Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Chi cục Phát triển nông thôn Thanh Hóa as follows:
- Has relationships with 1 project owners.
- Has relationships with 20 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 24 contractor selection plans with a total of 60 bidding packages, of which 24 prequalification documents have not found the investment project.
- Has invited bids for 21 packages (with 22 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 46 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 29 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 14 packages that have not fully posted the contractor selection results. Of these 13 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.20 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 32,860,329,680 VND, of which the total winning bid value is: 32,275,329,880 VND.
- The savings rate is: 1.78%.
Data analysis results of DauThau.info software for bid solicitors Chi cục Phát triển nông thôn Thanh Hóa as follows:
- Has relationships with 20 contractor.
- The average number of contractors participating in each bidding package is: 1.20 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 32,860,329,680 VND, in which the total winning value is: 32,275,329,880 VND.
- The savings rate is: 1.78%.
This Bid solicitor is also an investor. The analysis results of data for the investor Chi cục Phát triển nông thôn Thanh Hóa are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 19 contractor selection plans, of which 17 were self-published, and 2 were published by other entities.
- Is the investor of 23 Tender Notices, of which 22 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Bidding package No. 03: Procurement of machinery and equipment to implement agricultural cooperatives applying high technology, with products associated with the value chain, sustainable development in 2025 at the following units: Xuan Hoa Agricultural Cooperative, Xuan Hoa commune; Hien Khue high-tech agricultural mechanization service cooperative, Yen Truong commune; State Service Cooperative of Cam Lien and Cam Thach communes; Lien Loc Agricultural Cooperative, Hoa Loc commune; State Service Cooperative of Vinh Tien and Tay Do communes; Muong Lat agricultural and forestry product service development cooperative, Muong Lat commune; Hoang Giang Agricultural Service Cooperative, Trung Chinh commune; Cong Liem State Service Cooperative, Cong Chinh commune; Dong Tien agricultural mechanization service cooperative, Dong Tien ward; Hoang Thanh Agricultural Service Cooperative, Hoang Loc commune. .
- Winning bidder: THIEN TRUONG COMPANY LIMITED
28/11/2025 16:12
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Print documents
regulation instructions
household review process
poor, poor
poor year
2025 .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THIÊN Y
24/11/2025 09:52
Chi cục Phát triển nông thôn Thanh Hóa publishes the plan Plan to select contractors to carry out cost estimates for investigation and review of poor and near-poor households in 2025 with 1 bidding package .
13/11/2025 10:58
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Package No. 04: Rent a car to gain experience .
- Winning bidder: Công ty TNHH vận tải Hoàng Long TH
13/11/2025 10:53
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Bidding package No. 02: Hire a consultant to evaluate bidding documents and evaluate the results of contractor selection for bidding package No. 03 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ ĐẤU THẦU HỒNG PHÁT
13/11/2025 10:50
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Bidding package No. 01: Hire a consultant to prepare bidding documents and evaluate bids for bidding package No. 03 .
- Winning bidder: TRUONG LOC CONSTRUCTION AND TRADE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY
13/11/2025 10:48
Chi cục Phát triển nông thôn Thanh Hóa publishes Tender Notice Bidding package No. 03: Procurement of machinery and equipment to implement agricultural cooperatives applying high technology, with products associated with the value chain, sustainable development in 2025 at the following units: Xuan Hoa Agricultural Cooperative, Xuan Hoa commune; Hien Khue high-tech agricultural mechanization service cooperative, Yen Truong commune; State Service Cooperative of Cam Lien and Cam Thach communes; Lien Loc Agricultural Cooperative, Hoa Loc commune; State Service Cooperative of Vinh Tien and Tay Do communes; Muong Lat agricultural and forestry product service development cooperative, Muong Lat commune; Hoang Giang Agricultural Service Cooperative, Trung Chinh commune; Cong Liem State Service Cooperative, Cong Chinh commune; Dong Tien agricultural mechanization service cooperative, Dong Tien ward; Hoang Thanh Agricultural Service Cooperative, Hoang Loc commune. in the form Open bidding .
27/10/2025 16:06
Chi cục Phát triển nông thôn Thanh Hóa publishes the plan Implement agricultural cooperative models that apply high technology, have products linked to the value chain, and develop sustainably by 2025. with 4 bidding package .
10/10/2025 11:17
The Bid solicitor Chi cục Phát triển nông thôn Thanh Hóa has posted the results of the bidding package Package No. 05: Rent cars to supervise and evaluate the program (Sub -project 2 - Project 7) of the investor Chi cục Phát triển nông thôn Thanh Hóa .
01/07/2025 14:34
The Bid solicitor Chi cục Phát triển nông thôn Thanh Hóa has posted the results of the bidding package Package 04: Rent cars to study experience (Song 1 - Project 7) of the investor Chi cục Phát triển nông thôn Thanh Hóa .
- Winning bidder: Công ty TNHH vận tải Hoàng Long TH
01/07/2025 14:28
The data sheet has been partially hidden, to see the full information please Login or Register
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Package No. 05: Rent cars to supervise and evaluate the program (Sub -project 2 - Project 7) .
- Winning bidder: Công ty TNHH TM & Du lịch An Thành Vượng
01/07/2025 14:34
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Package 04: Rent cars to study experience (Song 1 - Project 7) .
- Winning bidder: Công ty TNHH vận tải Hoàng Long TH
01/07/2025 14:28
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Package No. 03: Renting the Hall of Loa, Radio, Maket, Decoration, Fresh Flowers to organize training training on knowledge, skills and professional skills for the contingent of officials working in poverty reduction at all levels (Sieu 1 - Project 7) .
- Winning bidder: TRUNG TÂM HOẠT ĐỘNG VÀ BỒI DƯỠNG CÁN BỘ THANH THIẾU NHI THANH HÓA
30/06/2025 14:13
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Package 02: Video reportage, communication message propaganda national target program sustainable poverty reduction in the period of 20212025 (sub -project 2 - Project 6) .
- Winning bidder: Trung tâm Dịch vụ Phát thanh Truyền hình và Tổ chức sự kiện Thanh Hóa
21/06/2025 08:27
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Package No. 01: Design, print and hang banners propagating the national target program sustainable poverty reduction (Project 2 - Project 6) .
- Winning bidder: CÔNG TY TNHH QUẢNG CÁO VIỆT THẮNG
16/06/2025 10:05
Chi cục Phát triển nông thôn Thanh Hóa publishes the plan The contractor selection plan for project implementation; Sub -project under the national target program sustainable poverty reduction in 2025 with 5 bidding package .
06/06/2025 09:24
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Package 02: Drinking water .
- Winning bidder: TRUNG TÂM HOẠT ĐỘNG VÀ BỒI DƯỠNG CÁN BỘ THANH THIẾU NHI THANH HÓA
08/04/2025 14:29
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Package 1: Rent halls, loudspeakers, teaching equipment .
- Winning bidder: TRUNG TÂM HOẠT ĐỘNG VÀ BỒI DƯỠNG CÁN BỘ THANH THIẾU NHI THANH HÓA
08/04/2025 11:43
Chi cục Phát triển nông thôn Thanh Hóa publishes the plan Propaganda estimates and training for cadres, civil servants, people working in the arrangement of residents and people in the risk of natural disasters in the mountainous districts of Thanh Hoa province in 2025 with 2 bidding package .
08/04/2025 11:36
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Package No. 03: Buy Breeding Cows .
- Winning bidder: HỢP TÁC XÃ DỊCH VỤ TỔNG HỢP CHIÊNG BAN
11/12/2024 09:49
The data sheet has been partially hidden, to see the full information please Login or Register
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Bidding package No. 03: Procurement of machinery and equipment to implement agricultural cooperatives applying high technology, with products associated with the value chain, sustainable development in 2025 at the following units: Xuan Hoa Agricultural Cooperative, Xuan Hoa commune; Hien Khue high-tech agricultural mechanization service cooperative, Yen Truong commune; State Service Cooperative of Cam Lien and Cam Thach communes; Lien Loc Agricultural Cooperative, Hoa Loc commune; State Service Cooperative of Vinh Tien and Tay Do communes; Muong Lat agricultural and forestry product service development cooperative, Muong Lat commune; Hoang Giang Agricultural Service Cooperative, Trung Chinh commune; Cong Liem State Service Cooperative, Cong Chinh commune; Dong Tien agricultural mechanization service cooperative, Dong Tien ward; Hoang Thanh Agricultural Service Cooperative, Hoang Loc commune. .
- Winning bidder: THIEN TRUONG COMPANY LIMITED
28/11/2025 16:12
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Print documents
regulation instructions
household review process
poor, poor
poor year
2025 .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN THIÊN Y
24/11/2025 09:52
Chi cục Phát triển nông thôn Thanh Hóa publishes the plan Plan to select contractors to carry out cost estimates for investigation and review of poor and near-poor households in 2025 with 1 bidding package .
13/11/2025 10:58
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Package No. 04: Rent a car to gain experience .
- Winning bidder: Công ty TNHH vận tải Hoàng Long TH
13/11/2025 10:53
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Bidding package No. 02: Hire a consultant to evaluate bidding documents and evaluate the results of contractor selection for bidding package No. 03 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ ĐẤU THẦU HỒNG PHÁT
13/11/2025 10:50
Chi cục Phát triển nông thôn Thanh Hóa announced the results of the bid package Bidding package No. 01: Hire a consultant to prepare bidding documents and evaluate bids for bidding package No. 03 .
- Winning bidder: TRUONG LOC CONSTRUCTION AND TRADE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY
13/11/2025 10:48
Chi cục Phát triển nông thôn Thanh Hóa publishes Tender Notice Bidding package No. 03: Procurement of machinery and equipment to implement agricultural cooperatives applying high technology, with products associated with the value chain, sustainable development in 2025 at the following units: Xuan Hoa Agricultural Cooperative, Xuan Hoa commune; Hien Khue high-tech agricultural mechanization service cooperative, Yen Truong commune; State Service Cooperative of Cam Lien and Cam Thach communes; Lien Loc Agricultural Cooperative, Hoa Loc commune; State Service Cooperative of Vinh Tien and Tay Do communes; Muong Lat agricultural and forestry product service development cooperative, Muong Lat commune; Hoang Giang Agricultural Service Cooperative, Trung Chinh commune; Cong Liem State Service Cooperative, Cong Chinh commune; Dong Tien agricultural mechanization service cooperative, Dong Tien ward; Hoang Thanh Agricultural Service Cooperative, Hoang Loc commune. in the form Open bidding .
27/10/2025 16:06
Chi cục Phát triển nông thôn Thanh Hóa publishes the plan Implement agricultural cooperative models that apply high technology, have products linked to the value chain, and develop sustainably by 2025. with 4 bidding package .
10/10/2025 11:17
The Bid solicitor Chi cục Phát triển nông thôn Thanh Hóa has posted the results of the bidding package Package No. 05: Rent cars to supervise and evaluate the program (Sub -project 2 - Project 7) of the investor Chi cục Phát triển nông thôn Thanh Hóa .
01/07/2025 14:34
The Bid solicitor Chi cục Phát triển nông thôn Thanh Hóa has posted the results of the bidding package Package 04: Rent cars to study experience (Song 1 - Project 7) of the investor Chi cục Phát triển nông thôn Thanh Hóa .
- Winning bidder: Công ty TNHH vận tải Hoàng Long TH
01/07/2025 14:28
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Chi cục Phát triển nông thôn Thanh Hóa has posted 24 of the contractor selection plan, which contains 60 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Chi cục Phát triển nông thôn Thanh Hóa has posted 22 Tender Notices in 21 bidding packages. Among these, 22 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Chi cục Phát triển nông thôn Thanh Hóa has posted 46 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 46 package, canceled the bid 0 package (among the bidding packages above).
- There are 29 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Chi cục Phát triển nông thôn Thanh Hóa has a relationship with 20 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Chi cục Phát triển nông thôn Thanh Hóa has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Chi cục Phát triển nông thôn Thanh Hóa has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects