Data analysis results of DauThau.info software for bid solicitors National Power Transmission Corporation as follows:
- Has relationships with 103 contractor.
- Announced 663 investment development project, of which 52 projects have not yet announced the prequalification documents.
- Announced 319 contractor selection plans with a total of 1107 bidding packages, of which 97 prequalification documents have not found the investment project.
- Has invited bids for 78 packages (with 92 tender notices), and conducted prequalification for 2 packages.
- Announced the results of 44 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 11 packages with results that do not have tender notice or prequalification notice.
- There are 558 packages that have not fully posted the contractor selection results. Of these 426 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.37 contractors.
- Breakdown by bidding field: Goods 52.17%, Construction 7.61%, Consultancy 20.65%, Non-consultancy 19.57%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 121,173,748,068 VND, of which the total winning bid value is: 101,822,466,631 VND.
- The savings rate is: 15.97%.
Data analysis results of DauThau.info software for bid solicitors National Power Transmission Corporation as follows:
- Has relationships with 103 contractor.
- The average number of contractors participating in each bidding package is: 2.37 contractors.
- Proportion of bidding fields: Goods 52.17%, Construction 7.61%, Consulting 20.65%, Non-consulting 19.57%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 121,173,748,068 VND, in which the total winning value is: 101,822,466,631 VND.
- The savings rate is: 15.97%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 663 investment and development projects.
- As the owner of 2019 Contractor selection plan in which 319 Contractor selection plan is self-published, and 1700 Contractor selection plan is posted by other units.
- Being the investor of 2159 bidding packages in which 56 packages are self-invited, and 2103 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor National Power Transmission Corporation has posted the request KHLCNT adjusted the package of 28 projects of the investor National Power Transmission Corporation with 1 bidding package.
25/10/2024 16:24
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan - phase 2 of the Project: Installing the second transformer at Nam Cam 220kV substation of the investor National Power Transmission Corporation with 9 bidding package.
23/10/2024 16:32
The Bid solicitor National Power Transmission Corporation has posted the request Approve the contractor selection plan for phase 1 (Investment preparation phase) Project: Nam Dinh 2 220kV transformer station and connection line of the investor National Power Transmission Corporation with 2 bidding package.
22/10/2024 17:06
The Bid solicitor National Power Transmission Corporation has posted the request contractor selection plan phase 2 - Phase 2 - Project: 220 kV substation connected to levels in 500 kV Pho Noi substation of the investor National Power Transmission Corporation with 9 bidding package.
22/10/2024 14:07
The Bid solicitor National Power Transmission Corporation has posted the request Cost estimation: Deploying EVN's information system technical management software at the National Power Transmission Corporation and its affiliated units of the investor National Power Transmission Corporation with 1 bidding package.
17/10/2024 17:08
The Bid solicitor National Power Transmission Corporation has posted the request Adjustment of Technical Planning Phase 2 (Package 15, 16 for production preparation) - Project: 220kV Vung Ang transformer station and connection of the investor National Power Transmission Corporation with 1 bidding package.
17/10/2024 08:30
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 2 (project preparation phase) project: Hiep Hoa - Thai Nguyen 500 kV line of the investor National Power Transmission Corporation with 1 bidding package.
16/10/2024 14:36
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan - phase 2 of the Project: Installing the second transformer at Nam Cam 220kV substation of the investor National Power Transmission Corporation with 9 bidding package.
16/10/2024 09:27
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan - phase 2 of project: Installing the second transformer at Hai Ha 220kV transformer station of the investor National Power Transmission Corporation with 9 bidding package.
10/10/2024 11:22
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan (Phase 2) Project: Upgrading the 110 kV protection control system of the 220 kV Bac Giang substation of the investor National Power Transmission Corporation with 4 bidding package.
09/10/2024 15:35
The data sheet has been partially hidden, to see the full information please Login or Register
National Power Transmission Corporation publishes the plan KHLCNT adjusted the package of 28 projects with 1 bidding package .
25/10/2024 16:24
National Power Transmission Corporation publishes the plan Contractor selection plan - phase 2 of the Project: Installing the second transformer at Nam Cam 220kV substation with 9 bidding package .
23/10/2024 16:32
National Power Transmission Corporation publishes the plan Approve the contractor selection plan for phase 1 (Investment preparation phase) Project: Nam Dinh 2 220kV transformer station and connection line with 2 bidding package .
22/10/2024 17:06
National Power Transmission Corporation publishes the plan contractor selection plan phase 2 - Phase 2 - Project: 220 kV substation connected to levels in 500 kV Pho Noi substation with 9 bidding package .
22/10/2024 14:07
National Power Transmission Corporation publishes the plan Cost estimation: Deploying EVN's information system technical management software at the National Power Transmission Corporation and its affiliated units with 1 bidding package .
17/10/2024 17:08
National Power Transmission Corporation publishes the plan Adjustment of Technical Planning Phase 2 (Package 15, 16 for production preparation) - Project: 220kV Vung Ang transformer station and connection with 1 bidding package .
17/10/2024 08:30
National Power Transmission Corporation publishes the plan Contractor selection plan for phase 2 (project preparation phase) project: Hiep Hoa - Thai Nguyen 500 kV line with 1 bidding package .
16/10/2024 14:36
National Power Transmission Corporation publishes the plan Contractor selection plan - phase 2 of the Project: Installing the second transformer at Nam Cam 220kV substation with 9 bidding package .
16/10/2024 09:27
National Power Transmission Corporation publishes the plan Contractor selection plan - phase 2 of project: Installing the second transformer at Hai Ha 220kV transformer station with 9 bidding package .
10/10/2024 11:22
National Power Transmission Corporation publishes the plan Contractor selection plan (Phase 2) Project: Upgrading the 110 kV protection control system of the 220 kV Bac Giang substation with 4 bidding package .
09/10/2024 15:35
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor National Power Transmission Corporation has posted the request KHLCNT adjusted the package of 28 projects of the investor National Power Transmission Corporation with 1 bidding package.
25/10/2024 16:24
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan - phase 2 of the Project: Installing the second transformer at Nam Cam 220kV substation of the investor National Power Transmission Corporation with 9 bidding package.
23/10/2024 16:32
The Bid solicitor National Power Transmission Corporation has posted the request Approve the contractor selection plan for phase 1 (Investment preparation phase) Project: Nam Dinh 2 220kV transformer station and connection line of the investor National Power Transmission Corporation with 2 bidding package.
22/10/2024 17:06
The Bid solicitor National Power Transmission Corporation has posted the request contractor selection plan phase 2 - Phase 2 - Project: 220 kV substation connected to levels in 500 kV Pho Noi substation of the investor National Power Transmission Corporation with 9 bidding package.
22/10/2024 14:07
The Bid solicitor National Power Transmission Corporation has posted the request Cost estimation: Deploying EVN's information system technical management software at the National Power Transmission Corporation and its affiliated units of the investor National Power Transmission Corporation with 1 bidding package.
17/10/2024 17:08
The Bid solicitor National Power Transmission Corporation has posted the request Adjustment of Technical Planning Phase 2 (Package 15, 16 for production preparation) - Project: 220kV Vung Ang transformer station and connection of the investor National Power Transmission Corporation with 1 bidding package.
17/10/2024 08:30
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan for phase 2 (project preparation phase) project: Hiep Hoa - Thai Nguyen 500 kV line of the investor National Power Transmission Corporation with 1 bidding package.
16/10/2024 14:36
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan - phase 2 of the Project: Installing the second transformer at Nam Cam 220kV substation of the investor National Power Transmission Corporation with 9 bidding package.
16/10/2024 09:27
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan - phase 2 of project: Installing the second transformer at Hai Ha 220kV transformer station of the investor National Power Transmission Corporation with 9 bidding package.
10/10/2024 11:22
The Bid solicitor National Power Transmission Corporation has posted the request Contractor selection plan (Phase 2) Project: Upgrading the 110 kV protection control system of the 220 kV Bac Giang substation of the investor National Power Transmission Corporation with 4 bidding package.
09/10/2024 15:35
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s National Power Transmission Corporation has posted 319 of the contractor selection plan, which contains 1107 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor National Power Transmission Corporation posted 2 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor National Power Transmission Corporation has posted 92 Tender Notice in the 78 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor National Power Transmission Corporation has posted 44 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 44 package, canceled the bid 0 package (among the bidding packages above).
- There are 11 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor National Power Transmission Corporation has a relationship with 103 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor National Power Transmission Corporation has a relationship with 21 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor National Power Transmission Corporation is the investor of 2159 package, of which 56 package is self-invited, other units invite bid 2103 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor National Power Transmission Corporation is the owner of 2019 contractor selection plan. In which, they self-invite 319 of contractor selection plan, other units invite bids of 1700 of contractor selection plan.
Summary: Investor National Power Transmission Corporation is an investor with 529 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor National Power Transmission Corporation is the investor of 663 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code