Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors CÔNG TY ĐIỆN LỰC QUẢNG NGÃI as follows:
- Has relationships with 206 contractor.
- Announced 99 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 243 contractor selection plans with a total of 361 bidding packages, of which 157 prequalification documents have not found the investment project.
- Has invited bids for 199 packages (with 206 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 279 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 133 packages with results that do not have tender notice or prequalification notice.
- There are 244 packages that have not fully posted the contractor selection results. Of these 198 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.28 contractors.
- Breakdown by bidding field: Goods 56.80%, Construction 17.48%, Consultancy 10.19%, Non-consultancy 15.53%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 328,635,530,843 VND, of which the total winning bid value is: 284,346,640,384 VND.
- The savings rate is: 13.48%.
Data analysis results of DauThau.info software for bid solicitors CÔNG TY ĐIỆN LỰC QUẢNG NGÃI as follows:
- Has relationships with 206 contractor.
- The average number of contractors participating in each bidding package is: 3.28 contractors.
- Proportion of bidding fields: Goods 56.80%, Construction 17.48%, Consulting 10.19%, Non-consulting 15.53%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 328,635,530,843 VND, in which the total winning value is: 284,346,640,384 VND.
- The savings rate is: 13.48%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 99 investment and development projects.
- As the owner of 212 Contractor selection plan in which 210 Contractor selection plan is self-published, and 2 Contractor selection plan is posted by other units.
- Being the investor of 206 bidding packages in which 206 packages are self-invited, and 0 packages are invited by other units.
You need to Login or Sign up to view all informations.
- Participated in 77 bidding packages, of which 77 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 93.99% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Quảng Ngãi (76), Undefined (1)
- Has relationships with 3 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Name of construction organization: Công ty Điện lực Quảng Ngãi
- Code of capacity certificate of construction activities: 00027839
- Issuer:
- Fields:
⚬ Thi công xây dựng công trình: Công nghiệp năng lượng (đường dây và trạm biến áp)
⚬ Giám sát thi công xây dựng công trình: Đường dây và trạm biến áp
⚬ Giám sát thi công xây dựng công trình: Đường dây và trạm biến áp.
⚬ Thi công xây dựng công trình: Đường dây và trạm biến áp.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted Tender Notice Package 25PTV-G09: Transporting Diesel oil to Dao Be of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI with the form Competitive Offer.
25/10/2024 16:36
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the request Contractor selection plan "Providing information technology equipment for production and business in 2024 (phase 3)" of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI with 1 bidding package.
22/10/2024 10:37
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the request Automating the distribution grid (DAS) at PC Quang Ngai in 2024 of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI with 2 bidding package.
21/10/2024 17:04
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the results of the bidding package Package 25PTV-G07- Providing services for periodic inspection and calibration of QNPC measuring instruments in 2025 of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI.
- Winning bidder: Trung tâm Kỹ thuật Tiêu chuẩn Đo lường Chất lượng 2
21/10/2024 15:46
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the request Adding operational capacity and ensuring information security for the information system at Quang Ngai Power Company in 2025 of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI with 1 bidding package.
19/10/2024 16:32
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the request Contractor selection plan "Providing inspection services for machines, equipment, and materials with strict OSH requirements for production and business in 2025" of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI with 1 bidding package.
18/10/2024 15:24
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the results of the bidding package Package 24HH-G50: Supply of load transformers of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI.
- Winning bidder: HANAKA Group Joint Stock Company
16/10/2024 15:16
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI Posted Development Investment Project Equipping fire protection system at Ly Son Power Plant and FM-200 gas fire suppression system at QNPC Production University in 2025.
16/10/2024 09:09
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the results of the bidding package Package No. 04/XL: Construction and installation of additional items of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI.
- Winning bidder: CÔNG TY ĐIỆN LỰC QUẢNG NGÃI
16/10/2024 08:23
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the results of the bidding package Package No. 06/TV: Construction supervision and installation of additional equipment of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI.
- Winning bidder: CÔNG TY ĐIỆN LỰC QUẢNG NGÃI
16/10/2024 08:21
The data sheet has been partially hidden, to see the full information please Login or Register
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI publishes Tender Notice Package 25PTV-G09: Transporting Diesel oil to Dao Be in the form Competitive Offer .
25/10/2024 16:36
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI announced the results of the bidding package Package 02HH – Procurement of a small truck with 2 double cabins and a closed box with 3 participating contractors .
25/10/2024 14:16
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI publishes the plan Contractor selection plan "Providing information technology equipment for production and business in 2024 (phase 3)" with 1 bidding package .
22/10/2024 10:37
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI publishes the plan Automating the distribution grid (DAS) at PC Quang Ngai in 2024 with 2 bidding package .
21/10/2024 17:04
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI announced the results of the bid package Package 25PTV-G07- Providing services for periodic inspection and calibration of QNPC measuring instruments in 2025 .
- Winning bidder: Trung tâm Kỹ thuật Tiêu chuẩn Đo lường Chất lượng 2
21/10/2024 15:46
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI announced the results of the bidding package Package 25HH-G07: Lead string, lead seal with 2 participating contractors .
21/10/2024 14:48
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI publishes the plan Adding operational capacity and ensuring information security for the information system at Quang Ngai Power Company in 2025 with 1 bidding package .
19/10/2024 16:32
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI publishes the plan Contractor selection plan "Providing inspection services for machines, equipment, and materials with strict OSH requirements for production and business in 2025" with 1 bidding package .
18/10/2024 15:24
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI announced the results of the bid package Package 24HH-G50: Supply of load transformers .
- Winning bidder: SONG HONG VIET COMPANY LIMITED, HANAKA Group Joint Stock Company
16/10/2024 15:16
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI announced the results of the bid package Package No. 04/XL: Construction and installation of additional items .
- Winning bidder: CÔNG TY ĐIỆN LỰC QUẢNG NGÃI
16/10/2024 08:23
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted Tender Notice Package 25PTV-G09: Transporting Diesel oil to Dao Be of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI with the form Competitive Offer.
25/10/2024 16:36
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the request Contractor selection plan "Providing information technology equipment for production and business in 2024 (phase 3)" of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI with 1 bidding package.
22/10/2024 10:37
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the request Automating the distribution grid (DAS) at PC Quang Ngai in 2024 of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI with 2 bidding package.
21/10/2024 17:04
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the results of the bidding package Package 25PTV-G07- Providing services for periodic inspection and calibration of QNPC measuring instruments in 2025 of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI.
- Winning bidder: Trung tâm Kỹ thuật Tiêu chuẩn Đo lường Chất lượng 2
21/10/2024 15:46
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the request Adding operational capacity and ensuring information security for the information system at Quang Ngai Power Company in 2025 of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI with 1 bidding package.
19/10/2024 16:32
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the request Contractor selection plan "Providing inspection services for machines, equipment, and materials with strict OSH requirements for production and business in 2025" of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI with 1 bidding package.
18/10/2024 15:24
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the results of the bidding package Package 24HH-G50: Supply of load transformers of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI.
- Winning bidder: HANAKA Group Joint Stock Company
16/10/2024 15:16
CÔNG TY ĐIỆN LỰC QUẢNG NGÃI Posted Development Investment Project Equipping fire protection system at Ly Son Power Plant and FM-200 gas fire suppression system at QNPC Production University in 2025.
16/10/2024 09:09
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the results of the bidding package Package No. 04/XL: Construction and installation of additional items of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI.
- Winning bidder: CÔNG TY ĐIỆN LỰC QUẢNG NGÃI
16/10/2024 08:23
The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted the results of the bidding package Package No. 06/TV: Construction supervision and installation of additional equipment of the investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI.
- Winning bidder: CÔNG TY ĐIỆN LỰC QUẢNG NGÃI
16/10/2024 08:21
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted 243 of the contractor selection plan, which contains 361 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted 206 Tender Notice in the 199 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has posted 279 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 279 package, canceled the bid 0 package (among the bidding packages above).
- There are 133 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has a relationship with 206 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI is the investor of 206 package, of which 206 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI is the owner of 212 contractor selection plan. In which, they self-invite 210 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
Summary: Investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI is an investor with 206 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor CÔNG TY ĐIỆN LỰC QUẢNG NGÃI is the investor of 99 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code