Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Phòng kinh tế xã Khâu Vai as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 2 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Phòng kinh tế xã Khâu Vai as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Phòng kinh tế xã Khâu Vai are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 3 contractor selection plans, of which 0 were self-published, and 3 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor Phòng kinh tế xã Khâu Vai has posted an investment and development project Local adjustments to the Comprehensive Construction Plan for the villages of Khâu Vai, Lũng Pù, and Cán Chu Phìn in Mèo Vạc District, Hà Giang Province, for the period 2021-2030 (now part of Khâu Vai Village, Tuyên Quang Province).
07/08/2026 10:10
Phòng kinh tế xã Khâu Vai announced the results of the bid package Package No. 03: Construction works: Renovating, upgrading, maintaining and overcoming consequences of natural disasters, sections Km12+950, Km16+850; Km18+550, Km20+200 (DT.217) go to National Highway 4C .
- Winning bidder: CÔNG TY TNHH 30-4
25/06/2026 15:58
Phòng kinh tế xã Khâu Vai publishes Tender Notice Tender package No 03: Construction works: Renovating, upgrading, maintaining and overcoming consequences of natural disasters, sections Km12+950, Km16+850; Km18+550, Km20+200 (DT.217) go to National Highway 4C in the form Open bidding .
27/05/2026 16:39
Phòng kinh tế xã Khâu Vai publishes the plan Contractor selection plan for project implementation phase: Renovating, upgrading, maintaining and overcoming consequences of natural disasters, sections Km12+950, Km16+850; Km18+550, Km20+200 (DT.217) go to National Highway 4C with 4 bidding package .
26/05/2026 11:20
Investor Phòng kinh tế xã Khâu Vai has posted an investment and development project Renovate, upgrade, maintain and repair natural disaster consequences of sections Km12+950, Km16+850; Km18+550, Km20+200 (DT.217) go to National Highway 4C.
26/05/2026 11:11
Phòng kinh tế xã Khâu Vai announced the results of the bid package Package 03: Project Management Consulting .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG MINH HƯNG HÀ GIANG
22/04/2026 17:16
Phòng kinh tế xã Khâu Vai announced the results of the bid package Bidding Package No. 01: Survey - Preparation of Technical Audit Report .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ ĐẦU TƯ VÀ XÂY DỰNG PHÚ QUÝ
22/04/2026 17:14
Phòng kinh tế xã Khâu Vai publishes the plan Contractor selection plan Project Investment Preparation Phase: Renovating, upgrading, maintaining and overcoming consequences of natural disasters, sections Km12+950, Km16+850; Km18+550, Km20+200 (DT.217) go to National Highway 4C with 3 bidding package .
22/04/2026 16:55
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects