Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors PHÒNG KINH TẾ XÃ PHƯỚC HÒA as follows:
- Has relationships with 1 project owners.
- Has relationships with 2 contractor.
- Announced 7 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors PHÒNG KINH TẾ XÃ PHƯỚC HÒA as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor PHÒNG KINH TẾ XÃ PHƯỚC HÒA are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 32 contractor selection plans, of which 0 were self-published, and 32 were published by other entities.
- Is the investor of 5 Tender Notices, of which 0 were self-invited, and 5 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
PHÒNG KINH TẾ XÃ PHƯỚC HÒA publishes Tender Notice Construction in the form Open bidding .
28/08/2026 15:37
PHÒNG KINH TẾ XÃ PHƯỚC HÒA announced the results of the bid package Consultancy and verification of construction drawing design - cost estimate .
- Winning bidder: Công ty TNHH Một thành viên tư vấn xây dựng Minh Quân
25/08/2026 17:28
PHÒNG KINH TẾ XÃ PHƯỚC HÒA announced the results of the bid package Construction .
- Winning bidder: GIA NGUYÊN CONSULTANCY - INVESTING CONSTRUCTION & TRADING CO.,LTD
25/08/2026 16:15
PHÒNG KINH TẾ XÃ PHƯỚC HÒA announced the results of the bid package Consulting, surveying, designing construction drawings - cost estimates .
- Winning bidder: Công ty cổ phần xây dựng Phước Tín
20/08/2026 15:37
PHÒNG KINH TẾ XÃ PHƯỚC HÒA announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG AN PHÁT VNC
18/08/2026 16:56
PHÒNG KINH TẾ XÃ PHƯỚC HÒA publishes the plan Project plan for selecting contractors and executing the project (design and construction phase – cost estimation): Upgrade of existing roads in Phuoc Hoa commune (Phase 3) with 3 bidding package .
18/08/2026 16:53
Investor PHÒNG KINH TẾ XÃ PHƯỚC HÒA has posted an investment and development project Upgrade of road infrastructure in Phuoc Hoa commune (Phase 3).
18/08/2026 16:16
PHÒNG KINH TẾ XÃ PHƯỚC HÒA announced the results of the bid package Consultation on design review, construction drawings, and construction cost estimation for projects. .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TƯ VẤN XÂY DỰNG ĐÔNG NAM BỘ
14/08/2026 15:37
PHÒNG KINH TẾ XÃ PHƯỚC HÒA announced the results of the bid package Consultation on developing a local adjustment plan for the overall development planning of Phuoc Hoa commune until 2030. .
- Winning bidder: URBAN PLANNING INSTITUTE
14/08/2026 10:22
PHÒNG KINH TẾ XÃ PHƯỚC HÒA publishes the plan Local amendment of the general planning for the development of Phuoc Hoa commune until 2030 with 1 bidding package .
12/08/2026 07:16
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PHÒNG KINH TẾ XÃ PHƯỚC HÒA has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity PHÒNG KINH TẾ XÃ PHƯỚC HÒA has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects