Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế xã Đông Cứu as follows:
- Has relationships with 1 project owners.
- Has relationships with 6 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế xã Đông Cứu as follows:
- Has relationships with 6 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Phòng Kinh tế xã Đông Cứu are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 9 contractor selection plans, of which 0 were self-published, and 9 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Phòng Kinh tế xã Đông Cứu publishes Tender Notice Tender package No 01: Environmental sanitation, tree care and pruning, and lighting system operation on roads in Dong Cuu commune in 2026-2028 in the form Open bidding .
31/12/2025 21:08
Phòng Kinh tế xã Đông Cứu publishes the plan Environmental sanitation services, tree care and pruning, and lighting system operation on roads in Dong Cuu commune in 2026-2028 with 3 bidding package .
31/12/2025 18:03
Phòng Kinh tế xã Đông Cứu announced the results of the bid package Package No. 01: Collection and transportation of domestic solid waste .
- Winning bidder: GIA BINH ENVIRONMENTAL SERVICES JOINT STOCK COMPANY
30/12/2025 08:46
Phòng Kinh tế xã Đông Cứu announced the results of the bid package Bidding package No. 02: Prepare bidding documents, evaluate bidding documents for bidding package No. 01 .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI NGỌC GIANG
25/12/2025 16:45
Phòng Kinh tế xã Đông Cứu announced the results of the bid package Providing three-wheeled garbage collection trucks to the Economic Department of Dong Cuu commune .
- Winning bidder: HỘ KINH DOANH TRỊNH THỊ THÊU
24/12/2025 17:00
Phòng Kinh tế xã Đông Cứu publishes the plan LCNT plan Providing three-wheeled hand-pulled garbage collection vehicles with 1 bidding package .
24/12/2025 16:57
Phòng Kinh tế xã Đông Cứu publishes the plan Contractor selection plan to provide three-wheeled garbage collection trucks for the Economic Department of Dong Cuu commune with 1 bidding package .
24/12/2025 16:38
Investor Phòng Kinh tế xã Đông Cứu has posted an investment and development project Providing three-wheeled garbage collection trucks to the Economic Department of Dong Cuu commune.
24/12/2025 16:16
Investor Phòng Kinh tế xã Đông Cứu has posted an investment and development project Providing three-wheeled garbage collection trucks.
24/12/2025 16:16
Phòng Kinh tế xã Đông Cứu announced the results of the bid package Package No. 1 Repairing the lighting system on Dong Cuu commune roads in 2025 .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ CÔNG ÍCH GIA BÌNH
24/12/2025 09:53
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Phòng Kinh tế xã Đông Cứu has a relationship with 6 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Phòng Kinh tế xã Đông Cứu has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects