Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế as follows:
- Has relationships with 1 contractor.
- Announced 33 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 6 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 6 packages that have not fully posted the contractor selection results. Of these 6 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 33 investment and development projects.
- As the owner of 39 Contractor selection plan in which 0 Contractor selection plan is self-published, and 39 Contractor selection plan is posted by other units.
- Being the investor of 26 bidding packages in which 0 packages are self-invited, and 26 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
Phòng Kinh tế Posted Development Investment Project invest in repair and construction of embankments and fences in the east of Martyrs Cemetery, Cam Thinh ward, Cam Pha city.
09/12/2020 07:00
Phòng Kinh tế Posted Development Investment Project renovating and dredging Nam Thach A stream (the section from the gate of the marble market to the junction of the stream bordering the Marble and Cam Thuy wards) Cam Thach ward, Cam Pha city.
21/09/2020 07:00
Phòng Kinh tế Posted Development Investment Project Repair and upgrade irrigation canal in Dong Ho village, Son Duong commune, Ha Long city, Quang Ninh province.
14/09/2020 07:00
Phòng Kinh tế Posted Development Investment Project To solidify the irrigation canal in the field (Channel route next to Da Trang temple), Da Trang village, Thong Nhat commune, Ha Long city, Quang Ninh province..
14/09/2020 07:00
Phòng Kinh tế Posted Development Investment Project Construction of drainage system along DT 750 route (from DH 614 road to Cau Sinh stream sluice), Cay Truong II commune.
24/04/2020 07:00
Phòng Kinh tế Posted Development Investment Project Construction of drainage system along DT 750 route from Mr. Cuong's house to Ong Cat stream, Suoi Can hamlet, Cay Truong II commune, Bau Bang district, Binh Duong province.
24/04/2020 07:00
Phòng Kinh tế Posted Development Investment Project Repairing, clearing vegetation, leveling and filling soil on the left bank of Ngu Huyen Khe river (river side and field side).
15/04/2020 07:00
Phòng Kinh tế Posted Development Investment Project Repairing and clearing vegetation, leveling and filling soil on the right bank of Ngu Huyen Khe river (river side and field side).
15/04/2020 07:00
Phòng Kinh tế Posted Development Investment Project Anti-erosion embankment on the right bank of Cai river in Binh Thanh village, Ninh Binh commune.
10/04/2020 07:00
Phòng Kinh tế Posted Development Investment Project Repairing, spreading crushed stone on the right bank of Ngu Huyen Khe river. Category: Section from Dong Huong bridge to Van Mon commune area.
23/03/2020 07:00
The data sheet has been partially hidden, to see the full information please Login or Register
Phòng Kinh tế publishes the plan Technical infrastructure for agricultural production in the Red River bank in 03 wards: Linh Nam, Tran Phu, Yen So (phase 1, 2014) with 6 bidding package .
10/10/2014 16:47
The data sheet has been partially hidden, to see the full information please Login or Register
Phòng Kinh tế Posted Development Investment Project invest in repair and construction of embankments and fences in the east of Martyrs Cemetery, Cam Thinh ward, Cam Pha city.
09/12/2020 07:00
Phòng Kinh tế Posted Development Investment Project renovating and dredging Nam Thach A stream (the section from the gate of the marble market to the junction of the stream bordering the Marble and Cam Thuy wards) Cam Thach ward, Cam Pha city.
21/09/2020 07:00
Phòng Kinh tế Posted Development Investment Project Repair and upgrade irrigation canal in Dong Ho village, Son Duong commune, Ha Long city, Quang Ninh province.
14/09/2020 07:00
Phòng Kinh tế Posted Development Investment Project To solidify the irrigation canal in the field (Channel route next to Da Trang temple), Da Trang village, Thong Nhat commune, Ha Long city, Quang Ninh province..
14/09/2020 07:00
Phòng Kinh tế Posted Development Investment Project Construction of drainage system along DT 750 route (from DH 614 road to Cau Sinh stream sluice), Cay Truong II commune.
24/04/2020 07:00
Phòng Kinh tế Posted Development Investment Project Construction of drainage system along DT 750 route from Mr. Cuong's house to Ong Cat stream, Suoi Can hamlet, Cay Truong II commune, Bau Bang district, Binh Duong province.
24/04/2020 07:00
Phòng Kinh tế Posted Development Investment Project Repairing, clearing vegetation, leveling and filling soil on the left bank of Ngu Huyen Khe river (river side and field side).
15/04/2020 07:00
Phòng Kinh tế Posted Development Investment Project Repairing and clearing vegetation, leveling and filling soil on the right bank of Ngu Huyen Khe river (river side and field side).
15/04/2020 07:00
Phòng Kinh tế Posted Development Investment Project Anti-erosion embankment on the right bank of Cai river in Binh Thanh village, Ninh Binh commune.
10/04/2020 07:00
Phòng Kinh tế Posted Development Investment Project Repairing, spreading crushed stone on the right bank of Ngu Huyen Khe river. Category: Section from Dong Huong bridge to Van Mon commune area.
23/03/2020 07:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Phòng Kinh tế has posted 1 of the contractor selection plan, which contains 6 of the bidding package. See full list here
Summary: The Bid solicitor Phòng Kinh tế has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Kinh tế has a relationship with 14 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Kinh tế is the owner of 39 contractor selection plan. In which, they self-invite 0 of contractor selection plan, other units invite bids of 39 of contractor selection plan.
Summary: Investor Phòng Kinh tế is an investor with 13 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Kinh tế is the investor of 33 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code