Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Management Board for Forestry Projects as follows:
- Has relationships with 1 project owners.
- Has relationships with 28 contractor.
- Announced 10 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 20 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 1 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 19 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 18 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 19 packages that have not fully posted the contractor selection results. Of these 18 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 6.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,994,728,800 VND, of which the total winning bid value is: 3,912,699,800 VND.
- The savings rate is: 2.05%.
Data analysis results of DauThau.info software for bid solicitors Management Board for Forestry Projects as follows:
- Has relationships with 28 contractor.
- The average number of contractors participating in each bidding package is: 6.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,994,728,800 VND, in which the total winning value is: 3,912,699,800 VND.
- The savings rate is: 2.05%.
This Bid solicitor is also an investor. The analysis results of data for the investor Management Board for Forestry Projects are as follows:
- Is the investor of 10 development investment projects.
- Is the investor of 20 contractor selection plans, of which 3 were self-published, and 17 were published by other entities.
- Is the investor of 11 Tender Notices, of which 0 were self-invited, and 11 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Management Board for Forestry Projects publishes Tender Notice Building a model to improve the quality and value of the brand of mangroves honey in the form Competitive Offer .
17/12/2025 14:29
Management Board for Forestry Projects publishes the plan Adjust the contractor selection plan (phase 1) with 7 bidding package .
10/12/2025 15:11
Management Board for Forestry Projects publishes the plan Contractor selection plan (phase 2) with 2 bidding package .
10/12/2025 13:48
Management Board for Forestry Projects publishes the plan Approve the adjustment of the Contractor Selection Plan for the project "Restoration and sustainable management of mangrove forests in the Red River Delta" funded by the Korean Government as non-refundable aid. with 9 bidding package .
09/12/2025 17:36
Management Board for Forestry Projects announced the results of the bid package Surveying, designing, estimating the establishment of 4.5 km wave fence in Nghia Lam commune, Ninh Binh province .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG AN HOÀNG LONG
26/11/2025 11:28
Management Board for Forestry Projects announced the results of the bid package Supporting the exchange and granting of land use certificates for the first time handing over the field boundary and protecting forests in Kim Dong commune, and Binh Minh commune, Ninh Binh province (1,003 ha) .
- Winning bidder: Institute for Forest Ecology and Environment
26/11/2025 10:24
Management Board for Forestry Projects publishes Tender Notice Consulting to review the potential area to protect forests, restore forests and plant afforestation in the form Open bidding .
24/11/2025 15:25
Management Board for Forestry Projects publishes the plan Adjust the contractor selection plan (phase 1) with 5 bidding package .
08/10/2025 11:15
Management Board for Forestry Projects publishes the plan Approving adjustment and supplementation of planning plan for project contractor recovery and sustainable management of mangroves in the Red River Delta with 9 bidding package .
29/08/2025 18:14
Investor Management Board for Forestry Projects has posted an investment and development project Restoration and sustainable management of mangrove forests in the Red River Delta (KFS Project).
29/08/2025 17:17
The data sheet has been partially hidden, to see the full information please Login or Register
Management Board for Forestry Projects announced the results of the bid package Consulting on evaluation of steps in the process of organizing contractor selection .
- Winning bidder: MT SCIENCE TECHNOLOGY DEVELOPMENT INVESTMENT JOINT STOCK COMPANY
18/08/2025 12:00
Management Board for Forestry Projects publishes the plan Contractor selection plan (phase 1) with 7 bidding package .
25/06/2025 15:45
Management Board for Forestry Projects publishes the plan Approving the plan for selecting contractors from the state budget (reciprocal capital) for the expenses of the office apparatus Forestry Project Management Board with 3 bidding package .
02/08/2023 16:10
Management Board for Forestry Projects announced the results of the bid package Consultancy on construction of feasibility study report (FS) package number HQ-TV01 .
- Winning bidder: Viện Sinh thái và Bảo vệ công trình
22/12/2021 10:41
Management Board for Forestry Projects announced the results of the bid package Car repair .
- Winning bidder: Gara sửa chữa ôtô Thái Dương
06/01/2020 17:21
Management Board for Forestry Projects announced the results of the bid package Office repair .
- Winning bidder: Công ty cổ phần phát triển xây dựng và thương mại Thành Long
31/12/2019 17:49
Management Board for Forestry Projects publishes Tender Notice Auditing Financial Statements (phase 2) in the form National competitive bidding .
18/07/2019 16:08
Management Board for Forestry Projects announced the results of the bid package Replace air conditioners for professional rooms .
- Winning bidder: Công ty cổ phần xây dựng thương mại Linh Nam
09/07/2019 18:50
Management Board for Forestry Projects announced the results of the bid package Motor vehicle insurance .
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
13/12/2018 11:21
The data sheet has been partially hidden, to see the full information please Login or Register
Management Board for Forestry Projects publishes Tender Notice Building a model to improve the quality and value of the brand of mangroves honey in the form Competitive Offer .
17/12/2025 14:29
Management Board for Forestry Projects publishes the plan Adjust the contractor selection plan (phase 1) with 7 bidding package .
10/12/2025 15:11
Management Board for Forestry Projects publishes the plan Contractor selection plan (phase 2) with 2 bidding package .
10/12/2025 13:48
Management Board for Forestry Projects publishes the plan Approve the adjustment of the Contractor Selection Plan for the project "Restoration and sustainable management of mangrove forests in the Red River Delta" funded by the Korean Government as non-refundable aid. with 9 bidding package .
09/12/2025 17:36
Management Board for Forestry Projects announced the results of the bid package Surveying, designing, estimating the establishment of 4.5 km wave fence in Nghia Lam commune, Ninh Binh province .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG AN HOÀNG LONG
26/11/2025 11:28
Management Board for Forestry Projects announced the results of the bid package Supporting the exchange and granting of land use certificates for the first time handing over the field boundary and protecting forests in Kim Dong commune, and Binh Minh commune, Ninh Binh province (1,003 ha) .
- Winning bidder: Institute for Forest Ecology and Environment
26/11/2025 10:24
Management Board for Forestry Projects publishes Tender Notice Consulting to review the potential area to protect forests, restore forests and plant afforestation in the form Open bidding .
24/11/2025 15:25
Management Board for Forestry Projects publishes the plan Adjust the contractor selection plan (phase 1) with 5 bidding package .
08/10/2025 11:15
Management Board for Forestry Projects publishes the plan Approving adjustment and supplementation of planning plan for project contractor recovery and sustainable management of mangroves in the Red River Delta with 9 bidding package .
29/08/2025 18:14
Investor Management Board for Forestry Projects has posted an investment and development project Restoration and sustainable management of mangrove forests in the Red River Delta (KFS Project).
29/08/2025 17:17
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Management Board for Forestry Projects has posted 3 of the contractor selection plan, which contains 20 of the bidding package. See full list here
Summary: The Bid solicitor Management Board for Forestry Projects posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Management Board for Forestry Projects has posted 1 Tender Notices in 1 bidding packages. Among these, -5 Tender Notices were self-invited, and 6 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Management Board for Forestry Projects has posted 19 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 19 package, canceled the bid 0 package (among the bidding packages above).
- There are 18 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Management Board for Forestry Projects has a relationship with 28 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Management Board for Forestry Projects has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects