Data analysis results of DauThau.info software for bid solicitors Project Management Board of Hue Monuments as follows:
- Has relationships with 2 project owners.
- Has relationships with 26 contractor.
- Announced 27 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 75 contractor selection plans with a total of 273 bidding packages, of which 32 prequalification documents have not found the investment project.
- Has invited bids for 49 packages (with 58 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 37 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 250 packages that have not fully posted the contractor selection results. Of these 242 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.33 contractors.
- Breakdown by bidding field: Goods 1.72%, Construction 44.83%, Consultancy 8.62%, Non-consultancy 0%, Mixed 44.83%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,089,388,081,000 VND, of which the total winning bid value is: 1,064,713,912,897 VND.
- The savings rate is: 2.26%.
Data analysis results of DauThau.info software for bid solicitors Project Management Board of Hue Monuments as follows:
- Has relationships with 26 contractor.
- The average number of contractors participating in each bidding package is: 1.33 contractors.
- Proportion of bidding fields: Goods 1.72%, Construction 44.83%, Consulting 8.62%, Non-consulting 0%, Mixed 44.83%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,089,388,081,000 VND, in which the total winning value is: 1,064,713,912,897 VND.
- The savings rate is: 2.26%.
This Bid solicitor is also an investor. The analysis results of data for the investor Project Management Board of Hue Monuments are as follows:
- Is the investor of 27 development investment projects.
- Is the investor of 32 contractor selection plans, of which 21 were self-published, and 11 were published by other entities.
- Is the investor of 29 Tender Notices, of which 26 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package 18 construction supervision of the investor Project Management Board of Hue Monuments.
- Winning bidder: CENTRAL SOUTH FIRE PROTECTION AND CONSTRUCTION LIMITED LIABILITY COMPANY
06/01/2026 16:50
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package 17: Supervision of construction and installation of equipment of the investor Project Management Board of Hue Monuments.
- Winning bidder: Ban Quản lý Dự án Di tích Cố đô Huế
06/01/2026 16:38
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package 17 of the entire construction of the investor Project Management Board of Hue Monuments.
- Winning bidder: HBT FIRE PREVENTION AND CONSTRUCTION INVESTMENT COMPANY LIMITED
06/01/2026 16:17
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package 14 Design of construction drawings and estimates of the investor Project Management Board of Hue Monuments.
- Winning bidder: Ban Tư vấn Bảo tồn Di Tích Huế
06/01/2026 15:13
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package No. 16: The entire construction and equipment of the investor Project Management Board of Hue Monuments.
- Winning bidder: HBT FIRE PREVENTION AND CONSTRUCTION INVESTMENT COMPANY LIMITED
06/01/2026 11:50
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package No. 13: Design of construction drawings and estimates of the investor Project Management Board of Hue Monuments.
- Winning bidder: Ban Tư vấn Bảo tồn Di Tích Huế
06/01/2026 11:36
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Bidding package No. 120: Construction supervision of the investor Project Management Board of Hue Monuments.
- Winning bidder: Ban Tư vấn Bảo tồn Di Tích Huế
06/01/2026 11:24
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package No. 117: Repair and embellish the embankment into the moat (outer side) from Tay Thanh Dai to Chanh Bac gate of the investor Project Management Board of Hue Monuments.
- Winning bidder: VINAREMON - THE CENTRAL RESTORATION OF MONUMENTS JOINT STOCK COMPANY
06/01/2026 11:18
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package No. 116: Renovating and embellishing the Upper Citadel, Elevation and Protective Embankment (inner side) from Tay Thanh Dai to Chanh Bac gate of the investor Project Management Board of Hue Monuments.
- Winning bidder: HANOI RESTORATION OF MONUMENTS AND CONSTRUCTION JOINT STOCK COMPANY
06/01/2026 11:08
Project Management Board of Hue Monuments publishes the plan Repairing and embellishing the upper citadel, ellipse and stone embankment, protective embankment and moat from the West Citadel to Chanh Bac gate under the component of renovating and embellishing relics of the project to Preserve, restore and embellish the Hue Imperial Citadel system with 10 bidding package .
31/12/2025 15:28
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Board of Hue Monuments announced the results of the bid package Package 18 construction supervision .
- Winning bidder: Ban Tư vấn Bảo tồn Di Tích Huế, CENTRAL SOUTH FIRE PROTECTION AND CONSTRUCTION LIMITED LIABILITY COMPANY
06/01/2026 16:50
Project Management Board of Hue Monuments announced the results of the bid package Package 17: Supervision of construction and installation of equipment .
- Winning bidder: Ban Quản lý Dự án Di tích Cố đô Huế
06/01/2026 16:38
Project Management Board of Hue Monuments announced the results of the bid package Package 17 of the entire construction .
- Winning bidder: CÔNG TY CỔ PHẦN TU BỔ DI TÍCH HUẾ, CÔNG TY TRÁCH NHIỆM HỮU HẠN THÀNH CÔNG LIGHTING, HBT FIRE PREVENTION AND CONSTRUCTION INVESTMENT COMPANY LIMITED
06/01/2026 16:17
Project Management Board of Hue Monuments announced the results of the bid package Package 14 Design of construction drawings and estimates .
- Winning bidder: Ban Tư vấn Bảo tồn Di Tích Huế
06/01/2026 15:13
Project Management Board of Hue Monuments announced the results of the bid package Package No. 16: The entire construction and equipment .
- Winning bidder: CÔNG TY CỔ PHẦN TU BỔ DI TÍCH HUẾ, VIET ANH INVESTMENT JOINT STOCK COMPANY, HBT FIRE PREVENTION AND CONSTRUCTION INVESTMENT COMPANY LIMITED
06/01/2026 11:50
Project Management Board of Hue Monuments announced the results of the bid package Package No. 13: Design of construction drawings and estimates .
- Winning bidder: Ban Tư vấn Bảo tồn Di Tích Huế
06/01/2026 11:36
Project Management Board of Hue Monuments announced the results of the bid package Bidding package No. 120: Construction supervision .
- Winning bidder: Ban Tư vấn Bảo tồn Di Tích Huế
06/01/2026 11:24
Project Management Board of Hue Monuments announced the results of the bid package Package No. 117: Repair and embellish the embankment into the moat (outer side) from Tay Thanh Dai to Chanh Bac gate .
- Winning bidder: VINAREMON - THE CENTRAL RESTORATION OF MONUMENTS JOINT STOCK COMPANY
06/01/2026 11:18
Project Management Board of Hue Monuments announced the results of the bid package Package No. 116: Renovating and embellishing the Upper Citadel, Elevation and Protective Embankment (inner side) from Tay Thanh Dai to Chanh Bac gate .
- Winning bidder: CÔNG TY CỔ PHẦN TU BỔ DI TÍCH HUẾ, HANOI RESTORATION OF MONUMENTS AND CONSTRUCTION JOINT STOCK COMPANY
06/01/2026 11:08
Project Management Board of Hue Monuments announced the results of the bid package Package No. 20 "Entire construction and installation" .
- Winning bidder: CÔNG TY CỔ PHẦN TU BỔ DI TÍCH HUẾ
31/12/2025 10:38
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package 18 construction supervision of the investor Project Management Board of Hue Monuments.
- Winning bidder: CENTRAL SOUTH FIRE PROTECTION AND CONSTRUCTION LIMITED LIABILITY COMPANY
06/01/2026 16:50
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package 17: Supervision of construction and installation of equipment of the investor Project Management Board of Hue Monuments.
- Winning bidder: Ban Quản lý Dự án Di tích Cố đô Huế
06/01/2026 16:38
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package 17 of the entire construction of the investor Project Management Board of Hue Monuments.
- Winning bidder: HBT FIRE PREVENTION AND CONSTRUCTION INVESTMENT COMPANY LIMITED
06/01/2026 16:17
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package 14 Design of construction drawings and estimates of the investor Project Management Board of Hue Monuments.
- Winning bidder: Ban Tư vấn Bảo tồn Di Tích Huế
06/01/2026 15:13
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package No. 16: The entire construction and equipment of the investor Project Management Board of Hue Monuments.
- Winning bidder: HBT FIRE PREVENTION AND CONSTRUCTION INVESTMENT COMPANY LIMITED
06/01/2026 11:50
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package No. 13: Design of construction drawings and estimates of the investor Project Management Board of Hue Monuments.
- Winning bidder: Ban Tư vấn Bảo tồn Di Tích Huế
06/01/2026 11:36
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Bidding package No. 120: Construction supervision of the investor Project Management Board of Hue Monuments.
- Winning bidder: Ban Tư vấn Bảo tồn Di Tích Huế
06/01/2026 11:24
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package No. 117: Repair and embellish the embankment into the moat (outer side) from Tay Thanh Dai to Chanh Bac gate of the investor Project Management Board of Hue Monuments.
- Winning bidder: VINAREMON - THE CENTRAL RESTORATION OF MONUMENTS JOINT STOCK COMPANY
06/01/2026 11:18
The Bid solicitor Project Management Board of Hue Monuments has posted the results of the bidding package Package No. 116: Renovating and embellishing the Upper Citadel, Elevation and Protective Embankment (inner side) from Tay Thanh Dai to Chanh Bac gate of the investor Project Management Board of Hue Monuments.
- Winning bidder: HANOI RESTORATION OF MONUMENTS AND CONSTRUCTION JOINT STOCK COMPANY
06/01/2026 11:08
Project Management Board of Hue Monuments publishes the plan Repairing and embellishing the upper citadel, ellipse and stone embankment, protective embankment and moat from the West Citadel to Chanh Bac gate under the component of renovating and embellishing relics of the project to Preserve, restore and embellish the Hue Imperial Citadel system with 10 bidding package .
31/12/2025 15:28
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project Management Board of Hue Monuments has posted 75 of the contractor selection plan, which contains 273 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project Management Board of Hue Monuments has posted 58 Tender Notices in 49 bidding packages. Among these, 15 Tender Notices were self-invited, and 43 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Board of Hue Monuments has posted 37 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 37 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project Management Board of Hue Monuments has a relationship with 26 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Board of Hue Monuments has a relationship with 15 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Project Management Board of Hue Monuments has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects