Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế xã Đồng Dương as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 5 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế xã Đồng Dương as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Phòng Kinh tế xã Đồng Dương are as follows:
- Is the investor of 5 development investment projects.
- Is the investor of 14 contractor selection plans, of which 0 were self-published, and 14 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Phòng Kinh tế xã Đồng Dương publishes the plan Plan for selecting a contractor for the preparation phase of the investment.
Project: Repairing National Highway 14E route to Township 18-17, Chau Lam Village. with 3 bidding package .
29/08/2026 15:36
Phòng Kinh tế xã Đồng Dương publishes the plan Phase 1: Contractor Selection for Investment Preparation
Project: Repair of National Highway 14E (GTNT) route to Village 17, Chau Lam Commune with 3 bidding package .
29/08/2026 15:12
Phòng Kinh tế xã Đồng Dương publishes the plan Project: New construction of Cay Chau dam, Cao Ngan village with 3 bidding package .
24/07/2026 11:06
Phòng Kinh tế xã Đồng Dương publishes the plan Buy computers for regular work in the digital environment, computers for processing confidential documents, printers and scanners for processing confidential documents of Dong Duong Commune Economic Department with 1 bidding package .
16/07/2026 08:16
Phòng Kinh tế xã Đồng Dương publishes the plan Print the A0 map sheet in color, photocopy the description of the boundaries and landmarks of the land plot
and print in color notices of instructions for placing landmarks to serve the measurement and mapping work
Cadastral maps and land database construction in Dong Duong commune with 1 bidding package .
26/06/2026 11:04
Phòng Kinh tế xã Đồng Dương announced the results of the bid package Civil Works .
- Winning bidder: LONG CHAU SON CONTRUCTION AND TRADING COMPANY LIMITED
26/06/2026 10:59
Phòng Kinh tế xã Đồng Dương announced the results of the bid package Supervision consulting .
- Winning bidder: CÔNG TY CỔ PHẦN THIẾT KẾ VÀ XÂY DỰNG AN NHÂN
25/06/2026 10:46
Phòng Kinh tế xã Đồng Dương announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG KHẢI THỊNH 79
25/06/2026 10:42
Phòng Kinh tế xã Đồng Dương publishes the plan Invest in a low voltage electrical system from group 2 to Ho Chua Dong Luan, Hien Loc village with 3 bidding package .
25/06/2026 10:34
Investor Phòng Kinh tế xã Đồng Dương has posted an investment and development project Invest in a low voltage electrical system from group 2 to Ho Chua Dong Luan, Hien Loc village.
25/06/2026 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects