Data analysis results of DauThau.info software for bid solicitors Power Transmission Company No 3 as follows:
- Has relationships with 5 project owners.
- Has relationships with 388 contractor.
- Announced 23 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 554 contractor selection plans with a total of 1032 bidding packages, of which 469 prequalification documents have not found the investment project.
- Has invited bids for 605 packages (with 650 tender notices), and conducted prequalification for 0 packages.
- There are 19 bidding packages with content that needs clarification.
- Announced the results of 418 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 63 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 524 packages that have not fully posted the contractor selection results. Of these 487 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.36 contractors.
- Breakdown by bidding field: Goods 53.23%, Construction 15.69%, Consultancy 16.62%, Non-consultancy 14.31%, Mixed 0.15%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,204,027,006,018 VND, of which the total winning bid value is: 2,065,484,350,481 VND.
- The savings rate is: 35.53%.
Data analysis results of DauThau.info software for bid solicitors Power Transmission Company No 3 as follows:
- Has relationships with 388 contractor.
- The average number of contractors participating in each bidding package is: 2.36 contractors.
- Proportion of bidding fields: Goods 53.23%, Construction 15.69%, Consulting 16.62%, Non-consulting 14.31%, Mixed 0.15%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,204,027,006,018 VND, in which the total winning value is: 2,065,484,350,481 VND.
- The savings rate is: 35.53%.
This Bid solicitor is also an investor. The analysis results of data for the investor Power Transmission Company No 3 are as follows:
- Is the investor of 23 development investment projects.
- Is the investor of 575 contractor selection plans, of which 454 were self-published, and 121 were published by other entities.
- Is the investor of 458 Tender Notices, of which 405 were self-invited, and 53 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Power Transmission Company No 3 publishes the plan Equip vehicles for direct workers by 2026 with 1 bidding package .
16/04/2026 15:26
Power Transmission Company No 3 publishes the plan Contractor selection plan Item: Purchasing 500kV isolator ceramic supports to return to EVNNPT's strategic reserve materials warehouse located at PTC3 with 1 bidding package .
15/04/2026 16:58
Power Transmission Company No 3 publishes the plan Equipped with safety tools and construction tools for PTC3's production in 2026 with 1 bidding package .
15/04/2026 14:10
Power Transmission Company No 3 publishes the plan Item: Relocating information technology equipment at 12 Tran Hung Dao to TTGSVH - B03 and moving the working location of information technology department at 12 Tran Hung Dao to Khanh Hoa Central Production University - 10 Le Hong Phong with 2 bidding package .
26/03/2026 16:08
Power Transmission Company No 3 publishes the plan Plan to adjust contractor selection Item: Purchase of spare materials and equipment for production of Power Transmission Company 3 - Transformer Station part implemented by the Company (Package 05/SX2026/PTC3) with 1 bidding package .
25/03/2026 14:37
Power Transmission Company No 3 publishes the plan Plan for selecting procurement contractors to serve the construction of major repairs in 2026 of Power Transmission Company 3 (Phase 5) with 1 bidding package .
25/03/2026 10:43
Power Transmission Company No 3 publishes the plan Contractor selection plan (construction phase). Project: Equipping lightning protection valves for feeder compartments with voltage levels of 110 kV or less at 220 kV and 500 kV transformer stations with 4 bidding package .
24/03/2026 14:04
Power Transmission Company No 3 publishes the plan Plan to select contractors to serve the construction of major repairs in 2026 of Power Transmission Company 3 (phase 4) with 4 bidding package .
22/03/2026 18:00
Power Transmission Company No 3 publishes the plan Plan to select contractors to serve the construction of major repairs in 2026 of Power Transmission Company 3 (phase 2) with 6 bidding package .
20/03/2026 08:22
Power Transmission Company No 3 publishes the plan Adjusted contractor selection plan - Item: Purchase of spare materials and equipment for production of Power Transmission Company 3 - Transformer Station part implemented by the Company with 1 bidding package .
20/03/2026 08:14
The data sheet has been partially hidden, to see the full information please Login or Register
Power Transmission Company No 3 publishes the plan The plan to select contractors of Project Project, equipped with VTTB for storage warehouse and B03 operating center of PTC3 and procurement, equipped with VTTB for Archives and operating center B03 of PTC3 from production costs. with 3 bidding package .
28/06/2025 09:58
Power Transmission Company No 3 publishes the plan Shopping for major repair in 2025 of Power Transmission Company 3 (phase 3) with 2 bidding package .
27/06/2025 10:15
Power Transmission Company No 3 publishes the plan Plan for contractor selection Package 01/SCTX2025/TTĐLL: Installation of partitions and repairing ditches to control 420KV transformer station - Unit: Dak Lak Power Transmission with 1 bidding package .
03/06/2025 14:45
Power Transmission Company No 3 publishes the plan Plan for selecting contractors providing equipment and equipment and configuration of fire protection signal, SCADA channel at 500kV Pleiku 2 TBA belongs to SCTX plan in 2025, unit: Gia Lai Power Transmission with 1 bidding package .
01/06/2025 12:16
Power Transmission Company No 3 publishes the plan Plan for selecting large repair contractors in 2026 - Unit: Dak Lak Power Transmission with 1 bidding package .
28/05/2025 08:12
Power Transmission Company No 3 publishes the plan Plan for regular repair contractors in 2025 - Unit: Gia Lai Power Transmission, Works: 500kV Pleiku Transformer Station, Category: Auxiliary and Service Equipment, Category: Repair of Electrical Electrical Course KH501 and KH502 with 1 bidding package .
27/05/2025 22:13
Power Transmission Company No 3 publishes the plan Plan for selecting contractor 2 projects: equipped with cars instead of cars do not specify the time of circulation, long -term use, depreciation, difficult to repair with 1 bidding package .
27/05/2025 09:24
Power Transmission Company No 3 publishes the plan Equipped with office uniform EVNNPT in 2025 with 1 bidding package .
22/05/2025 15:41
Power Transmission Company No 3 publishes the plan Contractor selection plan (phase 3) Package: Repair and replacement of BYPASS CLASS CUTTING MACHINE 220 KV Large repair works in 2025 - Concentrated bidding section with 1 bidding package .
20/05/2025 15:40
Power Transmission Company No 3 publishes the plan Contractor selection plan (phase 2) - Project: Application of online surveillance technology of connection temperature, contact points at 500KV Vinh Tan TBA with 3 bidding package .
20/05/2025 14:10
The data sheet has been partially hidden, to see the full information please Login or Register
Power Transmission Company No 3 publishes the plan Equip vehicles for direct workers by 2026 with 1 bidding package .
16/04/2026 15:26
Power Transmission Company No 3 publishes the plan Contractor selection plan Item: Purchasing 500kV isolator ceramic supports to return to EVNNPT's strategic reserve materials warehouse located at PTC3 with 1 bidding package .
15/04/2026 16:58
Power Transmission Company No 3 publishes the plan Equipped with safety tools and construction tools for PTC3's production in 2026 with 1 bidding package .
15/04/2026 14:10
Power Transmission Company No 3 publishes the plan Item: Relocating information technology equipment at 12 Tran Hung Dao to TTGSVH - B03 and moving the working location of information technology department at 12 Tran Hung Dao to Khanh Hoa Central Production University - 10 Le Hong Phong with 2 bidding package .
26/03/2026 16:08
Power Transmission Company No 3 publishes the plan Plan to adjust contractor selection Item: Purchase of spare materials and equipment for production of Power Transmission Company 3 - Transformer Station part implemented by the Company (Package 05/SX2026/PTC3) with 1 bidding package .
25/03/2026 14:37
Power Transmission Company No 3 publishes the plan Plan for selecting procurement contractors to serve the construction of major repairs in 2026 of Power Transmission Company 3 (Phase 5) with 1 bidding package .
25/03/2026 10:43
Power Transmission Company No 3 publishes the plan Contractor selection plan (construction phase). Project: Equipping lightning protection valves for feeder compartments with voltage levels of 110 kV or less at 220 kV and 500 kV transformer stations with 4 bidding package .
24/03/2026 14:04
Power Transmission Company No 3 publishes the plan Plan to select contractors to serve the construction of major repairs in 2026 of Power Transmission Company 3 (phase 4) with 4 bidding package .
22/03/2026 18:00
Power Transmission Company No 3 publishes the plan Plan to select contractors to serve the construction of major repairs in 2026 of Power Transmission Company 3 (phase 2) with 6 bidding package .
20/03/2026 08:22
Power Transmission Company No 3 publishes the plan Adjusted contractor selection plan - Item: Purchase of spare materials and equipment for production of Power Transmission Company 3 - Transformer Station part implemented by the Company with 1 bidding package .
20/03/2026 08:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Power Transmission Company No 3 has posted 554 of the contractor selection plan, which contains 1032 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Power Transmission Company No 3 has posted 650 Tender Notices in 605 bidding packages. Among these, 295 Tender Notices were self-invited, and 355 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Power Transmission Company No 3 has posted 418 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 418 package, canceled the bid 1 package (among the bidding packages above).
- There are 63 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Power Transmission Company No 3 has a relationship with 388 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Power Transmission Company No 3 has a relationship with 30 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Power Transmission Company No 3 has a relationship with 6 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects