌNH CÔNG CỘNG LAGI as follows:
- Has relationships with 1 project owners.
- Has relationships with 0 contractor.
- Announced 5 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 10 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors BQL CÔNG TRÌNH CÔNG CỘNG LAGI as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI are as follows:
- Is the investor of 5 development investment projects.
- Is the investor of 9 contractor selection plans, of which 3 were self-published, and 6 were published by other entities.
- Is the investor of 11 Tender Notices, of which 0 were self-invited, and 11 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 1 bidding packages, of which 1 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 93.97% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 93.97% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Lâm Đồng (1)
- Provinces before the merger where the contractor has participated in bidding : Undefined (1)
- Has relationships with 0 Bid Solicitors
- Has relationships with 1 Bid Investors
- Has competed against 3 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor AN LAP THINH CONSTRUCTION & INVESTMENT LIMITED COMPANY has posted the results of the bidding package Package No. 03: Maintain and take care of the entire project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI.
- Winning bidder: WATER SUPPLYDRAINAGE AND ENVIRONMENTAL SERVICES COMPANY LIMITED
09/05/2025 15:30
Bid solicitor AN LAP THINH CONSTRUCTION & INVESTMENT LIMITED COMPANY has posted Tender Notice Tender package No 03: Maintain and take care of the entire project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with the form Open bidding.
01/04/2025 09:56
Bid solicitor AN LAP THINH CONSTRUCTION & INVESTMENT LIMITED COMPANY has posted Tender Notice Tender package No 03: Maintain and take care of the entire project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with the form Open bidding.
28/03/2025 15:29
The Bid solicitor BQL CÔNG TRÌNH CÔNG CỘNG LAGI has posted the request The contractor selection plan for packages No. 03, 04, 05, 06 projects to maintain and care for trees and grass in La Gi town in the period of 2025-2026 of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with 4 bidding package.
24/03/2025 15:54
Investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI has posted an investment and development project Maintain and care for trees and grass in La Gi town in the period of 2025-2026.
24/03/2025 15:15
The Bid solicitor TRIEU TIN CONSTRUCTION CONSULTING COMPANY LIMITED has posted the results of the bidding package Package No. 02: Procurement of 02 trucks to compact and transport 15 m3 garbage of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI.
- Winning bidder: truong long engineering and auto joint stock company
12/11/2024 09:43
Bid solicitor TRIEU TIN CONSTRUCTION CONSULTING COMPANY LIMITED has posted Tender Notice Tender package No 02: Procurement of 02 trucks to compact and transport 15 m3 garbage of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with the form Open bidding.
18/10/2024 13:07
The Bid solicitor BQL CÔNG TRÌNH CÔNG CỘNG LAGI has posted the request Bidding packages No. 02, 03, 04 and 05 for Garbage truck procurement project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with 3 bidding package.
27/09/2024 16:29
The Bid solicitor AN LAP THINH CONSTRUCTION & INVESTMENT LIMITED COMPANY has posted the results of the bidding package Package No. 03: Maintain and take care of the entire project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TƯ VẤN XÂY DỰNG VIỆT NAM XANH
22/03/2024 15:28
Bid solicitor AN LAP THINH CONSTRUCTION & INVESTMENT LIMITED COMPANY has posted Tender Notice Tender package No 03: Maintain and take care of the entire project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with the form Open bidding.
08/03/2024 18:56
The data sheet has been partially hidden, to see the full information please Login or Register
BQL CÔNG TRÌNH CÔNG CỘNG LAGI publishes the plan The contractor selection plan for packages No. 03, 04, 05, 06 projects to maintain and care for trees and grass in La Gi town in the period of 2025-2026 with 4 bidding package .
24/03/2025 15:54
BQL CÔNG TRÌNH CÔNG CỘNG LAGI publishes the plan Bidding packages No. 02, 03, 04 and 05 for Garbage truck procurement project with 3 bidding package .
27/09/2024 16:29
BQL CÔNG TRÌNH CÔNG CỘNG LAGI publishes the plan Plan for selecting contractors for the project of maintaining and taking care of trees and grass in La Gi town in the period of 2024 - 2025 with 3 bidding package .
05/03/2024 09:52
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor AN LAP THINH CONSTRUCTION & INVESTMENT LIMITED COMPANY has posted the results of the bidding package Package No. 03: Maintain and take care of the entire project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI.
- Winning bidder: WATER SUPPLYDRAINAGE AND ENVIRONMENTAL SERVICES COMPANY LIMITED
09/05/2025 15:30
Bid solicitor AN LAP THINH CONSTRUCTION & INVESTMENT LIMITED COMPANY has posted Tender Notice Tender package No 03: Maintain and take care of the entire project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with the form Open bidding.
01/04/2025 09:56
Bid solicitor AN LAP THINH CONSTRUCTION & INVESTMENT LIMITED COMPANY has posted Tender Notice Tender package No 03: Maintain and take care of the entire project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with the form Open bidding.
28/03/2025 15:29
The Bid solicitor BQL CÔNG TRÌNH CÔNG CỘNG LAGI has posted the request The contractor selection plan for packages No. 03, 04, 05, 06 projects to maintain and care for trees and grass in La Gi town in the period of 2025-2026 of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with 4 bidding package.
24/03/2025 15:54
Investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI has posted an investment and development project Maintain and care for trees and grass in La Gi town in the period of 2025-2026.
24/03/2025 15:15
The Bid solicitor TRIEU TIN CONSTRUCTION CONSULTING COMPANY LIMITED has posted the results of the bidding package Package No. 02: Procurement of 02 trucks to compact and transport 15 m3 garbage of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI.
- Winning bidder: truong long engineering and auto joint stock company
12/11/2024 09:43
Bid solicitor TRIEU TIN CONSTRUCTION CONSULTING COMPANY LIMITED has posted Tender Notice Tender package No 02: Procurement of 02 trucks to compact and transport 15 m3 garbage of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with the form Open bidding.
18/10/2024 13:07
The Bid solicitor BQL CÔNG TRÌNH CÔNG CỘNG LAGI has posted the request Bidding packages No. 02, 03, 04 and 05 for Garbage truck procurement project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with 3 bidding package.
27/09/2024 16:29
The Bid solicitor AN LAP THINH CONSTRUCTION & INVESTMENT LIMITED COMPANY has posted the results of the bidding package Package No. 03: Maintain and take care of the entire project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TƯ VẤN XÂY DỰNG VIỆT NAM XANH
22/03/2024 15:28
Bid solicitor AN LAP THINH CONSTRUCTION & INVESTMENT LIMITED COMPANY has posted Tender Notice Tender package No 03: Maintain and take care of the entire project of the investor BQL CÔNG TRÌNH CÔNG CỘNG LAGI with the form Open bidding.
08/03/2024 18:56
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s BQL CÔNG TRÌNH CÔNG CỘNG LAGI has posted 3 of the contractor selection plan, which contains 10 of the bidding package. See full list here
Summary: The procuring entity BQL CÔNG TRÌNH CÔNG CỘNG LAGI has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects