Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Khu Quản lý đường bộ I as follows:
- Has relationships with 1 project owners.
- Has relationships with 168 contractor.
- Announced 325 investment development project, of which 73 projects have not yet announced the prequalification documents.
- Announced 376 contractor selection plans with a total of 844 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 127 packages (with 158 tender notices), and conducted prequalification for 0 packages.
- There are 4 bidding packages with content that needs clarification.
- Announced the results of 172 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 62 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 495 packages that have not fully posted the contractor selection results. Of these 491 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.51 contractors.
- Breakdown by bidding field: Goods 0.63%, Construction 43.67%, Consultancy 36.71%, Non-consultancy 18.99%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 826,764,623,556 VND, of which the total winning bid value is: 796,490,366,315 VND.
- The savings rate is: 3.66%.
Data analysis results of DauThau.info software for bid solicitors Khu Quản lý đường bộ I as follows:
- Has relationships with 168 contractor.
- The average number of contractors participating in each bidding package is: 1.51 contractors.
- Proportion of bidding fields: Goods 0.63%, Construction 43.67%, Consulting 36.71%, Non-consulting 18.99%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 826,764,623,556 VND, in which the total winning value is: 796,490,366,315 VND.
- The savings rate is: 3.66%.
This Bid solicitor is also an investor. The analysis results of data for the investor Khu Quản lý đường bộ I are as follows:
- Is the investor of 325 development investment projects.
- Is the investor of 784 contractor selection plans, of which 292 were self-published, and 492 were published by other entities.
- Is the investor of 867 Tender Notices, of which 147 were self-invited, and 720 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 03: Construction in the form Open bidding .
06/01/2026 18:55
Khu Quản lý đường bộ I announced the results of the bid package Construction .
- Winning bidder: 898 CONSTRUCTION JOINT STOCK COMPANY
06/01/2026 16:56
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 3: Construction in the form Open bidding .
31/12/2025 17:40
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 3: Construction in the form Open bidding .
31/12/2025 15:37
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 03:
Construction
erect in the form Open bidding .
31/12/2025 11:26
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 5: Construction in the form Open bidding .
31/12/2025 08:03
Khu Quản lý đường bộ I publishes Tender Notice Construction in the form Open bidding .
30/12/2025 17:49
Khu Quản lý đường bộ I publishes the plan Supplementing the project contractor selection plan: Repairing damage to the foundation, road surface and traffic safety system section: Km236+661 - Km239+000; Km258+950 - Km259+200, Km260+400 - Km261+500; Km264+000 - Km269+000; Repairing the longitudinal trench system, reinforcing the shoulder, adding and raising the corrugated iron guardrail, completing the traffic safety system at section Km217+700 - Km270+000 National Highway 3 (coincident with Ho Chi Minh Highway) with 4 bidding package .
29/12/2025 18:12
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 03: Construction in the form Open bidding .
27/12/2025 15:43
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 03: Construction in the form Open bidding .
26/12/2025 17:49
The data sheet has been partially hidden, to see the full information please Login or Register
Khu Quản lý đường bộ I publishes the plan Handling the risk of traffic safety at km0+900 - km1+250 QL.15, Hoa Binh province with 3 bidding package .
29/11/2025 10:38
Khu Quản lý đường bộ I announced the results of the bid package Construction supervision .
- Winning bidder: Trung tâm Kỹ thuật đường bộ 1
29/11/2025 10:32
Khu Quản lý đường bộ I announced the results of the bid package Audit .
- Winning bidder: CENTRAL AUDITING AND VALUATION COMPANY LIMITED
25/11/2025 10:37
Khu Quản lý đường bộ I publishes the plan Complete repair of traffic safety system, section Km438-Km503, Ho Chi Minh Road, Hoa Binh province with 3 bidding package .
25/11/2025 10:34
Khu Quản lý đường bộ I announced the results of the bid package Package number 03: Project audit .
- Winning bidder: VFA AUDITING COMPANY LIMITED
25/11/2025 10:29
Khu Quản lý đường bộ I publishes the plan Repairing local road surface damage at sections Km262+020-Km262+236(T), Km262+457-Km262+700, Km259+805-Km259+909(P), Km261+140-Km261+430(P), Km262+020-Km262+236(P), Highway 1, Ninh Binh province. with 3 bidding package .
25/11/2025 10:15
Khu Quản lý đường bộ I announced the results of the bid package Package number 03: Project audit .
- Winning bidder: VFA AUDITING COMPANY LIMITED
24/11/2025 17:40
Khu Quản lý đường bộ I publishes the plan Repairing local road surface damage at sections Km251+420-Km251+789(PT), Km251+924.5-Km252+186(PT), Km252+643.4-Km253+00(PT), Km253+388-Km253+415(PT), Km253+681.8-Km253+704(PT), Km253+724-Km253+812.4(PT), Km254+339-Km254+419(PT), Km251+100-Km251+151(TT), Km251+439-Km251+910.3(TT), Km252+35.6-Km252+111(TT), Km252+247.5-Km252+475.3(TT), Km252+581-Km252+597(TT), Km252+690-Km252+725.4(TT), Km252+924.2-Km253+057.2(TT), Km253+284-Km253+470.4(TT), Km253+482.4-Km253+626.4(TT), Km253+632.4-Km253+667.9(TT), Km253+762-Km254+285.2(TT), Km254+340-Km254+380(TT), Km254+419-Km254+626.7(TT), Km254+661.7-Km254+903(TT), National Highway 1, Ninh Binh province with 3 bidding package .
24/11/2025 17:36
Khu Quản lý đường bộ I announced the results of the bid package Package number 03: Project audit .
- Winning bidder: CENTRAL AUDITING AND VALUATION COMPANY LIMITED
24/11/2025 17:32
Khu Quản lý đường bộ I publishes the plan Repair of Xuan Him bridge Km456+104, Bong Bac II bridge Km475+170, Song Be bridge Km498+111, Ho Chi Minh road, Hoa Binh province with 3 bidding package .
24/11/2025 17:28
The data sheet has been partially hidden, to see the full information please Login or Register
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 03: Construction in the form Open bidding .
06/01/2026 18:55
Khu Quản lý đường bộ I announced the results of the bid package Construction .
- Winning bidder: 898 CONSTRUCTION JOINT STOCK COMPANY
06/01/2026 16:56
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 3: Construction in the form Open bidding .
31/12/2025 17:40
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 3: Construction in the form Open bidding .
31/12/2025 15:37
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 03:
Construction
erect in the form Open bidding .
31/12/2025 11:26
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 5: Construction in the form Open bidding .
31/12/2025 08:03
Khu Quản lý đường bộ I publishes Tender Notice Construction in the form Open bidding .
30/12/2025 17:49
Khu Quản lý đường bộ I publishes the plan Supplementing the project contractor selection plan: Repairing damage to the foundation, road surface and traffic safety system section: Km236+661 - Km239+000; Km258+950 - Km259+200, Km260+400 - Km261+500; Km264+000 - Km269+000; Repairing the longitudinal trench system, reinforcing the shoulder, adding and raising the corrugated iron guardrail, completing the traffic safety system at section Km217+700 - Km270+000 National Highway 3 (coincident with Ho Chi Minh Highway) with 4 bidding package .
29/12/2025 18:12
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 03: Construction in the form Open bidding .
27/12/2025 15:43
Khu Quản lý đường bộ I publishes Tender Notice Tender package No 03: Construction in the form Open bidding .
26/12/2025 17:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Khu Quản lý đường bộ I has posted 376 of the contractor selection plan, which contains 844 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Khu Quản lý đường bộ I has posted 158 Tender Notices in 127 bidding packages. Among these, 138 Tender Notices were self-invited, and 20 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Khu Quản lý đường bộ I has posted 172 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 172 package, canceled the bid 0 package (among the bidding packages above).
- There are 62 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Khu Quản lý đường bộ I has a relationship with 168 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Khu Quản lý đường bộ I has a relationship with 26 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Khu Quản lý đường bộ I has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects