Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 1 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 5 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 91,606,800 VND, of which the total winning bid value is: 91,606,800 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 91,606,800 VND, in which the total winning value is: 91,606,800 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 7 contractor selection plans, of which 4 were self-published, and 3 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN publishes the plan Plan to select contractor for car repair 37A- 00541 for Nam Dan Ranger District - Hung Nguyen with 1 bidding package .
24/07/2026 08:58
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN announced the results of the bid package Package 03: Construction and repair of works .
- Winning bidder: CÔNG TY TNHH XĂNG DẦU AN GIA
21/12/2025 07:35
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN publishes the plan Project contractor selection plan: Repair of Nam Dan Ranger Station - Hung Nguyen (Ranger Station in Song Lam area; Kitchen, corrugated iron roof of District Office; Corrugated iron roof of Hung Nguyen Ranger Station) with 1 bidding package .
21/12/2025 07:32
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN announced the results of the bid package Bidding package No. 03: Procurement and repair of works .
- Winning bidder: Nguyễn Văn Hạnh
21/12/2025 07:27
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN publishes the plan Project contractor selection plan: Procurement of hall assets (hall LED screen, fonts, flags, slogans, Uncle Ho statue podium, speech podium) with 1 bidding package .
21/12/2025 07:22
The Bid solicitor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN has posted the results of the bidding package Package No. 01: The whole construction part of the investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN.
- Winning bidder: CÔNG TY TNHH XĂNG DẦU AN GIA
28/12/2024 15:45
The Bid solicitor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN has posted the request Project contractor selection plan: Repairing fences and gates of Hung Nguyen Forest Ranger Station of the investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN with 1 bidding package.
27/12/2024 22:28
Investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN has posted an investment and development project Repair of Hung Nguyen ranger station: Repair fence and gate of Hung Nguyen ranger station.
25/12/2024 21:21
The Bid solicitor Công ty TNHH Tư vấn Xây dựng HHT Nghệ An has posted the results of the bidding package Bid package number XD-01: Construction costs of the investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN.
- Winning bidder: Song Giang consultative and incorporated stock company
28/11/2024 19:57
Bid solicitor Công ty TNHH Tư vấn Xây dựng HHT Nghệ An has posted Tender Notice Bid package number XD-01: Construction costs of the investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN with the form Competitive Offer.
15/11/2024 15:41
The data sheet has been partially hidden, to see the full information please Login or Register
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN announced the results of the bid package Package No. 01: The whole construction part .
- Winning bidder: CÔNG TY TNHH XĂNG DẦU AN GIA
28/12/2024 15:45
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN publishes the plan Project contractor selection plan: Repairing fences and gates of Hung Nguyen Forest Ranger Station with 1 bidding package .
27/12/2024 22:28
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN publishes the plan Repair of Song Lam station: Paving the yard, covering the water tank, covering the water tank, re-tiling the bathroom, installing additional accessories, painting the kitchen with 4 bidding package .
09/11/2024 13:32
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN publishes the plan Repair of Song Lam station: Paving the yard, covering the water tank, covering the water tank, re-tiling the bathroom, installing additional accessories, painting the kitchen with 4 bidding package .
09/11/2024 09:41
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN publishes the plan Repair of Song Lam station: Paving the yard, covering the water tank, covering the water tank, re-tiling the bathroom, installing additional accessories, painting the kitchen with 2 bidding package .
29/10/2024 14:53
The data sheet has been partially hidden, to see the full information please Login or Register
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN publishes the plan Plan to select contractor for car repair 37A- 00541 for Nam Dan Ranger District - Hung Nguyen with 1 bidding package .
24/07/2026 08:58
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN announced the results of the bid package Package 03: Construction and repair of works .
- Winning bidder: CÔNG TY TNHH XĂNG DẦU AN GIA
21/12/2025 07:35
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN publishes the plan Project contractor selection plan: Repair of Nam Dan Ranger Station - Hung Nguyen (Ranger Station in Song Lam area; Kitchen, corrugated iron roof of District Office; Corrugated iron roof of Hung Nguyen Ranger Station) with 1 bidding package .
21/12/2025 07:32
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN announced the results of the bid package Bidding package No. 03: Procurement and repair of works .
- Winning bidder: Nguyễn Văn Hạnh
21/12/2025 07:27
HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN publishes the plan Project contractor selection plan: Procurement of hall assets (hall LED screen, fonts, flags, slogans, Uncle Ho statue podium, speech podium) with 1 bidding package .
21/12/2025 07:22
The Bid solicitor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN has posted the results of the bidding package Package No. 01: The whole construction part of the investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN.
- Winning bidder: CÔNG TY TNHH XĂNG DẦU AN GIA
28/12/2024 15:45
The Bid solicitor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN has posted the request Project contractor selection plan: Repairing fences and gates of Hung Nguyen Forest Ranger Station of the investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN with 1 bidding package.
27/12/2024 22:28
Investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN has posted an investment and development project Repair of Hung Nguyen ranger station: Repair fence and gate of Hung Nguyen ranger station.
25/12/2024 21:21
The Bid solicitor Công ty TNHH Tư vấn Xây dựng HHT Nghệ An has posted the results of the bidding package Bid package number XD-01: Construction costs of the investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN.
- Winning bidder: Song Giang consultative and incorporated stock company
28/11/2024 19:57
Bid solicitor Công ty TNHH Tư vấn Xây dựng HHT Nghệ An has posted Tender Notice Bid package number XD-01: Construction costs of the investor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN with the form Competitive Offer.
15/11/2024 15:41
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN has posted 4 of the contractor selection plan, which contains 5 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity HẠT KIỂM LÂM NAM ĐÀN - HƯNG NGUYÊN has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects