Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors CẢNG DẦU B12 as follows:
- Has relationships with 1 project owners.
- Has relationships with 61 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 88 contractor selection plans with a total of 95 bidding packages, of which 88 prequalification documents have not found the investment project.
- Has invited bids for 32 packages (with 34 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 89 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 59 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.41 contractors.
- Breakdown by bidding field: Goods 29.41%, Construction 8.82%, Consultancy 8.82%, Non-consultancy 52.94%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 25,158,414,346 VND, of which the total winning bid value is: 24,278,974,177 VND.
- The savings rate is: 3.50%.
Data analysis results of DauThau.info software for bid solicitors CẢNG DẦU B12 as follows:
- Has relationships with 61 contractor.
- The average number of contractors participating in each bidding package is: 1.41 contractors.
- Proportion of bidding fields: Goods 29.41%, Construction 8.82%, Consulting 8.82%, Non-consulting 52.94%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 25,158,414,346 VND, in which the total winning value is: 24,278,974,177 VND.
- The savings rate is: 3.50%.
This Bid solicitor is also an investor. The analysis results of data for the investor CẢNG DẦU B12 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 99 contractor selection plans, of which 76 were self-published, and 23 were published by other entities.
- Is the investor of 48 Tender Notices, of which 34 were self-invited, and 14 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
CẢNG DẦU B12 publishes the plan Investment in a 500 kg crane for use in loading and unloading operations at the port. with 1 bidding package .
24/08/2026 16:56
CẢNG DẦU B12 announced the results of the bid package Package No. 01: Intermediate repair of Cua Luc tugboat .
- Winning bidder: 128 ONE MEMBER LIMITED LIABILITY COMPANY
21/08/2026 16:27
CẢNG DẦU B12 publishes the plan Reinforce the seawall section from M2 pool area to HV2 valve pit. with 4 bidding package .
19/08/2026 09:36
CẢNG DẦU B12 announced the results of the bid package Package No. 02: Purchase of spare parts and supplies for main engines and generators for Cua Luc ship .
- Winning bidder: VINH HUNG COMPANY LIMITED.
11/08/2026 16:50
CẢNG DẦU B12 publishes Tender Notice Tender package No 02: Purchase of spare parts and supplies for main engines and generators for Cua Luc ship in the form Competitive Offer .
10/07/2026 15:29
CẢNG DẦU B12 publishes Tender Notice Tender package No 01: Intermediate repair of Cua Luc tugboat in the form Open bidding .
10/07/2026 15:16
CẢNG DẦU B12 publishes the plan Repairing Cua Luc intermediate level tugboat on the dock with 3 bidding package .
06/07/2026 10:43
CẢNG DẦU B12 announced the results of the bid package Package No. 01: Building new petroleum retail ships .
- Winning bidder: PTS HAI PHONG SHIPYARD COMPANY LIMITED
24/04/2026 16:06
CẢNG DẦU B12 announced the results of the bid package Package 02: Completed project audit .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN - TƯ VẤN ĐẤT VIỆT
30/03/2026 09:59
CẢNG DẦU B12 announced the results of the bid package Intermediate level repair of ship BC09 .
- Winning bidder: PTS HAI PHONG SHIPYARD COMPANY LIMITED
14/03/2026 09:24
The data sheet has been partially hidden, to see the full information please Login or Register
CẢNG DẦU B12 announced the results of the bid package Install 02 pumps and dredging technology systems to loading ARM .
- Winning bidder: HUNG THINH DONG TRADING AND CONSTRUCTION COMPANY LIMITED
14/11/2025 16:00
CẢNG DẦU B12 announced the results of the bid package Package 02: Completed project audit .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN - TƯ VẤN ĐẤT VIỆT
25/09/2025 11:03
CẢNG DẦU B12 announced the results of the bid package Provide 03 pumps for import and export Jet A-1 .
- Winning bidder: VINAMCO IMPORT EXPORT PETROLEUM EQUIPMENTS TRADE JOINT STOCK COMPANY
18/08/2025 15:46
CẢNG DẦU B12 announced the results of the bid package Investing in microphones, audio meeting rooms .
- Winning bidder: TRUNG CHINH AUDIO EQUIPMENT COMPANY LIMITED
23/07/2025 10:02
CẢNG DẦU B12 announced the results of the bid package Processing, installing floor operations d3, d4, d5, d6 .
- Winning bidder: CÔNG TY TNHH 1 THÀNH VIÊN CƠ KHÍ VĨNH CƯỜNG
14/07/2025 14:07
CẢNG DẦU B12 announced the results of the bidding package Processing, installing floor operations d3, d4, d5, d6 with 1 participating contractors .
08/07/2025 15:03
CẢNG DẦU B12 announced the results of the bidding package Provide 03 pumps for import and export Jet A-1 with 1 participating contractors .
07/07/2025 16:18
CẢNG DẦU B12 announced the results of the bid package Upgrade the management and operation of beach petrol and oil storage .
- Winning bidder: Bach Kim Automation and Software LLC
03/07/2025 17:21
CẢNG DẦU B12 publishes Tender Notice Processing, installing floor operations d3, d4, d5, d6 in the form Competitive Offer .
26/06/2025 10:36
CẢNG DẦU B12 announced the results of the bidding package Investing in microphones, audio meeting rooms with 2 participating contractors .
26/06/2025 08:16
The data sheet has been partially hidden, to see the full information please Login or Register
CẢNG DẦU B12 publishes the plan Investment in a 500 kg crane for use in loading and unloading operations at the port. with 1 bidding package .
24/08/2026 16:56
CẢNG DẦU B12 announced the results of the bid package Package No. 01: Intermediate repair of Cua Luc tugboat .
- Winning bidder: 128 ONE MEMBER LIMITED LIABILITY COMPANY
21/08/2026 16:27
CẢNG DẦU B12 publishes the plan Reinforce the seawall section from M2 pool area to HV2 valve pit. with 4 bidding package .
19/08/2026 09:36
CẢNG DẦU B12 announced the results of the bid package Package No. 02: Purchase of spare parts and supplies for main engines and generators for Cua Luc ship .
- Winning bidder: VINH HUNG COMPANY LIMITED.
11/08/2026 16:50
CẢNG DẦU B12 publishes Tender Notice Tender package No 02: Purchase of spare parts and supplies for main engines and generators for Cua Luc ship in the form Competitive Offer .
10/07/2026 15:29
CẢNG DẦU B12 publishes Tender Notice Tender package No 01: Intermediate repair of Cua Luc tugboat in the form Open bidding .
10/07/2026 15:16
CẢNG DẦU B12 publishes the plan Repairing Cua Luc intermediate level tugboat on the dock with 3 bidding package .
06/07/2026 10:43
CẢNG DẦU B12 announced the results of the bid package Package No. 01: Building new petroleum retail ships .
- Winning bidder: PTS HAI PHONG SHIPYARD COMPANY LIMITED
24/04/2026 16:06
CẢNG DẦU B12 announced the results of the bid package Package 02: Completed project audit .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN - TƯ VẤN ĐẤT VIỆT
30/03/2026 09:59
CẢNG DẦU B12 announced the results of the bid package Intermediate level repair of ship BC09 .
- Winning bidder: PTS HAI PHONG SHIPYARD COMPANY LIMITED
14/03/2026 09:24
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CẢNG DẦU B12 has posted 88 of the contractor selection plan, which contains 95 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CẢNG DẦU B12 has posted 34 Tender Notices in 32 bidding packages. Among these, 34 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CẢNG DẦU B12 has posted 89 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 89 package, canceled the bid 0 package (among the bidding packages above).
- There are 59 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CẢNG DẦU B12 has a relationship with 61 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CẢNG DẦU B12 has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity CẢNG DẦU B12 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects