Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh Tế xã Ea Ktur as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 31 investment development project, of which 11 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh Tế xã Ea Ktur as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Phòng Kinh Tế xã Ea Ktur are as follows:
- Is the investor of 31 development investment projects.
- Is the investor of 30 contractor selection plans, of which 0 were self-published, and 30 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Phòng Kinh Tế xã Ea Ktur announced the results of the bid package Consultancy on appraisal of documents and results of LCNT .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG CAO THANH
28/08/2026 11:23
Phòng Kinh Tế xã Ea Ktur announced the results of the bid package Consultancy on appraisal of documents and results of LCNT .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG CAO THANH
28/08/2026 11:21
Phòng Kinh Tế xã Ea Ktur announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: CÔNG TY TNHH XD DƯƠNG HOÀNG
28/08/2026 11:18
Phòng Kinh Tế xã Ea Ktur announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: CÔNG TY TNHH XD DƯƠNG HOÀNG
28/08/2026 11:16
Phòng Kinh Tế xã Ea Ktur publishes the plan Internal road network in the Trung Hoa urban area with 5 bidding package .
28/08/2026 11:14
Phòng Kinh Tế xã Ea Ktur publishes the plan The road from Km 13+300 of National Highway 27 to Buon Ciet village and Village 11A. with 5 bidding package .
28/08/2026 11:04
Investor Phòng Kinh Tế xã Ea Ktur has posted an investment and development project Internal road network in the Trung Hoa urban area.
28/08/2026 10:10
Investor Phòng Kinh Tế xã Ea Ktur has posted an investment and development project The road from Km 13+300 of National Highway 27 to Buon Ciet village and Village 11A..
28/08/2026 10:10
Phòng Kinh Tế xã Ea Ktur announced the results of the bid package Construction of the project .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VIỆT THIÊN AN
22/08/2026 16:18
Phòng Kinh Tế xã Ea Ktur announced the results of the bid package Construction supervision consultancy .
- Winning bidder: Công ty TNHH tư vấn xây dựng An Quân
22/08/2026 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects