Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế xã Cù Lao Dung as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 14 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế xã Cù Lao Dung as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Phòng Kinh tế xã Cù Lao Dung are as follows:
- Is the investor of 14 development investment projects.
- Is the investor of 20 contractor selection plans, of which 0 were self-published, and 20 were published by other entities.
- Is the investor of 6 Tender Notices, of which 0 were self-invited, and 6 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Phòng Kinh tế xã Cù Lao Dung announced the results of the bid package Tender package No 04: Construction work .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TRƯỜNG ĐẠT VHH
30/08/2026 09:57
Phòng Kinh tế xã Cù Lao Dung announced the results of the bid package Package No. 05: Construction supervision .
- Winning bidder: CÔNG TY TNHH KHỞI NGHIỆP XANH
30/08/2026 09:54
Phòng Kinh tế xã Cù Lao Dung announced the results of the bid package Tender package No 04: Construction work .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG THIÊN NHỰT TIẾN
30/08/2026 09:52
Phòng Kinh tế xã Cù Lao Dung announced the results of the bid package Package No. 05: Construction supervision .
- Winning bidder: CÔNG TY TNHH KHỞI NGHIỆP XANH
30/08/2026 09:48
Phòng Kinh tế xã Cù Lao Dung announced the results of the bid package Package No. 05: Construction supervision .
- Winning bidder: CÔNG TY TNHH KHỞI NGHIỆP XANH
30/08/2026 09:43
Phòng Kinh tế xã Cù Lao Dung announced the results of the bid package Tender package No 04: Construction work .
- Winning bidder: CÔNG TY TNHH TM DV XÂY DỰNG TOÀN THỊNH PHÁT
30/08/2026 09:39
Phòng Kinh tế xã Cù Lao Dung publishes the plan (1) An Hung Village: Slope stabilization of the embankment at the head of Mu U canal; (2) Pham Thanh Hon B village: Section near Mr. Ho Thanh Quyet's house; section near Mrs. Kim Thi Nu's house; (3) Van Ho village: Reinforcement and slope stabilization work at the former An Thang Nam People's Committee office (2 sections); (4) Vo Thanh Van village: Repairing and stabilizing the 7 Ung ditch; reinforcement of the rural road along Rach Su; (5) Pham Thanh Hon A village: Reinforcement to prevent flooding in the Cu Lao Dung Vocational and General Education Center area; (6) Sau Thu village: Reinforcement against slope collapse under the Six Tinh bridge, adjacent to the cultural center; (7) An Nghiep village: Repairing and stabilizing the Ong Tu canal ditch; reinforcement of the public dam adjacent to Mr. Chien's house; (8) An Bin village: Repairing the Rach Chol bridge abutment; reinforcement of the Ba Hoi ditch; reinforcement of the ditch adjacent to Mr. Tu Long's house; (9) Van Sau village: Repairing and stabilizing the 5 Luc ditch on the inside; (10) An Quoi village: Reinforcement and repair of the An Quoi residential area embankment; (11) Van Ho A village: Repairing the embankment of the former 416 farm; Vo Thanh Van village: Repairing and stabilizing the 35A square dam. with 2 bidding package .
20/08/2026 14:56
Phòng Kinh tế xã Cù Lao Dung publishes the plan Project bidding plan for dredging: Gốc canal, Bà Bảy canal, Ba Túc canal, Ngát canal, Nảy canal, Ông Sơn ditch, Mương Ranh ditch, Ông Tám ditch, Ba Nò canal, Voi to Cầu An Sinh bridge, 5 Tiền canal, Voi 2 to the end of Mr. Dung's road, 5 Đằng public canal, Hai Đờn public canal, Sáu Tính public canal with 2 bidding package .
20/08/2026 14:48
Phòng Kinh tế xã Cù Lao Dung publishes the plan plans for selecting contractors for the following projects: Bông Dam, Ông Minh Dam; Bông, Rạch Voi branch; Bông, Bến Bạ River dike dam adjacent to Chùa An Hòa; Bông, Bến Bạ River dike dam adjacent to Bà Cẩm's house; Bông, Nước Mặn excavation and construction of 70 new dams in the villages and communes of Cù Lao Dung. with 2 bidding package .
20/08/2026 14:36
Phòng Kinh tế xã Cù Lao Dung publishes the plan Plan for Selecting a Contractor: Cost of Implementing the Master Plan for the Village of Cu Lao Dung to 2050 with 2 bidding package .
14/08/2026 14:33
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects