Data analysis results of DauThau.info software for bid solicitors EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD as follows:
- Has relationships with 1 project owners.
- Has relationships with 117 contractor.
- Announced 3 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 91 contractor selection plans with a total of 93 bidding packages, of which 87 prequalification documents have not found the investment project.
- Has invited bids for 108 packages (with 118 tender notices), and conducted prequalification for 0 packages.
- There are 6 bidding packages with content that needs clarification.
- Announced the results of 100 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 6 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 10 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.75 contractors.
- Breakdown by bidding field: Goods 24.58%, Construction 28.81%, Consultancy 5.93%, Non-consultancy 39.83%, Mixed 0.85%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 183,759,032,835 VND, of which the total winning bid value is: 176,046,537,146 VND.
- The savings rate is: 4.20%.
Data analysis results of DauThau.info software for bid solicitors EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD as follows:
- Has relationships with 117 contractor.
- The average number of contractors participating in each bidding package is: 1.75 contractors.
- Proportion of bidding fields: Goods 24.58%, Construction 28.81%, Consulting 5.93%, Non-consulting 39.83%, Mixed 0.85%, Other 0%.
- The total value according to the bidding package with valid IMP is: 183,759,032,835 VND, in which the total winning value is: 176,046,537,146 VND.
- The savings rate is: 4.20%.
This Bid solicitor is also an investor. The analysis results of data for the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 75 contractor selection plans, of which 75 were self-published, and 0 were published by other entities.
- Is the investor of 106 Tender Notices, of which 106 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 33 bidding packages with 9 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Repair the 5th floor LED logo system, podium, EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
19/06/2025 16:20
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the request Contractor selection plan
Procurement estimates: Repairing LED logo system on the 5th floor, podium, EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD with 1 bidding package.
19/06/2025 10:59
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package Emergency repair of oil -absorbing incidents at the oil drying set of Chiller No. 2 .
- Winning bidder: Carrier Vietnam Air Conditioning Company Limited
18/06/2025 15:25
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2025-01: Construction (I) replaces Granite 2 RAM and DA3 walls; (ii) Replace sliding power blinds standing the hall of the EVN building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG NHÀ HÀ NỘI
18/06/2025 15:13
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Replace valves of all kinds, filtering, soft connection at some locations in the chiller room and water division of 02 cooling towers No. 3 and No. 4 of the air -conditioning system of EVN Building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: NGOC LINH TECHNICAL AND TRADING JOINT STOCK COMPANY
16/06/2025 17:20
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2025-04: CWB02 + CWB03 insulation film from 5B - 29B floor; Replace EcoPhone ceiling panels of 7B, 8B, 9B and 21B floors with ceiling plates equivalent to EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
16/06/2025 09:53
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2024-02: Construction of waterproofing aluminum glass wall system and aluminum aluminum panel on the outside of EVN building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
16/06/2025 09:52
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package Replace 03 LED screens of the transplant screen system at the 1st floor reception hall .
- Winning bidder: D&T VIET NAM MECHANICAL ELECTRICAL JOINT STOCK COMPANY
05/06/2025 14:11
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Supply chemicals for cold water sugar system EVN Building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: MINH HOANG REVIVE AQUA NATURE COMPANY LIMITED
04/06/2025 15:09
Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted Tender Notice Equipped with enhanced air conditioning systems and supplemented UPS sources for A0, A1 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD with the form Open bidding.
30/05/2025 15:03
The data sheet has been partially hidden, to see the full information please Login or Register
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package Repair the 5th floor LED logo system, podium, EVN building in 2025 .
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
19/06/2025 16:20
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD publishes the plan Contractor selection plan
Procurement estimates: Repairing LED logo system on the 5th floor, podium, EVN building in 2025 with 1 bidding package .
19/06/2025 10:59
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package SCL 2025-01: Construction (I) replaces Granite 2 RAM and DA3 walls; (ii) Replace sliding power blinds standing the hall of the EVN building .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG NHÀ HÀ NỘI
18/06/2025 15:13
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package Replace valves of all kinds, filtering, soft connection at some locations in the chiller room and water division of 02 cooling towers No. 3 and No. 4 of the air -conditioning system of EVN Building .
- Winning bidder: NGOC LINH TECHNICAL AND TRADING JOINT STOCK COMPANY
16/06/2025 17:20
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package SCL 2025-04: CWB02 + CWB03 insulation film from 5B - 29B floor; Replace EcoPhone ceiling panels of 7B, 8B, 9B and 21B floors with ceiling plates equivalent to EVN building in 2025 .
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
16/06/2025 09:53
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package SCL 2024-02: Construction of waterproofing aluminum glass wall system and aluminum aluminum panel on the outside of EVN building .
- Winning bidder: SON HA TRADING SERVICE AND CONSTRUCTION COMPANY LIMITED
16/06/2025 09:52
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bidding package Replace valves of all types, filters, soft connections at some locations in the Chiller room and water divider panels of 02 cooling towers No. 3 and No. 4 of the air conditioning system of EVN Building with 1 participating contractors .
05/06/2025 14:13
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bidding package SCL 2025-01: Construction (I) replaces Granite 2 RAM and DA3 walls; (ii) Replace sliding power blinds standing the hall of the EVN building with 1 participating contractors .
05/06/2025 10:54
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package Supply chemicals for cold water sugar system EVN Building .
- Winning bidder: MINH HOANG REVIVE AQUA NATURE COMPANY LIMITED
04/06/2025 15:09
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bidding package SCL 2025-04: CWB02 + CWB03 insulation film from 5B - 29B floor; Replace EcoPhone ceiling panels of 7B, 8B, 9B and 21B floors with ceiling plates equivalent to EVN building in 2025 with 1 participating contractors .
04/06/2025 09:57
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Repair the 5th floor LED logo system, podium, EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
19/06/2025 16:20
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the request Contractor selection plan
Procurement estimates: Repairing LED logo system on the 5th floor, podium, EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD with 1 bidding package.
19/06/2025 10:59
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package Emergency repair of oil -absorbing incidents at the oil drying set of Chiller No. 2 .
- Winning bidder: Carrier Vietnam Air Conditioning Company Limited
18/06/2025 15:25
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2025-01: Construction (I) replaces Granite 2 RAM and DA3 walls; (ii) Replace sliding power blinds standing the hall of the EVN building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG NHÀ HÀ NỘI
18/06/2025 15:13
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Replace valves of all kinds, filtering, soft connection at some locations in the chiller room and water division of 02 cooling towers No. 3 and No. 4 of the air -conditioning system of EVN Building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: NGOC LINH TECHNICAL AND TRADING JOINT STOCK COMPANY
16/06/2025 17:20
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2025-04: CWB02 + CWB03 insulation film from 5B - 29B floor; Replace EcoPhone ceiling panels of 7B, 8B, 9B and 21B floors with ceiling plates equivalent to EVN building in 2025 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: XDTC GLOBAL TECHNOLOGY AND CONSTRUCTION COMPANY LIMITED
16/06/2025 09:53
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package SCL 2024-02: Construction of waterproofing aluminum glass wall system and aluminum aluminum panel on the outside of EVN building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
16/06/2025 09:52
EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD announced the results of the bid package Replace 03 LED screens of the transplant screen system at the 1st floor reception hall .
- Winning bidder: D&T VIET NAM MECHANICAL ELECTRICAL JOINT STOCK COMPANY
05/06/2025 14:11
The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted the results of the bidding package Supply chemicals for cold water sugar system EVN Building of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD.
- Winning bidder: MINH HOANG REVIVE AQUA NATURE COMPANY LIMITED
04/06/2025 15:09
Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted Tender Notice Equipped with enhanced air conditioning systems and supplemented UPS sources for A0, A1 of the investor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD with the form Open bidding.
30/05/2025 15:03
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted 91 of the contractor selection plan, which contains 93 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted 118 Tender Notices in 108 bidding packages. Among these, 106 Tender Notices were self-invited, and 12 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has posted 100 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 100 package, canceled the bid 0 package (among the bidding packages above).
- There are 6 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has a relationship with 117 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has a relationship with 8 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity EVN CONSTRUCTION AND TECHNOLOGY INVESTMENT MANAGEMENT BOARD has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects