Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Công ty Thủy điện Đồng Nai 5 - TKV as follows:
- Has relationships with 2 project owners.
- Has relationships with 59 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 94 contractor selection plans with a total of 100 bidding packages, of which 88 prequalification documents have not found the investment project.
- Has invited bids for 36 packages (with 38 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 31 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.75 contractors.
- Breakdown by bidding field: Goods 26.32%, Construction 57.89%, Consultancy 7.89%, Non-consultancy 7.89%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 76,761,807,447 VND, of which the total winning bid value is: 72,880,923,422 VND.
- The savings rate is: 5.06%.
Data analysis results of DauThau.info software for bid solicitors Công ty Thủy điện Đồng Nai 5 - TKV as follows:
- Has relationships with 59 contractor.
- The average number of contractors participating in each bidding package is: 1.75 contractors.
- Proportion of bidding fields: Goods 26.32%, Construction 57.89%, Consulting 7.89%, Non-consulting 7.89%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 76,761,807,447 VND, in which the total winning value is: 72,880,923,422 VND.
- The savings rate is: 5.06%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty Thủy điện Đồng Nai 5 - TKV are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 91 contractor selection plans, of which 91 were self-published, and 0 were published by other entities.
- Is the investor of 33 Tender Notices, of which 33 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the results of the bidding package Procurement of auxiliary materials, retail and regular repair in the 3rd phase of 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV.
- Winning bidder: Công ty Cổ Phần Như Dương
04/10/2022 15:06
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Supply vibration sensor IN-081 turbine drive H1 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
03/08/2022 16:55
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Troubleshooting the broken power pole No. 178 22kv . line of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
03/08/2022 16:42
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Category: Repair of architectural objects in 2022, Section: Waterproofing treatment downstream of Dong Nai 5 . hydroelectric dam of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
29/07/2022 06:27
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Periodic inspection of electricity metering system of Dong Nai 5 hydropower plant in 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
15/07/2022 17:16
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Supplying small and small consumables for SCTX phase 2 in 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
01/07/2022 09:37
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Fostering repair workers in 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
29/06/2022 16:50
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Providing domestic tourism services in 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
28/06/2022 15:35
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Experiment with pressure gauge system with rotating hand in 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
27/06/2022 16:38
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the results of the bidding package Package 3: Construction of items: Repair of architectural objects in 2022, Section: Construction of factory aluminum ceiling of the investor Công ty Thủy điện Đồng Nai 5 - TKV.
- Winning bidder: CÔNG TY TNHH XD & TM THÀNH PHÁT ICC
24/06/2022 14:13
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Thủy điện Đồng Nai 5 - TKV announced the results of the bid package Procurement of auxiliary materials, retail and regular repair in the 3rd phase of 2022 .
- Winning bidder: Công ty Cổ Phần Như Dương
04/10/2022 15:06
Công ty Thủy điện Đồng Nai 5 - TKV announced the results of the bidding package Procurement of auxiliary materials, retail and regular repair in the 3rd phase of 2022 with 2 participating contractors .
14/09/2022 15:49
Công ty Thủy điện Đồng Nai 5 - TKV publishes Tender Notice Procurement of auxiliary materials, retail and regular repair in the 3rd phase of 2022 in the form National Competitive Bidding .
05/09/2022 22:02
Công ty Thủy điện Đồng Nai 5 - TKV announced the results of the bidding package Procurement of auxiliary materials, retail and regular repair in the 3rd phase of 2022 with 1 participating contractors .
29/08/2022 14:02
Công ty Thủy điện Đồng Nai 5 - TKV publishes Tender Notice Procurement of auxiliary materials, retail and regular repair in the 3rd phase of 2022 in the form National Competitive Bidding .
17/08/2022 14:26
Công ty Thủy điện Đồng Nai 5 - TKV publishes the plan Supply vibration sensor IN-081 turbine drive H1 with 1 bidding package .
03/08/2022 16:55
Công ty Thủy điện Đồng Nai 5 - TKV publishes the plan Troubleshooting the broken power pole No. 178 22kv . line with 1 bidding package .
03/08/2022 16:42
Công ty Thủy điện Đồng Nai 5 - TKV publishes the plan Category: Repair of architectural objects in 2022, Section: Waterproofing treatment downstream of Dong Nai 5 . hydroelectric dam with 1 bidding package .
29/07/2022 06:27
Công ty Thủy điện Đồng Nai 5 - TKV publishes the plan Periodic inspection of electricity metering system of Dong Nai 5 hydropower plant in 2022 with 1 bidding package .
15/07/2022 17:16
Công ty Thủy điện Đồng Nai 5 - TKV publishes the plan Supplying small and small consumables for SCTX phase 2 in 2022 with 1 bidding package .
01/07/2022 09:37
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the results of the bidding package Procurement of auxiliary materials, retail and regular repair in the 3rd phase of 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV.
- Winning bidder: Công ty Cổ Phần Như Dương
04/10/2022 15:06
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Supply vibration sensor IN-081 turbine drive H1 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
03/08/2022 16:55
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Troubleshooting the broken power pole No. 178 22kv . line of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
03/08/2022 16:42
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Category: Repair of architectural objects in 2022, Section: Waterproofing treatment downstream of Dong Nai 5 . hydroelectric dam of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
29/07/2022 06:27
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Periodic inspection of electricity metering system of Dong Nai 5 hydropower plant in 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
15/07/2022 17:16
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Supplying small and small consumables for SCTX phase 2 in 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
01/07/2022 09:37
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Fostering repair workers in 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
29/06/2022 16:50
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Providing domestic tourism services in 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
28/06/2022 15:35
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the request Experiment with pressure gauge system with rotating hand in 2022 of the investor Công ty Thủy điện Đồng Nai 5 - TKV with 1 bidding package.
27/06/2022 16:38
The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted the results of the bidding package Package 3: Construction of items: Repair of architectural objects in 2022, Section: Construction of factory aluminum ceiling of the investor Công ty Thủy điện Đồng Nai 5 - TKV.
- Winning bidder: CÔNG TY TNHH XD & TM THÀNH PHÁT ICC
24/06/2022 14:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty Thủy điện Đồng Nai 5 - TKV has posted 94 of the contractor selection plan, which contains 100 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted 38 Tender Notices in 36 bidding packages. Among these, 31 Tender Notices were self-invited, and 7 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has posted 31 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 31 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has a relationship with 59 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Thủy điện Đồng Nai 5 - TKV has a relationship with 10 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Công ty Thủy điện Đồng Nai 5 - TKV has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects