Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Power Transmission Company 4 as follows:
- Has relationships with 11 project owners.
- Has relationships with 878 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2113 contractor selection plans with a total of 2848 bidding packages, of which 2088 prequalification documents have not found the investment project.
- Has invited bids for 2535 packages (with 2635 tender notices), and conducted prequalification for 0 packages.
- There are 59 bidding packages with content that needs clarification.
- Announced the results of 1936 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 395 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1167 packages that have not fully posted the contractor selection results. Of these 934 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.43 contractors.
- Breakdown by bidding field: Goods 48.39%, Construction 26.72%, Consultancy 8.12%, Non-consultancy 16.09%, Mixed 0.30%, Other fields 0.38%.
- The total value according to the packages with valid contractor selection results is: 5,026,645,938,169 VND, of which the total winning bid value is: 3,804,267,421,257 VND.
- The savings rate is: 24.32%.
Data analysis results of DauThau.info software for bid solicitors Power Transmission Company 4 as follows:
- Has relationships with 878 contractor.
- The average number of contractors participating in each bidding package is: 2.43 contractors.
- Proportion of bidding fields: Goods 48.39%, Construction 26.72%, Consulting 8.12%, Non-consulting 16.09%, Mixed 0.30%, Other 0.38%.
- The total value according to the bidding package with valid IMP is: 5,026,645,938,169 VND, in which the total winning value is: 3,804,267,421,257 VND.
- The savings rate is: 24.32%.
This Bid solicitor is also an investor. The analysis results of data for the investor Power Transmission Company 4 are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 1961 contractor selection plans, of which 1938 were self-published, and 23 were published by other entities.
- Is the investor of 1879 Tender Notices, of which 1818 were self-invited, and 61 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Power Transmission Company 4 publishes the plan Transporting and treating MBA contaminated with PCB company Materials with 1 bidding package .
08/09/2025 17:00
Power Transmission Company 4 publishes the plan Works: Repairing the operation management team of Vung Tau line under the regular repair plan 2025 with 1 bidding package .
29/08/2025 10:08
Power Transmission Company 4 publishes the plan Plan to select the 1st contractor of the project: Enhance the ability to load 220kV Phu My - Tan Thanh with 2 bidding package .
29/08/2025 09:50
Power Transmission Company 4 publishes the plan Prepare information security level of 07 information systems under the Project upgrading the protection control system (Ban AMN Project Management) with 1 bidding package .
26/08/2025 18:01
Power Transmission Company 4 publishes the plan Repairing the system of tie the 220kV lines of the Electrical Transmission Teams of the SCL 2025 plan with 1 bidding package .
22/08/2025 11:12
Power Transmission Company 4 publishes the plan Network security evaluation for typical technology TBA with 1 bidding package .
22/08/2025 11:04
Power Transmission Company 4 publishes the plan Project: Repair 09 office, 09 WC rooms, waterproofing, roofs, slaves, replacement plaster ceiling corridor Tay Ninh Power Transmission team under regular repair plan in 2025 with 1 bidding package .
21/08/2025 14:23
Power Transmission Company 4 publishes the plan The works of the Electrical Experimental Repair Team 4 with 3 bidding package .
21/08/2025 10:17
Power Transmission Company 4 publishes the plan Providing supplies and equipment for large repair works in 2026 phase 3 with 1 bidding package .
11/08/2025 16:22
Power Transmission Company 4 publishes the plan Buy 110kV, 220kV lightning protection for backup goods EVNNPT with 1 bidding package .
08/08/2025 16:06
The data sheet has been partially hidden, to see the full information please Login or Register
Power Transmission Company 4 publishes the plan Replace the 274 -phase cutting machine for GE T&D India Limited with 1 bidding package .
19/06/2025 17:12
Power Transmission Company 4 publishes the plan The list of 05-seat Ford Ranger (0.75T pickup), license plate 51D-373.37, card number: TT4-202410172, Code: 1,310202.1000198. Category: Making copper, painting part of the barrel, chassi and car cabin; Replace the right ceiling lights and rear steering lights, make mattress tape, replace the cabin and the cabin floor, replace the body, replace the tray, replace the tray, take the ball, remove the momentum, restore the pigs + bum, replace the right door soaked lock, replace the back glass of the right door, restore the back door of the rear box frame, close the silver + back of the back door, replace the back of the stuff, replace the back of the door, replace the back of the door, replace the back of the door, replace the back of the door. After, paint the tray, change the leaves of the car wiper with 1 bidding package .
18/06/2025 12:18
Power Transmission Company 4 publishes the plan Replace the screen of 87B TC C22 relay 500kV Duyen Hai station damaged, not guaranteed to operate, with 1 bidding package .
17/06/2025 15:17
Power Transmission Company 4 publishes the plan Repair the number 1 loader brand, CR188 HPT N100 220C - 220kV Tra Vinh station with 1 bidding package .
17/06/2025 15:11
Power Transmission Company 4 publishes the plan Repair zoom camera integrated zenmuse H20T thermal camera H20T UAV MATRICE 300RTK Flight Equipment belongs to Western Power Transmission 1 with 1 bidding package .
12/06/2025 14:14
Power Transmission Company 4 publishes the plan Connecting daily -life wastewater for 220kV Binh Hoa station with 1 bidding package .
11/06/2025 14:38
Power Transmission Company 4 publishes the plan Replace the relay to choose the time of switching the damaged K502 cutting machine - 500kV Chon transformer station with 1 bidding package .
10/06/2025 10:02
Power Transmission Company 4 publishes the plan Equipped with personal protective equipment of Western Power Transmission 2 years 2025 with 1 bidding package .
09/06/2025 09:11
Power Transmission Company 4 publishes the plan Paint the Fire Prevention and Fighting System of 500KV My Tho Station faded, peeling paint. with 1 bidding package .
09/06/2025 09:02
Power Transmission Company 4 publishes the plan Equipped with personal protective equipment of Western Power Transmission 1 year 2025 with 1 bidding package .
06/06/2025 09:59
The data sheet has been partially hidden, to see the full information please Login or Register
Power Transmission Company 4 publishes the plan Transporting and treating MBA contaminated with PCB company Materials with 1 bidding package .
08/09/2025 17:00
Power Transmission Company 4 publishes the plan Works: Repairing the operation management team of Vung Tau line under the regular repair plan 2025 with 1 bidding package .
29/08/2025 10:08
Power Transmission Company 4 publishes the plan Plan to select the 1st contractor of the project: Enhance the ability to load 220kV Phu My - Tan Thanh with 2 bidding package .
29/08/2025 09:50
Power Transmission Company 4 publishes the plan Prepare information security level of 07 information systems under the Project upgrading the protection control system (Ban AMN Project Management) with 1 bidding package .
26/08/2025 18:01
Power Transmission Company 4 publishes the plan Repairing the system of tie the 220kV lines of the Electrical Transmission Teams of the SCL 2025 plan with 1 bidding package .
22/08/2025 11:12
Power Transmission Company 4 publishes the plan Network security evaluation for typical technology TBA with 1 bidding package .
22/08/2025 11:04
Power Transmission Company 4 publishes the plan Project: Repair 09 office, 09 WC rooms, waterproofing, roofs, slaves, replacement plaster ceiling corridor Tay Ninh Power Transmission team under regular repair plan in 2025 with 1 bidding package .
21/08/2025 14:23
Power Transmission Company 4 publishes the plan The works of the Electrical Experimental Repair Team 4 with 3 bidding package .
21/08/2025 10:17
Power Transmission Company 4 publishes the plan Providing supplies and equipment for large repair works in 2026 phase 3 with 1 bidding package .
11/08/2025 16:22
Power Transmission Company 4 publishes the plan Buy 110kV, 220kV lightning protection for backup goods EVNNPT with 1 bidding package .
08/08/2025 16:06
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Power Transmission Company 4 has posted 2113 of the contractor selection plan, which contains 2848 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Power Transmission Company 4 has posted 2635 Tender Notices in 2535 bidding packages. Among these, 1927 Tender Notices were self-invited, and 708 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Power Transmission Company 4 has posted 1936 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1936 package, canceled the bid 0 package (among the bidding packages above).
- There are 395 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Power Transmission Company 4 has a relationship with 878 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Power Transmission Company 4 has a relationship with 40 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Power Transmission Company 4 has a relationship with 12 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects