Data analysis results of DauThau.info software for bid solicitors Lữ đoàn 80/Quân khu 4 as follows:
- Has relationships with 1 project owners.
- Has relationships with 13 contractor.
- Announced 12 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 13 contractor selection plans with a total of 43 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 8 packages (with 8 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 15 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 7 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 27 packages that have not fully posted the contractor selection results. Of these 27 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.40 contractors.
- Breakdown by bidding field: Goods 25.00%, Construction 50.00%, Consultancy 25.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 29,186,938,995 VND, of which the total winning bid value is: 28,041,851,192 VND.
- The savings rate is: 3.92%.
Data analysis results of DauThau.info software for bid solicitors Lữ đoàn 80/Quân khu 4 as follows:
- Has relationships with 13 contractor.
- The average number of contractors participating in each bidding package is: 1.40 contractors.
- Proportion of bidding fields: Goods 25.00%, Construction 50.00%, Consulting 25.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 29,186,938,995 VND, in which the total winning value is: 28,041,851,192 VND.
- The savings rate is: 3.92%.
This Bid solicitor is also an investor. The analysis results of data for the investor Lữ đoàn 80/Quân khu 4 are as follows:
- Is the investor of 12 development investment projects.
- Is the investor of 14 contractor selection plans, of which 13 were self-published, and 1 were published by other entities.
- Is the investor of 15 Tender Notices, of which 8 were self-invited, and 7 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Package MS-02: Fire protection equipment of the investor Lữ đoàn 80/Quân khu 4.
- Winning bidder: VIETNAM HANAGASHI FIRE PREVENTION AND FIGHTING COMPANY LIMITED
09/08/2024 17:08
Bid solicitor Lữ đoàn 80/Quân khu 4 has posted Tender Notice Package MS-02: Fire fighting equipment of the investor Lữ đoàn 80/Quân khu 4 with the form Open bidding.
20/06/2024 16:58
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Package XD-01: Construction work of the investor Lữ đoàn 80/Quân khu 4.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG TỔNG HỢP 168
20/06/2024 16:03
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Bidding package MS-01: Business tools and equipment; kerosene stove of the investor Lữ đoàn 80/Quân khu 4.
- Winning bidder: CÔNG TY TNHH SX - TM GIA KHANG
23/05/2024 14:15
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the request Project: Concentrated pig farming barn of Information Brigade 80/Military Region 4 of the investor Lữ đoàn 80/Quân khu 4 with 2 bidding package.
06/05/2024 23:27
Investor Lữ đoàn 80/Quân khu 4 has posted an investment and development project Concentrated pig farming barn of Information Brigade 80/Military Region 4.
06/05/2024 23:23
Bid solicitor Lữ đoàn 80/Quân khu 4 has posted Tender Notice Package MS-01: Tools and equipment; kerosene stove of the investor Lữ đoàn 80/Quân khu 4 with the form Open bidding.
17/04/2024 12:21
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Package TV-10: Supervision of construction and equipment installation of housing items for officers and soldiers; dining room, kitchen; Technical infrastructure (except fire protection system; termite prevention) of the investor Lữ đoàn 80/Quân khu 4.
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ DỊCH VỤ TECHNIC
25/03/2024 16:56
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Package XD-03: Construction of housing items for officers and soldiers; dining room, kitchen; Technical infrastructure (except fire protection system; termite prevention) of the investor Lữ đoàn 80/Quân khu 4.
- Winning bidder: TECHNOLOGY OF WELDING AND AUTOMATIC JOINT STOCK COMPANY
19/03/2024 16:03
Bid solicitor Lữ đoàn 80/Quân khu 4 has posted Tender Notice Package TV-10: Supervision of construction and equipment installation of construction items Housing for officers and soldiers; canteen, kitchen; technical infrastructure (except fire protection system; anti-termite) of the investor Lữ đoàn 80/Quân khu 4 with the form Open bidding.
21/02/2024 14:54
The data sheet has been partially hidden, to see the full information please Login or Register
Lữ đoàn 80/Quân khu 4 announced the results of the bid package Package MS-02: Fire protection equipment .
- Winning bidder: VIETNAM HANAGASHI FIRE PREVENTION AND FIGHTING COMPANY LIMITED
09/08/2024 17:08
Lữ đoàn 80/Quân khu 4 announced the results of the bidding package Package MS-02: Fire fighting equipment with 1 participating contractors .
29/06/2024 17:10
Lữ đoàn 80/Quân khu 4 publishes Tender Notice Package MS-02: Fire fighting equipment in the form Open bidding .
20/06/2024 16:58
Lữ đoàn 80/Quân khu 4 announced the results of the bid package Package XD-01: Construction work .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG TỔNG HỢP 168
20/06/2024 16:03
Lữ đoàn 80/Quân khu 4 announced the results of the bid package Bidding package MS-01: Business tools and equipment; kerosene stove .
- Winning bidder: CÔNG TY TNHH SX - TM GIA KHANG
23/05/2024 14:15
Lữ đoàn 80/Quân khu 4 publishes the plan Project: Concentrated pig farming barn of Information Brigade 80/Military Region 4 with 2 bidding package .
06/05/2024 23:27
Lữ đoàn 80/Quân khu 4 announced the results of the bidding package Package MS-01: Tools and equipment; kerosene stove with 3 participating contractors .
26/04/2024 14:15
Lữ đoàn 80/Quân khu 4 publishes Tender Notice Package MS-01: Tools and equipment; kerosene stove in the form Open bidding .
17/04/2024 12:21
Lữ đoàn 80/Quân khu 4 announced the results of the bid package Package TV-10: Supervision of construction and equipment installation of housing items for officers and soldiers; dining room, kitchen; Technical infrastructure (except fire protection system; termite prevention) .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ DỊCH VỤ TECHNIC
25/03/2024 16:56
Lữ đoàn 80/Quân khu 4 announced the results of the bid package Package XD-03: Construction of housing items for officers and soldiers; dining room, kitchen; Technical infrastructure (except fire protection system; termite prevention) .
- Winning bidder: TECHNOLOGY OF WELDING AND AUTOMATIC JOINT STOCK COMPANY
19/03/2024 16:03
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Package MS-02: Fire protection equipment of the investor Lữ đoàn 80/Quân khu 4.
- Winning bidder: VIETNAM HANAGASHI FIRE PREVENTION AND FIGHTING COMPANY LIMITED
09/08/2024 17:08
Bid solicitor Lữ đoàn 80/Quân khu 4 has posted Tender Notice Package MS-02: Fire fighting equipment of the investor Lữ đoàn 80/Quân khu 4 with the form Open bidding.
20/06/2024 16:58
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Package XD-01: Construction work of the investor Lữ đoàn 80/Quân khu 4.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG TỔNG HỢP 168
20/06/2024 16:03
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Bidding package MS-01: Business tools and equipment; kerosene stove of the investor Lữ đoàn 80/Quân khu 4.
- Winning bidder: CÔNG TY TNHH SX - TM GIA KHANG
23/05/2024 14:15
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the request Project: Concentrated pig farming barn of Information Brigade 80/Military Region 4 of the investor Lữ đoàn 80/Quân khu 4 with 2 bidding package.
06/05/2024 23:27
Investor Lữ đoàn 80/Quân khu 4 has posted an investment and development project Concentrated pig farming barn of Information Brigade 80/Military Region 4.
06/05/2024 23:23
Bid solicitor Lữ đoàn 80/Quân khu 4 has posted Tender Notice Package MS-01: Tools and equipment; kerosene stove of the investor Lữ đoàn 80/Quân khu 4 with the form Open bidding.
17/04/2024 12:21
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Package TV-10: Supervision of construction and equipment installation of housing items for officers and soldiers; dining room, kitchen; Technical infrastructure (except fire protection system; termite prevention) of the investor Lữ đoàn 80/Quân khu 4.
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ DỊCH VỤ TECHNIC
25/03/2024 16:56
The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted the results of the bidding package Package XD-03: Construction of housing items for officers and soldiers; dining room, kitchen; Technical infrastructure (except fire protection system; termite prevention) of the investor Lữ đoàn 80/Quân khu 4.
- Winning bidder: TECHNOLOGY OF WELDING AND AUTOMATIC JOINT STOCK COMPANY
19/03/2024 16:03
Bid solicitor Lữ đoàn 80/Quân khu 4 has posted Tender Notice Package TV-10: Supervision of construction and equipment installation of construction items Housing for officers and soldiers; canteen, kitchen; technical infrastructure (except fire protection system; anti-termite) of the investor Lữ đoàn 80/Quân khu 4 with the form Open bidding.
21/02/2024 14:54
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Lữ đoàn 80/Quân khu 4 has posted 13 of the contractor selection plan, which contains 43 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted 8 Tender Notices in 8 bidding packages. Among these, 8 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Lữ đoàn 80/Quân khu 4 has posted 15 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 15 package, canceled the bid 0 package (among the bidding packages above).
- There are 7 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Lữ đoàn 80/Quân khu 4 has a relationship with 13 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Lữ đoàn 80/Quân khu 4 has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Lữ đoàn 80/Quân khu 4 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects