Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors CỤC QUẢN LÝ ĐƯỜNG BỘ IV as follows:
- Has relationships with 2 project owners.
- Has relationships with 69 contractor.
- Announced 245 investment development project, of which 31 projects have not yet announced the prequalification documents.
- Announced 156 contractor selection plans with a total of 310 bidding packages, of which 34 prequalification documents have not found the investment project.
- Has invited bids for 262 packages (with 270 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 145 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 60 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 197 packages that have not fully posted the contractor selection results. Of these 171 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.03 contractors.
- Breakdown by bidding field: Goods 5.56%, Construction 89.63%, Consultancy 4.81%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 491,392,837,855 VND, of which the total winning bid value is: 485,296,721,449 VND.
- The savings rate is: 1.24%.
Data analysis results of DauThau.info software for bid solicitors CỤC QUẢN LÝ ĐƯỜNG BỘ IV as follows:
- Has relationships with 69 contractor.
- The average number of contractors participating in each bidding package is: 1.03 contractors.
- Proportion of bidding fields: Goods 5.56%, Construction 89.63%, Consulting 4.81%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 491,392,837,855 VND, in which the total winning value is: 485,296,721,449 VND.
- The savings rate is: 1.24%.
This Bid solicitor is also an investor. The analysis results of data for the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV are as follows:
- Is the investor of 245 development investment projects.
- Is the investor of 289 contractor selection plans, of which 124 were self-published, and 165 were published by other entities.
- Is the investor of 282 Tender Notices, of which 109 were self-invited, and 173 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the results of the bidding package Procurement of equipment, ferry machines of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ THƯƠNG MẠI HÀNG HẢI PHÚ THỊNH
22/07/2022 14:48
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the results of the bidding package Construction and repair of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV.
- Winning bidder: CÔNG TY TNHH CƠ KHÍ MINH TÙNG
09/07/2022 12:44
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the results of the bidding package Construction and repair of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV.
- Winning bidder: CÔNG TY TNHH CƠ KHÍ MINH TÙNG
09/07/2022 12:32
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the request Processing floor to access the bridge - ponton bank A and bank F, Dai Ngai ferry, Vam Cong ferry cluster of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV with 3 bidding package.
09/07/2022 12:28
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the request Processing floor to access the bridge - ponton bank A and bank F, Dai Ngai ferry, Vam Cong ferry cluster of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV with 3 bidding package.
09/07/2022 12:22
Investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted an investment and development project Processing floor to access the bridge - ponton bank A and bank F, Dai Ngai ferry, Vam Cong ferry cluster.
09/07/2022 07:00
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the results of the bidding package Equipment Purchasing of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ THƯƠNG MẠI HÀNG HẢI PHÚ THỊNH
24/06/2022 19:03
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the results of the bidding package Equipment Purchasing of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV.
- Winning bidder: CÔNG TY TNHH KỸ THUẬT DỊCH VỤ SONG LONG
15/06/2022 16:10
Bid solicitor Công ty cổ phần Phan Vĩnh Thuận has posted Tender Notice Repair works of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV with the form National competitive bidding.
13/06/2022 11:17
The Bid solicitor Công ty cổ phần Phan Vĩnh Thuận has posted the request Repair damaged foundation, road surface, complete traffic safety system in the sections of km34+500 – km36+200; km39+000 – km46+300; repair the drainage system at km66+570 – km66+930 (T) National Highway 20, Dong Nai province. of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV with 4 bidding package.
13/06/2022 10:38
The data sheet has been partially hidden, to see the full information please Login or Register
CỤC QUẢN LÝ ĐƯỜNG BỘ IV announced the results of the bid package Procurement of equipment, ferry machines .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ THƯƠNG MẠI HÀNG HẢI PHÚ THỊNH
22/07/2022 14:48
CỤC QUẢN LÝ ĐƯỜNG BỘ IV announced the results of the bid package Construction and repair .
- Winning bidder: CÔNG TY TNHH CƠ KHÍ MINH TÙNG
09/07/2022 12:44
CỤC QUẢN LÝ ĐƯỜNG BỘ IV announced the results of the bid package Construction and repair .
- Winning bidder: CÔNG TY TNHH CƠ KHÍ MINH TÙNG
09/07/2022 12:32
CỤC QUẢN LÝ ĐƯỜNG BỘ IV publishes the plan Processing floor to access the bridge - ponton bank A and bank F, Dai Ngai ferry, Vam Cong ferry cluster with 3 bidding package .
09/07/2022 12:28
CỤC QUẢN LÝ ĐƯỜNG BỘ IV publishes the plan Processing floor to access the bridge - ponton bank A and bank F, Dai Ngai ferry, Vam Cong ferry cluster with 3 bidding package .
09/07/2022 12:22
CỤC QUẢN LÝ ĐƯỜNG BỘ IV announced the results of the bid package Equipment Purchasing .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ THƯƠNG MẠI HÀNG HẢI PHÚ THỊNH
24/06/2022 19:03
CỤC QUẢN LÝ ĐƯỜNG BỘ IV announced the results of the bid package Equipment Purchasing .
- Winning bidder: CÔNG TY TNHH KỸ THUẬT DỊCH VỤ SONG LONG
15/06/2022 16:10
CỤC QUẢN LÝ ĐƯỜNG BỘ IV announced the results of the bidding package Equipment Purchasing with 2 participating contractors .
08/06/2022 17:20
CỤC QUẢN LÝ ĐƯỜNG BỘ IV announced the results of the bid package Construction and repair .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ HOÀNG HẢI
06/06/2022 22:08
CỤC QUẢN LÝ ĐƯỜNG BỘ IV announced the results of the bid package Construction and repair .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ HOÀNG HẢI
06/06/2022 19:17
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the results of the bidding package Procurement of equipment, ferry machines of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ THƯƠNG MẠI HÀNG HẢI PHÚ THỊNH
22/07/2022 14:48
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the results of the bidding package Construction and repair of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV.
- Winning bidder: CÔNG TY TNHH CƠ KHÍ MINH TÙNG
09/07/2022 12:44
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the results of the bidding package Construction and repair of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV.
- Winning bidder: CÔNG TY TNHH CƠ KHÍ MINH TÙNG
09/07/2022 12:32
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the request Processing floor to access the bridge - ponton bank A and bank F, Dai Ngai ferry, Vam Cong ferry cluster of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV with 3 bidding package.
09/07/2022 12:28
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the request Processing floor to access the bridge - ponton bank A and bank F, Dai Ngai ferry, Vam Cong ferry cluster of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV with 3 bidding package.
09/07/2022 12:22
Investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted an investment and development project Processing floor to access the bridge - ponton bank A and bank F, Dai Ngai ferry, Vam Cong ferry cluster.
09/07/2022 07:00
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the results of the bidding package Equipment Purchasing of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV.
- Winning bidder: CÔNG TY TNHH DỊCH VỤ THƯƠNG MẠI HÀNG HẢI PHÚ THỊNH
24/06/2022 19:03
The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted the results of the bidding package Equipment Purchasing of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV.
- Winning bidder: CÔNG TY TNHH KỸ THUẬT DỊCH VỤ SONG LONG
15/06/2022 16:10
Bid solicitor Công ty cổ phần Phan Vĩnh Thuận has posted Tender Notice Repair works of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV with the form National competitive bidding.
13/06/2022 11:17
The Bid solicitor Công ty cổ phần Phan Vĩnh Thuận has posted the request Repair damaged foundation, road surface, complete traffic safety system in the sections of km34+500 – km36+200; km39+000 – km46+300; repair the drainage system at km66+570 – km66+930 (T) National Highway 20, Dong Nai province. of the investor CỤC QUẢN LÝ ĐƯỜNG BỘ IV with 4 bidding package.
13/06/2022 10:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted 156 of the contractor selection plan, which contains 310 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted 270 Tender Notices in 262 bidding packages. Among these, -6 Tender Notices were self-invited, and 276 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has posted 145 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 145 package, canceled the bid 0 package (among the bidding packages above).
- There are 60 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has a relationship with 69 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CỤC QUẢN LÝ ĐƯỜNG BỘ IV has a relationship with 16 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity CỤC QUẢN LÝ ĐƯỜNG BỘ IV has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects