Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ as follows:
- Has relationships with 1 project owners.
- Has relationships with 0 contractor.
- Announced 1 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 2 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 4 contractor selection plans, of which 2 were self-published, and 2 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH MTV NGUYÊN KHOA KON TUM has posted the results of the bidding package Bidding package for non-consulting services: Scientific correction of backlog documents at district Agriculture and Rural Development Department, District Economic and Infrastructure Department, District Culture and Information Department, District Justice Department, and District Health Department district economic, district Ethnic Minority Office from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ.
- Winning bidder: NAHA-METAL SERVICE TRADING COMPANY LIMITED
13/10/2023 15:40
Bid solicitor CÔNG TY TNHH MTV NGUYÊN KHOA KON TUM has posted Tender Notice Bidding package for non-consulting services: Scientific correction of backlog documents at district Agriculture and Rural Development Department, District Economic and Infrastructure Department, District Culture and Information Department, District Justice Department, and District Health Department district economic, district Ethnic Minority Office from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with the form Competitive Offer.
05/09/2023 03:35
The Bid solicitor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted the request Plan for selecting contractors for bidding packages under the estimate: Scientific correction of backlog documents at the District Department of Agriculture and Rural Development, District Economic and Infrastructure Department, District Culture and Information Department, and District Advisory Department District Law, District Health Office, District Ethnic Minority Office from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with 2 bidding package.
28/07/2023 15:21
The Bid solicitor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted the request Plan for selecting contractors for bidding packages under the estimate: Scientific correction of backlog documents at the District Department of Agriculture and Rural Development, District Economic and Infrastructure Department, District Culture and Information Department, and District Advisory Department District Law, District Health Office, District Ethnic Minority Office from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with 2 bidding package.
28/07/2023 15:04
Bid solicitor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted Tender Notice Scientific correction of backlog documents at the district Department of Labor, Invalids and Social Affairs, and district Department of Natural Resources and Environment from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with the form National Competitive Bidding.
08/07/2022 15:45
The Bid solicitor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted the request Scientific correction of backlog documents at the district Department of Labor, Invalids and Social Affairs, and district Department of Natural Resources and Environment from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with 2 bidding package.
08/07/2022 15:10
The Bid solicitor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted the request Scientific correction of backlog documents at the district Department of Labor, Invalids and Social Affairs, and district Department of Natural Resources and Environment from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with 2 bidding package.
30/05/2022 15:54
Investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted an investment and development project Scientifically correcting backlog documents at the District Department of Labor, Invalids and Social Affairs, District Department of Natural Resources and Environment from 2013 and earlier..
30/05/2022 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ publishes the plan Plan for selecting contractors for bidding packages under the estimate: Scientific correction of backlog documents at the District Department of Agriculture and Rural Development, District Economic and Infrastructure Department, District Culture and Information Department, and District Advisory Department District Law, District Health Office, District Ethnic Minority Office from 2013 and earlier with 2 bidding package .
28/07/2023 15:21
PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ publishes the plan Plan for selecting contractors for bidding packages under the estimate: Scientific correction of backlog documents at the District Department of Agriculture and Rural Development, District Economic and Infrastructure Department, District Culture and Information Department, and District Advisory Department District Law, District Health Office, District Ethnic Minority Office from 2013 and earlier with 2 bidding package .
28/07/2023 15:04
PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ publishes the plan Plan for selecting contractors for bidding packages under the estimate: Scientific correction of backlog documents at the District Department of Agriculture and Rural Development, District Economic and Infrastructure Department, District Culture and Information Department, and District Advisory Department District Law, District Health Office, District Ethnic Minority Office from 2013 and earlier with 2 bidding package .
22/03/2023 08:38
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH MTV NGUYÊN KHOA KON TUM has posted the results of the bidding package Bidding package for non-consulting services: Scientific correction of backlog documents at district Agriculture and Rural Development Department, District Economic and Infrastructure Department, District Culture and Information Department, District Justice Department, and District Health Department district economic, district Ethnic Minority Office from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ.
- Winning bidder: NAHA-METAL SERVICE TRADING COMPANY LIMITED
13/10/2023 15:40
Bid solicitor CÔNG TY TNHH MTV NGUYÊN KHOA KON TUM has posted Tender Notice Bidding package for non-consulting services: Scientific correction of backlog documents at district Agriculture and Rural Development Department, District Economic and Infrastructure Department, District Culture and Information Department, District Justice Department, and District Health Department district economic, district Ethnic Minority Office from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with the form Competitive Offer.
05/09/2023 03:35
The Bid solicitor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted the request Plan for selecting contractors for bidding packages under the estimate: Scientific correction of backlog documents at the District Department of Agriculture and Rural Development, District Economic and Infrastructure Department, District Culture and Information Department, and District Advisory Department District Law, District Health Office, District Ethnic Minority Office from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with 2 bidding package.
28/07/2023 15:21
The Bid solicitor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted the request Plan for selecting contractors for bidding packages under the estimate: Scientific correction of backlog documents at the District Department of Agriculture and Rural Development, District Economic and Infrastructure Department, District Culture and Information Department, and District Advisory Department District Law, District Health Office, District Ethnic Minority Office from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with 2 bidding package.
28/07/2023 15:04
Bid solicitor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted Tender Notice Scientific correction of backlog documents at the district Department of Labor, Invalids and Social Affairs, and district Department of Natural Resources and Environment from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with the form National Competitive Bidding.
08/07/2022 15:45
The Bid solicitor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted the request Scientific correction of backlog documents at the district Department of Labor, Invalids and Social Affairs, and district Department of Natural Resources and Environment from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with 2 bidding package.
08/07/2022 15:10
The Bid solicitor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted the request Scientific correction of backlog documents at the district Department of Labor, Invalids and Social Affairs, and district Department of Natural Resources and Environment from 2013 and earlier of the investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ with 2 bidding package.
30/05/2022 15:54
Investor PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted an investment and development project Scientifically correcting backlog documents at the District Department of Labor, Invalids and Social Affairs, District Department of Natural Resources and Environment from 2013 and earlier..
30/05/2022 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has posted 3 of the contractor selection plan, which contains 2 of the bidding package. See full list here
Summary: The procuring entity PHÒNG NỘI VỤ HUYỆN ĐĂK TÔ has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects