Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 as follows:
- Has relationships with 1 project owners.
- Has relationships with 29 contractor.
- Announced 22 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 16 contractor selection plans with a total of 27 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 18 packages (with 19 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 18 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 8 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.50 contractors.
- Breakdown by bidding field: Goods 47.37%, Construction 31.58%, Consultancy 10.53%, Non-consultancy 10.53%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 18,708,700,278 VND, of which the total winning bid value is: 12,450,832,046 VND.
- The savings rate is: 33.45%.
Data analysis results of DauThau.info software for bid solicitors HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 as follows:
- Has relationships with 29 contractor.
- The average number of contractors participating in each bidding package is: 2.50 contractors.
- Proportion of bidding fields: Goods 47.37%, Construction 31.58%, Consulting 10.53%, Non-consulting 10.53%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 18,708,700,278 VND, in which the total winning value is: 12,450,832,046 VND.
- The savings rate is: 33.45%.
This Bid solicitor is also an investor. The analysis results of data for the investor HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 are as follows:
- Is the investor of 22 development investment projects.
- Is the investor of 27 contractor selection plans, of which 16 were self-published, and 11 were published by other entities.
- Is the investor of 29 Tender Notices, of which 19 were self-invited, and 10 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Procurement and replacement of outdoor 40.5 kV vacuum circuit breaker with 2 bidding package .
25/08/2026 11:12
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes Tender Notice HH04/2026: Upgrading the relay system to protect the generator block - MBA unit number 1 in the form Open bidding .
19/08/2026 16:12
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 announced the results of the bid package PTV05/2026: Periodic repair and maintenance of main equipment of power units H1 and H2 in 2026 .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG BẮC NGUYÊN
11/08/2026 21:50
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes Tender Notice HH05/2026: Procurement and replacement of pressure oil pump No. 2 of H1 unit and No. 1 of H2 unit at Dray H'Linh 2 Hydropower Plant in the form Competitive Offer .
11/08/2026 16:06
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Procurement and replacement of outdoor 40.5 kV vacuum circuit breaker with 1 bidding package .
30/07/2026 11:38
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Upgrade the PLC system to automatically control the H2 generator set and the monitoring, measurement and control system of the H2 generator set with 1 bidding package .
30/07/2026 11:36
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Procurement and replacement of pressure oil pump No. 2 of H1 unit and No. 1 of H2 unit at Dray H'Linh 2 Hydropower Plant with 1 bidding package .
30/07/2026 11:33
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Upgrade the relay system to protect the generator block - MBA unit 1 with 1 bidding package .
30/07/2026 11:26
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Upgrading the power measurement system of Dray H'Linh 2 Hydropower Plant with 1 bidding package .
30/07/2026 11:22
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Regular experiments in 2026 with 1 bidding package .
30/07/2026 11:18
The data sheet has been partially hidden, to see the full information please Login or Register
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 announced the results of the bid package PTV03/2025: Experiment after repair and maintenance of 2 units .
- Winning bidder: CENTRAL ELECTRICAL TESTING COMPANY LIMITED
20/06/2025 15:01
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 announced the results of the bidding package PTV03/2025: Experiment after repair and maintenance of 2 units with 3 participating contractors .
13/06/2025 14:03
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 announced the results of the bid package HH03/2025: Procurement of materials and equipment for repair and maintenance in 2025 .
- Winning bidder: TB HYDRO VIET NAM ENGINEERING AND EQUIPMENT COMPANY LIMITED
06/06/2025 15:43
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 announced the results of the bid package HH04/2025: Providing Turbine Castrol Perfecto X46 .
- Winning bidder: ANH BINH COMPANY LIMITED
05/06/2025 13:48
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 announced the results of the bidding package HH03/2025: Procurement of materials and equipment for repair and maintenance in 2025 with 1 participating contractors .
04/06/2025 09:47
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes Tender Notice PTV03/2025: Experiment after repair and maintenance of 2 units in the form Open bidding .
03/06/2025 15:23
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes Tender Notice HH03/2025: Procurement of materials and equipment for repair and maintenance in 2025 in the form Competitive Offer .
28/05/2025 15:55
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 announced the results of the bid package PTV02/2025: Repair and maintenance periodically H1, SCL H2 NMT DRAP H’Linh 2 years 2025 .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG BẮC NGUYÊN
28/05/2025 12:53
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 announced the results of the bidding package HH04/2025: Providing Turbine Castrol Perfecto X46 with 4 participating contractors .
22/05/2025 09:14
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 announced the results of the bidding package HH03/2025: Procurement of materials and equipment for repair and maintenance in 2025 with 1 participating contractors .
20/05/2025 09:15
The data sheet has been partially hidden, to see the full information please Login or Register
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Procurement and replacement of outdoor 40.5 kV vacuum circuit breaker with 2 bidding package .
25/08/2026 11:12
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes Tender Notice HH04/2026: Upgrading the relay system to protect the generator block - MBA unit number 1 in the form Open bidding .
19/08/2026 16:12
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 announced the results of the bid package PTV05/2026: Periodic repair and maintenance of main equipment of power units H1 and H2 in 2026 .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG BẮC NGUYÊN
11/08/2026 21:50
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes Tender Notice HH05/2026: Procurement and replacement of pressure oil pump No. 2 of H1 unit and No. 1 of H2 unit at Dray H'Linh 2 Hydropower Plant in the form Competitive Offer .
11/08/2026 16:06
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Procurement and replacement of outdoor 40.5 kV vacuum circuit breaker with 1 bidding package .
30/07/2026 11:38
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Upgrade the PLC system to automatically control the H2 generator set and the monitoring, measurement and control system of the H2 generator set with 1 bidding package .
30/07/2026 11:36
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Procurement and replacement of pressure oil pump No. 2 of H1 unit and No. 1 of H2 unit at Dray H'Linh 2 Hydropower Plant with 1 bidding package .
30/07/2026 11:33
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Upgrade the relay system to protect the generator block - MBA unit 1 with 1 bidding package .
30/07/2026 11:26
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Upgrading the power measurement system of Dray H'Linh 2 Hydropower Plant with 1 bidding package .
30/07/2026 11:22
HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 publishes the plan Regular experiments in 2026 with 1 bidding package .
30/07/2026 11:18
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 has posted 16 of the contractor selection plan, which contains 27 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 has posted 19 Tender Notices in 18 bidding packages. Among these, 19 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 has posted 18 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 18 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 has a relationship with 29 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity HYDRO POWER JOINT STOCK COMPANY-POWER NO 3 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects