Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Lữ đoàn 299/Quân đoàn 12 as follows:
- Has relationships with 1 project owners.
- Has relationships with 22 contractor.
- Announced 6 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 21 contractor selection plans with a total of 50 bidding packages, of which 19 prequalification documents have not found the investment project.
- Has invited bids for 11 packages (with 11 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 12 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 38 packages that have not fully posted the contractor selection results. Of these 37 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.33 contractors.
- Breakdown by bidding field: Goods 27.27%, Construction 54.55%, Consultancy 18.18%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 54,695,669,000 VND, of which the total winning bid value is: 54,376,213,000 VND.
- The savings rate is: 0.58%.
Data analysis results of DauThau.info software for bid solicitors Lữ đoàn 299/Quân đoàn 12 as follows:
- Has relationships with 22 contractor.
- The average number of contractors participating in each bidding package is: 2.33 contractors.
- Proportion of bidding fields: Goods 27.27%, Construction 54.55%, Consulting 18.18%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 54,695,669,000 VND, in which the total winning value is: 54,376,213,000 VND.
- The savings rate is: 0.58%.
This Bid solicitor is also an investor. The analysis results of data for the investor Lữ đoàn 299/Quân đoàn 12 are as follows:
- Is the investor of 6 development investment projects.
- Is the investor of 23 contractor selection plans, of which 19 were self-published, and 4 were published by other entities.
- Is the investor of 11 Tender Notices, of which 11 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Lữ đoàn 299/Quân đoàn 12 announced the results of the bid package Purchasing supplies and equipment for collective welfare .
- Winning bidder: PHẠM TRỌNG NGHĨA
26/11/2025 09:49
Lữ đoàn 299/Quân đoàn 12 publishes the plan Purchasing supplies and equipment for collective welfare with 1 bidding package .
21/11/2025 10:10
Lữ đoàn 299/Quân đoàn 12 announced the results of the bid package Procurement of physical training materials and equipment .
- Winning bidder: PHẠM TRỌNG NGHĨA
16/11/2025 09:43
Lữ đoàn 299/Quân đoàn 12 announced the results of the bid package Package No. 01: Procurement of materials for the Engineering Sports Festival .
- Winning bidder: Cửa hàng kinh doanh tổng hợp Bảo Long
15/11/2025 17:53
Lữ đoàn 299/Quân đoàn 12 publishes the plan Procurement of physical training materials and equipment with 1 bidding package .
09/11/2025 16:25
Lữ đoàn 299/Quân đoàn 12 publishes the plan Procurement of materials for the Engineering Sports Festival with 1 bidding package .
09/11/2025 16:15
Lữ đoàn 299/Quân đoàn 12 publishes the plan Procurement of materials for the Engineering Sports Festival with 1 bidding package .
09/11/2025 16:10
The Bid solicitor Lữ đoàn 299/Quân đoàn 12 has posted the results of the bidding package Package No. 04: Warehouse construction of the investor Lữ đoàn 299/Quân đoàn 12.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI NAM HOÀNG ANH
06/01/2025 18:18
Bid solicitor Lữ đoàn 299/Quân đoàn 12 has posted Tender Notice Tender package No 04: Warehouse construction of the investor Lữ đoàn 299/Quân đoàn 12 with the form Open bidding.
20/12/2024 18:23
The Bid solicitor Lữ đoàn 299/Quân đoàn 12 has posted the request Construction of a warehouse for materials and weapons and explosives for Engineer Brigade 299/Army Corps 12 of the investor Lữ đoàn 299/Quân đoàn 12 with 3 bidding package.
03/12/2024 17:00
The data sheet has been partially hidden, to see the full information please Login or Register
Lữ đoàn 299/Quân đoàn 12 announced the results of the bid package Package No. 04: Warehouse construction .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI NAM HOÀNG ANH
06/01/2025 18:18
Lữ đoàn 299/Quân đoàn 12 announced the results of the bidding package Tender package No 04: Warehouse construction with 1 participating contractors .
30/12/2024 07:32
Lữ đoàn 299/Quân đoàn 12 publishes Tender Notice Tender package No 04: Warehouse construction in the form Open bidding .
20/12/2024 18:23
Lữ đoàn 299/Quân đoàn 12 publishes the plan Construction of a warehouse for materials and weapons and explosives for Engineer Brigade 299/Army Corps 12 with 3 bidding package .
03/12/2024 17:00
Lữ đoàn 299/Quân đoàn 12 announced the results of the bid package Package 06: Construction supervision consultancy .
- Winning bidder: HANCO CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
09/09/2023 17:47
Lữ đoàn 299/Quân đoàn 12 announced the results of the bid package Package No. 09: Construction .
- Winning bidder: DAI KIM CONSTRUCTION COMPANY LIMITED
09/09/2023 17:43
Lữ đoàn 299/Quân đoàn 12 announced the results of the bidding package Tender package No 09: Construction with 1 participating contractors .
21/08/2023 08:48
Lữ đoàn 299/Quân đoàn 12 announced the results of the bidding package Package 06: Construction supervision consultancy with 1 participating contractors .
21/08/2023 08:40
Lữ đoàn 299/Quân đoàn 12 publishes Tender Notice Package 06: Construction supervision consultancy in the form Open bidding .
10/08/2023 14:05
Lữ đoàn 299/Quân đoàn 12 publishes the plan Contractor selection plan (phase 2)
Project: Construction of the 1st Battalion barracks / Engineers Brigade 299 with 7 bidding package .
10/08/2023 10:47
The data sheet has been partially hidden, to see the full information please Login or Register
Lữ đoàn 299/Quân đoàn 12 announced the results of the bid package Purchasing supplies and equipment for collective welfare .
- Winning bidder: PHẠM TRỌNG NGHĨA
26/11/2025 09:49
Lữ đoàn 299/Quân đoàn 12 publishes the plan Purchasing supplies and equipment for collective welfare with 1 bidding package .
21/11/2025 10:10
Lữ đoàn 299/Quân đoàn 12 announced the results of the bid package Procurement of physical training materials and equipment .
- Winning bidder: PHẠM TRỌNG NGHĨA
16/11/2025 09:43
Lữ đoàn 299/Quân đoàn 12 announced the results of the bid package Package No. 01: Procurement of materials for the Engineering Sports Festival .
- Winning bidder: Cửa hàng kinh doanh tổng hợp Bảo Long
15/11/2025 17:53
Lữ đoàn 299/Quân đoàn 12 publishes the plan Procurement of physical training materials and equipment with 1 bidding package .
09/11/2025 16:25
Lữ đoàn 299/Quân đoàn 12 publishes the plan Procurement of materials for the Engineering Sports Festival with 1 bidding package .
09/11/2025 16:15
Lữ đoàn 299/Quân đoàn 12 publishes the plan Procurement of materials for the Engineering Sports Festival with 1 bidding package .
09/11/2025 16:10
The Bid solicitor Lữ đoàn 299/Quân đoàn 12 has posted the results of the bidding package Package No. 04: Warehouse construction of the investor Lữ đoàn 299/Quân đoàn 12.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI NAM HOÀNG ANH
06/01/2025 18:18
Bid solicitor Lữ đoàn 299/Quân đoàn 12 has posted Tender Notice Tender package No 04: Warehouse construction of the investor Lữ đoàn 299/Quân đoàn 12 with the form Open bidding.
20/12/2024 18:23
The Bid solicitor Lữ đoàn 299/Quân đoàn 12 has posted the request Construction of a warehouse for materials and weapons and explosives for Engineer Brigade 299/Army Corps 12 of the investor Lữ đoàn 299/Quân đoàn 12 with 3 bidding package.
03/12/2024 17:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Lữ đoàn 299/Quân đoàn 12 has posted 21 of the contractor selection plan, which contains 50 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Lữ đoàn 299/Quân đoàn 12 has posted 11 Tender Notices in 11 bidding packages. Among these, 11 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Lữ đoàn 299/Quân đoàn 12 has posted 12 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 12 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Lữ đoàn 299/Quân đoàn 12 has a relationship with 22 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Lữ đoàn 299/Quân đoàn 12 has a relationship with 9 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Lữ đoàn 299/Quân đoàn 12 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects