Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 7 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 8 contractor selection plans, of which 0 were self-published, and 8 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY publishes the plan Plan for Selecting Contractors for the Project: Traffic Signal and Road Safety System in the Village with 3 bidding package .
26/08/2026 21:44
PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY publishes the plan Project Procurement Plan: Signaling and Traffic Safety System for Intersections of National Highway 50 and Provincial Road 830, including side roads. with 3 bidding package .
26/08/2026 21:32
Investor PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY has posted an investment and development project The signaling system and traffic safety measures for intersections along National Highway 50 and Provincial Road 830, including side roads..
26/08/2026 21:21
Investor PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY has posted an investment and development project Traffic signal system and traffic safety measures on rural roads..
26/08/2026 21:21
PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY publishes the plan Dredging of Channels K3-K4 with 3 bidding package .
11/08/2026 11:40
PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY publishes the plan Road stabilization against landslides in Voi Don with 3 bidding package .
11/08/2026 11:30
PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY publishes the plan Repair work on Highway No. 19, Dong Thap – Tan Tap (Kilometers 0+000 to 0+300) with 3 bidding package .
11/08/2026 11:17
Investor PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY has posted an investment and development project Repair work on Highway No. 19, Dong Thap – Tan Tap (Kilometers 0+000 to 0+300).
11/08/2026 11:11
Investor PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY has posted an investment and development project Road stabilization against landslides in Voi Don.
11/08/2026 11:11
Investor PHÒNG KINH TẾ XÃ PHƯỚC VĨNH TÂY has posted an investment and development project Dredging of Channels K3-K4.
11/08/2026 11:11
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects