Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors PHÒNG KINH TẾ XÃ THẠNH HƯNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 26 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors PHÒNG KINH TẾ XÃ THẠNH HƯNG as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor PHÒNG KINH TẾ XÃ THẠNH HƯNG are as follows:
- Is the investor of 26 development investment projects.
- Is the investor of 54 contractor selection plans, of which 0 were self-published, and 54 were published by other entities.
- Is the investor of 6 Tender Notices, of which 0 were self-invited, and 6 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
PHÒNG KINH TẾ XÃ THẠNH HƯNG publishes the plan Ten River (from Ten Canal to KH3 canal); Tu Nga River (from KH-38 to Cung canal); Hau River (from Trac ditch to Chua Pho canal); Xuan Ca River (from Trac ditch to Tu Dieu canal); Tu Dieu River (from Thot Not outlet to KH3 boundary); Number 4 River (from Dong Pháp to Tam Nga); Xuan Ca River (from Chua Pho to Tu Dieu canal) with 3 bidding package .
26/08/2026 11:11
Investor PHÒNG KINH TẾ XÃ THẠNH HƯNG has posted an investment and development project Ten River (from Ten Canal to KH3 canal); Tu Nga River (from KH-38 to Cung canal); Hau River (from Trac ditch to Chua Pho canal); Xuan Ca River (from Trac ditch to Tu Dieu canal); Tu Dieu River (from Thot Not outlet to KH3 boundary); Number 4 River (from Dong Pháp to Tam Nga); Xuan Ca River (from Chua Pho to Tu Dieu canal).
26/08/2026 11:11
PHÒNG KINH TẾ XÃ THẠNH HƯNG publishes the plan Channel 20 (From Ranh Canal to KH3, from KH3 to the end of the canal); Channel Xeo (From Duong Lau Canal to the end of the canal); Channel Nam Chau (From KH3 Canal to Ranh Canal); Channel Hau Cong Da (From the concrete culvert in KH3 Canal to the end of the canal); Channel 1200 (From Chet Si Canal to the end of the canal); Channel Nong Truong Huyen Doi (From KH3 Canal to Huynh Ky Canal) with 2 bidding package .
26/08/2026 10:34
Investor PHÒNG KINH TẾ XÃ THẠNH HƯNG has posted an investment and development project Út Nhái River (from Xang That Not to Ky Dong Canal); Bà Cô River (from KH5-2 Canal to Huyện Ranh Xa Ngọc Chu Canal); Huynh Trung Tính River (from Huynh Trung Tính's house to Nguyen Van Doi's house); Water Banana River (from Ba Lan Canal to Bien Mười Canal); Water Banana River (from KH-38 Canal to Bien Mười Canal); 9 Tung River (from Xang That Not to Ngàn Nhì Giap Ky Chua Canal).
26/08/2026 10:10
Investor PHÒNG KINH TẾ XÃ THẠNH HƯNG has posted an investment and development project Channel 20 (From Ranh Canal to KH3, from KH3 to the end of the canal); Channel Xeo (From Duong Lau Canal to the end of the canal); Channel Nam Chau (From KH3 Canal to Ranh Canal); Channel Hau Cong Da (From the concrete culvert in KH3 Canal to the end of the canal); Channel 1200 (From Chet Si Canal to the end of the canal); Channel Nong Truong Huyen Doi (From KH3 Canal to Huynh Ky Canal).
26/08/2026 10:10
PHÒNG KINH TẾ XÃ THẠNH HƯNG publishes the plan Út Nhái River (from Xang That Not to Ky Dong Canal); Bà Cô River (from KH5-2 Canal to Huyện Ranh Xa Ngọc Chu Canal); Huynh Trung Tính River (from Huynh Trung Tính's house to Nguyen Van Doi's house); Water Banana River (from Ba Lan Canal to Bien Mười Canal); Water Banana River (from KH-38 Canal to Bien Mười Canal); 9 Tung River (from Xang That Not to Ngàn Nhì Giap Ky Chua Canal) with 2 bidding package .
26/08/2026 10:08
PHÒNG KINH TẾ XÃ THẠNH HƯNG publishes the plan Channel 2 (from Dong Pháp Canal to Tam Nga Canal); Hậu Canal (from KH5 Canal to the end of the canal); Ma Da Canal (from Tram Bau Canal to the end of the canal); Mau Ngang Canal (from KH7-17 Canal to Ranh Canal) with 2 bidding package .
26/08/2026 09:49
Investor PHÒNG KINH TẾ XÃ THẠNH HƯNG has posted an investment and development project Channel 2 (from Dong Pháp Canal to Tam Nga Canal); Hậu Canal (from KH5 Canal to the end of the canal); Ma Da Canal (from Tram Bau Canal to the end of the canal); Mau Ngang Canal (from KH7-17 Canal to Ranh Canal).
26/08/2026 09:09
PHÒNG KINH TẾ XÃ THẠNH HƯNG announced the results of the bid package Bid package No. 02: Cost of consulting and supervising TCXD for bidding package No. 01 .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TƯ VẤN XÂY DỰNG TIẾN QUANG ĐĂNG
11/08/2026 10:40
PHÒNG KINH TẾ XÃ THẠNH HƯNG announced the results of the bid package Bid No. 01: Construction costs + temporary housing costs .
- Winning bidder: HOANG NGO TRAN COMPANY LIMITED
11/08/2026 10:35
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PHÒNG KINH TẾ XÃ THẠNH HƯNG has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity PHÒNG KINH TẾ XÃ THẠNH HƯNG has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects