Data analysis results of DauThau.info software for bid solicitors Lữ đoàn 273/Quân khu 3 as follows:
- Has relationships with 2 project owners.
- Has relationships with 6 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 6 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 6 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 33.33%, Construction 33.33%, Consultancy 33.33%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 32,004,044,000 VND, of which the total winning bid value is: 31,929,669,000 VND.
- The savings rate is: 0.23%.
Data analysis results of DauThau.info software for bid solicitors Lữ đoàn 273/Quân khu 3 as follows:
- Has relationships with 6 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 33.33%, Construction 33.33%, Consulting 33.33%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 32,004,044,000 VND, in which the total winning value is: 31,929,669,000 VND.
- The savings rate is: 0.23%.
This Bid solicitor is also an investor. The analysis results of data for the investor Lữ đoàn 273/Quân khu 3 are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 2 contractor selection plans, of which 2 were self-published, and 0 were published by other entities.
- Is the investor of 1 Tender Notices, of which 1 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 3 bidding packages, of which 3 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 92.33% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.56% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Undefined (3)
- Provinces before the merger where the contractor has participated in bidding : Undefined (3)
- Has relationships with 3 Bid Solicitors
- Has relationships with 2 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Package 01: Construction (Dredging) of the investor Lữ đoàn 273/Quân khu 3.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI XÂY DỰNG SƠN TRÀ
12/05/2020 15:05
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the request Dredging Dong Hai Military Port 2 / 273rd Brigade of the investor Lữ đoàn 273/Quân khu 3 with 1 bidding package.
31/03/2020 08:33
Investor Lữ đoàn 273/Quân khu 3 has posted an investment and development project Dredging Dong Hai Military Port 2/27th Brigade.
31/03/2020 07:00
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Equipment supply: foundation construction and 100 ton electronic weighing station operator of the investor Lữ đoàn 273/Quân khu 3.
05/11/2018 15:31
Bid solicitor Lữ đoàn 273/Quân khu 3 has posted Tender Notice Equipment supply: foundation construction and 100 ton electronic weighing station operator of the investor Lữ đoàn 273/Quân khu 3 with the form National Competitive Bidding.
25/09/2018 15:45
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the request Weighing station 100T of the investor Lữ đoàn 273/Quân khu 3 with 1 bidding package.
14/09/2018 09:58
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Commander's house, cafeteria + technical infrastructure of the investor Lữ đoàn 273/Quân khu 3.
09/08/2018 14:47
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Package 05: Construction supervision + equipment (Posted on bidding newspaper No. 14 on January 19, 2018) of the investor Lữ đoàn 273/Quân khu 3.
19/01/2018 08:02
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Package No. 10 Leveling + Rock embankment (Posted on bidding newspaper No. 02 on 03/01/2018) of the investor Lữ đoàn 273/Quân khu 3.
03/01/2018 08:06
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Package 02: Design of BVTC-TDT (Posted on bidding newspaper No. 205 on October 30, 2017) of the investor Lữ đoàn 273/Quân khu 3.
- Winning bidder: Công ty CP dịch vụ tư vấn và đầu tư xây dựng đô thị Việt Nam
30/10/2017 06:49
The data sheet has been partially hidden, to see the full information please Login or Register
Lữ đoàn 273/Quân khu 3 announced the results of the bidding package Package 02: Procurement of 50 ton crawler crane (used) with 1 participating contractors .
09/11/2021 18:04
Lữ đoàn 273/Quân khu 3 publishes Tender Notice Package 02: Procurement of 50 ton crawler crane (used) in the form National Competitive Bidding .
02/11/2021 17:27
Lữ đoàn 273/Quân khu 3 announced the results of the bid package Package 01: Construction (Dredging) .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI XÂY DỰNG SƠN TRÀ
12/05/2020 15:05
Lữ đoàn 273/Quân khu 3 publishes the plan Dredging Dong Hai Military Port 2/Brigade 273/BTL Military Region 3 in 2020 with 1 bidding package .
18/04/2020 10:03
Lữ đoàn 273/Quân khu 3 publishes the plan Dredging Dong Hai Military Port 2/Brigade 273/BTL Military Region 3 in 2020 with 1 bidding package .
18/04/2020 09:50
Lữ đoàn 273/Quân khu 3 publishes the plan Dredging Dong Hai Military Port 2/Brigade 273/BTL Military Region 3 in 2020 with 1 bidding package .
17/04/2020 22:23
Lữ đoàn 273/Quân khu 3 publishes the plan Dredging Dong Hai Military Port 2 / 273rd Brigade with 1 bidding package .
31/03/2020 08:33
Lữ đoàn 273/Quân khu 3 announced the results of the bid package Equipment supply: foundation construction and 100 ton electronic weighing station operator .
- Winning bidder: Công ty TNHH Xây Dựng Ngân Việt
05/11/2018 15:31
Lữ đoàn 273/Quân khu 3 publishes Tender Notice Equipment supply: foundation construction and 100 ton electronic weighing station operator in the form National Competitive Bidding .
25/09/2018 15:45
Lữ đoàn 273/Quân khu 3 publishes the plan Weighing station 100T with 1 bidding package .
14/09/2018 09:58
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Package 01: Construction (Dredging) of the investor Lữ đoàn 273/Quân khu 3.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI XÂY DỰNG SƠN TRÀ
12/05/2020 15:05
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the request Dredging Dong Hai Military Port 2 / 273rd Brigade of the investor Lữ đoàn 273/Quân khu 3 with 1 bidding package.
31/03/2020 08:33
Investor Lữ đoàn 273/Quân khu 3 has posted an investment and development project Dredging Dong Hai Military Port 2/27th Brigade.
31/03/2020 07:00
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Equipment supply: foundation construction and 100 ton electronic weighing station operator of the investor Lữ đoàn 273/Quân khu 3.
05/11/2018 15:31
Bid solicitor Lữ đoàn 273/Quân khu 3 has posted Tender Notice Equipment supply: foundation construction and 100 ton electronic weighing station operator of the investor Lữ đoàn 273/Quân khu 3 with the form National Competitive Bidding.
25/09/2018 15:45
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the request Weighing station 100T of the investor Lữ đoàn 273/Quân khu 3 with 1 bidding package.
14/09/2018 09:58
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Commander's house, cafeteria + technical infrastructure of the investor Lữ đoàn 273/Quân khu 3.
09/08/2018 14:47
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Package 05: Construction supervision + equipment (Posted on bidding newspaper No. 14 on January 19, 2018) of the investor Lữ đoàn 273/Quân khu 3.
19/01/2018 08:02
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Package No. 10 Leveling + Rock embankment (Posted on bidding newspaper No. 02 on 03/01/2018) of the investor Lữ đoàn 273/Quân khu 3.
03/01/2018 08:06
The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted the results of the bidding package Package 02: Design of BVTC-TDT (Posted on bidding newspaper No. 205 on October 30, 2017) of the investor Lữ đoàn 273/Quân khu 3.
- Winning bidder: Công ty CP dịch vụ tư vấn và đầu tư xây dựng đô thị Việt Nam
30/10/2017 06:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Lữ đoàn 273/Quân khu 3 has posted 7 of the contractor selection plan, which contains 6 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted 6 Tender Notices in 6 bidding packages. Among these, 1 Tender Notices were self-invited, and 5 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Lữ đoàn 273/Quân khu 3 has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Lữ đoàn 273/Quân khu 3 has a relationship with 6 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Lữ đoàn 273/Quân khu 3 has a relationship with 2 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Lữ đoàn 273/Quân khu 3 has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects