Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors halongbay as follows:
- Has relationships with 1 project owners.
- Has relationships with 122 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 209 contractor selection plans with a total of 297 bidding packages, of which 206 prequalification documents have not found the investment project.
- Has invited bids for 123 packages (with 149 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 161 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 65 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 155 packages that have not fully posted the contractor selection results. Of these 148 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.64 contractors.
- Breakdown by bidding field: Goods 18.12%, Construction 30.20%, Consultancy 2.68%, Non-consultancy 48.99%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 310,504,021,281 VND, of which the total winning bid value is: 299,635,985,955 VND.
- The savings rate is: 3.50%.
Data analysis results of DauThau.info software for bid solicitors halongbay as follows:
- Has relationships with 122 contractor.
- The average number of contractors participating in each bidding package is: 1.64 contractors.
- Proportion of bidding fields: Goods 18.12%, Construction 30.20%, Consulting 2.68%, Non-consulting 48.99%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 310,504,021,281 VND, in which the total winning value is: 299,635,985,955 VND.
- The savings rate is: 3.50%.
This Bid solicitor is also an investor. The analysis results of data for the investor halongbay are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 194 contractor selection plans, of which 188 were self-published, and 6 were published by other entities.
- Is the investor of 133 Tender Notices, of which 132 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
halongbay publishes the plan Purchasing stationery in the fourth quarter of 2025 for units under the Board according to fixed norms in the internal spending regulations of the Ha Long Bay Management Board with 1 bidding package .
21/10/2025 15:15
halongbay announced the results of the bid package Consulting to build a jar of anchoring area and scan obstacles in the water area .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ PHÁT TRIỂN HẠ TẦNG QUẢNG NINH
24/09/2025 15:33
halongbay publishes the plan Consulting to build a jar of anchoring area and scan obstacles in the water area with 1 bidding package .
24/09/2025 15:29
halongbay announced the results of the bid package Procurement of materials for units under the committee according to the contracting norms at the internal spending regulations of the September, October, November, December 2025 .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Kim Dung
23/09/2025 15:52
halongbay publishes the plan Procurement of materials for units under the committee according to the contracting norm at the internal spending regulations of the Board - September, October, November, December 2025 with 1 bidding package .
23/09/2025 15:42
halongbay announced the results of the bid package Destroy the bridge and wooden floors in the top of the wooden cave at the conservation center I .
- Winning bidder: Công ty cổ phần tư vấn, môi trường PTT
22/09/2025 14:23
halongbay publishes the plan Destroy the bridge and wooden floors in the top of the wooden cave at the conservation center I with 1 bidding package .
22/09/2025 14:20
halongbay announced the results of the bid package Supply and install the solar power system stored at the starting point of the wooden head .
- Winning bidder: ROBIN PROSPERITY COMPANY LIMITED
22/09/2025 14:13
halongbay publishes the plan Supply and install the solar power system stored at the starting point of the wooden head with 1 bidding package .
18/09/2025 15:53
halongbay announced the results of the bid package Buy 100CV Yamaha machine and complete the registration file QN 5497, QN-6393, QN-6394 .
- Winning bidder: Công ty TNHH Phương Thành Vinh Vân Đồn Quảng Ninh
04/09/2025 07:53
The data sheet has been partially hidden, to see the full information please Login or Register
halongbay announced the results of the bid package Hiring a means of transporting officials and employees working at the working points of the conservation center II while the pearl of the Lan Lan QN-1558 to the momentum, repair, maintenance and registration .
- Winning bidder: CÔNG TY TNHH 1 THÀNH VIÊN NAM TÙNG
15/07/2025 14:09
halongbay publishes the plan Hiring a means of transporting officials and employees working at the working points of the conservation center II while the pearl of the Lan Lan QN-1558 to the momentum, repair, maintenance and registration with 1 bidding package .
15/07/2025 14:06
halongbay announced the results of the bid package Collaborate garbage at the gathering point from the train to the car manually and transport the garbage to the waste treatment area .
- Winning bidder: CÔNG TY TNHH MÔI TRƯỜNG PHƯƠNG NAM 66
04/07/2025 14:04
halongbay announced the results of the bid package Renting vehicles for garbage collection at the foot of the island, collecting and transporting garbage floating on Ha Long Bay .
- Winning bidder: CÔNG TY CỔ PHẦN DS3
30/06/2025 11:14
halongbay announced the results of the bidding package Collaborate garbage at the gathering point from the train to the car manually and transport the garbage to the waste treatment area with 1 participating contractors .
30/06/2025 10:00
halongbay publishes Tender Notice Renting mediums for transportation of officials and employees working at the working points of the Conservation Center III in the form Competitive Offer .
27/06/2025 10:13
halongbay announced the results of the bid package Installing solar battery system at grass work .
- Winning bidder: Hộ Kinh doanh Robin thịnh vượng
25/06/2025 14:06
halongbay announced the results of the bidding package Renting vehicles for garbage collection at the foot of the island, collecting and transporting garbage floating on Ha Long Bay with 1 participating contractors .
25/06/2025 10:08
halongbay publishes Tender Notice Collaborate garbage at the gathering point from the train to the car manually and transport the garbage to the waste treatment area in the form Competitive Offer .
16/06/2025 10:33
halongbay publishes Tender Notice Renting vehicles for garbage collection at the foot of the island, collecting and transporting garbage floating on Ha Long Bay in the form Open bidding .
16/06/2025 10:33
The data sheet has been partially hidden, to see the full information please Login or Register
halongbay publishes the plan Purchasing stationery in the fourth quarter of 2025 for units under the Board according to fixed norms in the internal spending regulations of the Ha Long Bay Management Board with 1 bidding package .
21/10/2025 15:15
halongbay announced the results of the bid package Consulting to build a jar of anchoring area and scan obstacles in the water area .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ PHÁT TRIỂN HẠ TẦNG QUẢNG NINH
24/09/2025 15:33
halongbay publishes the plan Consulting to build a jar of anchoring area and scan obstacles in the water area with 1 bidding package .
24/09/2025 15:29
halongbay announced the results of the bid package Procurement of materials for units under the committee according to the contracting norms at the internal spending regulations of the September, October, November, December 2025 .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Kim Dung
23/09/2025 15:52
halongbay publishes the plan Procurement of materials for units under the committee according to the contracting norm at the internal spending regulations of the Board - September, October, November, December 2025 with 1 bidding package .
23/09/2025 15:42
halongbay announced the results of the bid package Destroy the bridge and wooden floors in the top of the wooden cave at the conservation center I .
- Winning bidder: Công ty cổ phần tư vấn, môi trường PTT
22/09/2025 14:23
halongbay publishes the plan Destroy the bridge and wooden floors in the top of the wooden cave at the conservation center I with 1 bidding package .
22/09/2025 14:20
halongbay announced the results of the bid package Supply and install the solar power system stored at the starting point of the wooden head .
- Winning bidder: ROBIN PROSPERITY COMPANY LIMITED
22/09/2025 14:13
halongbay publishes the plan Supply and install the solar power system stored at the starting point of the wooden head with 1 bidding package .
18/09/2025 15:53
halongbay announced the results of the bid package Buy 100CV Yamaha machine and complete the registration file QN 5497, QN-6393, QN-6394 .
- Winning bidder: Công ty TNHH Phương Thành Vinh Vân Đồn Quảng Ninh
04/09/2025 07:53
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s halongbay has posted 209 of the contractor selection plan, which contains 297 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor halongbay has posted 149 Tender Notices in 123 bidding packages. Among these, 115 Tender Notices were self-invited, and 34 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor halongbay has posted 161 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 161 package, canceled the bid 0 package (among the bidding packages above).
- There are 65 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor halongbay has a relationship with 122 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor halongbay has a relationship with 24 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity halongbay has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects