Data analysis results of DauThau.info software for bid solicitors Hạt Kiểm lâm khu vực III as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 9 contractor selection plans with a total of 14 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 4 packages that have not fully posted the contractor selection results. Of these 4 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 6,443,310,457 VND, of which the total winning bid value is: 6,409,884,639 VND.
- The savings rate is: 0.52%.
Data analysis results of DauThau.info software for bid solicitors Hạt Kiểm lâm khu vực III as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 6,443,310,457 VND, in which the total winning value is: 6,409,884,639 VND.
- The savings rate is: 0.52%.
This Bid solicitor is also an investor. The analysis results of data for the investor Hạt Kiểm lâm khu vực III are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 34 contractor selection plans, of which 6 were self-published, and 28 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Hạt Kiểm lâm khu vực III publishes the plan The plan to select the contractor to implement a number of forest works items: Planting forests instead of changing the purpose of forest use to another purpose with 6 bidding package .
12/06/2026 08:10
Hạt Kiểm lâm khu vực III announced the results of the bid package Construction, care and protection of replacement forests when changing forest use purposes to other purposes within 05 years in Phu Luu commune .
- Winning bidder: Nhóm thợ thi công trồng rừng thay thế trên địa bàn xã Phù Lưu
08/05/2026 15:51
Hạt Kiểm lâm khu vực III publishes the plan Construction, care and protection of replacement forests when changing forest use purposes to other purposes within 05 years in Phu Luu commune with 1 bidding package .
05/05/2026 17:21
Hạt Kiểm lâm khu vực III announced the results of the bid package Consulting on design and estimation of silviculture projects to plant replacement forests when changing forest use purposes to other purposes. .
- Winning bidder: Trung tâm Điều tra, quy hoạch Thiết kế Nông lâm nghiệp
23/04/2026 10:52
Hạt Kiểm lâm khu vực III publishes the plan Bidding package: Consulting on design and making estimates for silvicultural works to plant replacement forests when changing forest use purposes to other purposes. with 1 bidding package .
22/04/2026 07:57
Hạt Kiểm lâm khu vực III announced the results of the bid package Procurement of NPK fertilizer materials for care in year 2, 2026 of replacement forests in 2025 .
- Winning bidder: THANH HOA LONG DIEN FERTILIZER JOINT STOCK COMPANY
22/03/2026 15:40
Hạt Kiểm lâm khu vực III publishes the plan Procurement of NPK fertilizer materials for care in year 2, 2026 of replacement forests in 2025 with 1 bidding package .
19/03/2026 11:29
Hạt Kiểm lâm khu vực III publishes the plan Procurement of NPK fertilizer materials for care in year 2, 2026 of replacement afforestation in 2025 with 1 bidding package .
17/03/2026 15:03
Hạt Kiểm lâm khu vực III announced the results of the bid package Bidding package No. 03: Construction project management consulting .
- Winning bidder: CÔNG TY TNHH HÙNG LONG TUYÊN QUANG
12/12/2025 20:16
Hạt Kiểm lâm khu vực III announced the results of the bid package Package No. 02: Construction supervision consulting. .
- Winning bidder: CÔNG TY TNHH THÁI SƠN TUYÊN QUANG
12/12/2025 20:14
The data sheet has been partially hidden, to see the full information please Login or Register
Hạt Kiểm lâm khu vực III announced the results of the bid package Package 06: Construction, tending and protecting planting forests instead when changing the purpose of using forests to other purposes in Yen Lam commune .
- Winning bidder: Nhóm thợ thi công tại xã Yên Lâm
15/05/2025 09:37
Hạt Kiểm lâm khu vực III announced the results of the bid package Package 05: Construction, tending and protecting planting forests instead when changing the purpose of using forests to other purposes in Yen Phu commune .
- Winning bidder: Nhóm thợ thi công tại xã Yên Phú
15/05/2025 09:34
Hạt Kiểm lâm khu vực III announced the results of the bid package Package 04: Construction, tending and protecting planting forests instead when changing the purpose of using forests to other purposes in Minh Huong commune .
- Winning bidder: Nhóm thợ thi công tại xã Minh Hương
15/05/2025 09:23
Hạt Kiểm lâm khu vực III announced the results of the bid package Package 03: Construction, tending and protecting planting forests instead when changing the purpose of using forests to other purposes in Thanh Long commune .
- Winning bidder: Nhóm thợ thi công tại xã Thành Long
15/05/2025 09:16
Hạt Kiểm lâm khu vực III announced the results of the bid package Package 02: The cost of buying fertilizer supplies .
- Winning bidder: THANH HOA LONG DIEN FERTILIZER JOINT STOCK COMPANY
15/05/2025 08:43
Hạt Kiểm lâm khu vực III announced the results of the bid package Package 01: The cost of buying seedlings .
- Winning bidder: HỘ KINH DOANH LẠI THỊ NHÂM
14/05/2025 14:09
Hạt Kiểm lâm khu vực III publishes the plan The plan to select contractors to implement a number of forest works items: Planting forests instead of changing the purpose of forest use to other purposes with 6 bidding package .
05/05/2025 10:12
Hạt Kiểm lâm khu vực III announced the results of the bid package Design consultancy and estimation for forest works to replace forests when changing forest use to other purposes .
- Winning bidder: Trung tâm Điều tra, quy hoạch Thiết kế Nông lâm nghiệp
15/04/2025 10:03
Hạt Kiểm lâm khu vực III publishes the plan Design consultancy and estimation for forest works to replace forests when changing forest use to other purposes with 1 bidding package .
09/04/2025 15:54
Hạt Kiểm lâm khu vực III publishes the plan Decision Approving the contractor selection plan for the door repair package of Ham Yen District Forest Ranger Department with 3 bidding package .
13/08/2024 10:32
The data sheet has been partially hidden, to see the full information please Login or Register
Hạt Kiểm lâm khu vực III publishes the plan The plan to select the contractor to implement a number of forest works items: Planting forests instead of changing the purpose of forest use to another purpose with 6 bidding package .
12/06/2026 08:10
Hạt Kiểm lâm khu vực III announced the results of the bid package Construction, care and protection of replacement forests when changing forest use purposes to other purposes within 05 years in Phu Luu commune .
- Winning bidder: Nhóm thợ thi công trồng rừng thay thế trên địa bàn xã Phù Lưu
08/05/2026 15:51
Hạt Kiểm lâm khu vực III publishes the plan Construction, care and protection of replacement forests when changing forest use purposes to other purposes within 05 years in Phu Luu commune with 1 bidding package .
05/05/2026 17:21
Hạt Kiểm lâm khu vực III announced the results of the bid package Consulting on design and estimation of silviculture projects to plant replacement forests when changing forest use purposes to other purposes. .
- Winning bidder: Trung tâm Điều tra, quy hoạch Thiết kế Nông lâm nghiệp
23/04/2026 10:52
Hạt Kiểm lâm khu vực III publishes the plan Bidding package: Consulting on design and making estimates for silvicultural works to plant replacement forests when changing forest use purposes to other purposes. with 1 bidding package .
22/04/2026 07:57
Hạt Kiểm lâm khu vực III announced the results of the bid package Procurement of NPK fertilizer materials for care in year 2, 2026 of replacement forests in 2025 .
- Winning bidder: THANH HOA LONG DIEN FERTILIZER JOINT STOCK COMPANY
22/03/2026 15:40
Hạt Kiểm lâm khu vực III publishes the plan Procurement of NPK fertilizer materials for care in year 2, 2026 of replacement forests in 2025 with 1 bidding package .
19/03/2026 11:29
Hạt Kiểm lâm khu vực III publishes the plan Procurement of NPK fertilizer materials for care in year 2, 2026 of replacement afforestation in 2025 with 1 bidding package .
17/03/2026 15:03
Hạt Kiểm lâm khu vực III announced the results of the bid package Bidding package No. 03: Construction project management consulting .
- Winning bidder: CÔNG TY TNHH HÙNG LONG TUYÊN QUANG
12/12/2025 20:16
Hạt Kiểm lâm khu vực III announced the results of the bid package Package No. 02: Construction supervision consulting. .
- Winning bidder: CÔNG TY TNHH THÁI SƠN TUYÊN QUANG
12/12/2025 20:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Hạt Kiểm lâm khu vực III has posted 9 of the contractor selection plan, which contains 14 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Hạt Kiểm lâm khu vực III has posted 1 Tender Notices in 1 bidding packages. Among these, 0 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hạt Kiểm lâm khu vực III has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Hạt Kiểm lâm khu vực III has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Hạt Kiểm lâm khu vực III has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects