Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Project Management Unit 1 as follows:
- Has relationships with 9 project owners.
- Has relationships with 379 contractor.
- Announced 152 investment development project, of which 11 projects have not yet announced the prequalification documents.
- Announced 319 contractor selection plans with a total of 1535 bidding packages, of which 47 prequalification documents have not found the investment project.
- Has invited bids for 516 packages (with 563 tender notices), and conducted prequalification for 8 packages.
- There are 12 bidding packages with content that needs clarification.
- Announced the results of 1009 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 664 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 520 packages that have not fully posted the contractor selection results. Of these 508 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.67 contractors.
- Breakdown by bidding field: Goods 39.96%, Construction 39.25%, Consultancy 18.12%, Non-consultancy 0.36%, Mixed 2.31%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,948,447,370,517 VND, of which the total winning bid value is: 3,812,369,312,264 VND.
- The savings rate is: 3.45%.
Data analysis results of DauThau.info software for bid solicitors Project Management Unit 1 as follows:
- Has relationships with 379 contractor.
- The average number of contractors participating in each bidding package is: 1.67 contractors.
- Proportion of bidding fields: Goods 39.96%, Construction 39.25%, Consulting 18.12%, Non-consulting 0.36%, Mixed 2.31%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,948,447,370,517 VND, in which the total winning value is: 3,812,369,312,264 VND.
- The savings rate is: 3.45%.
This Bid solicitor is also an investor. The analysis results of data for the investor Project Management Unit 1 are as follows:
- Is the investor of 152 development investment projects.
- Is the investor of 303 contractor selection plans, of which 302 were self-published, and 1 were published by other entities.
- Is the investor of 391 Tender Notices, of which 382 were self-invited, and 9 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 10 bidding packages, of which 9 were won, 0 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 80% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.92% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Cần Thơ (5), Undefined (5)
- Provinces before the merger where the contractor has participated in bidding : Sóc Trăng (5), Undefined (5)
- Has relationships with 7 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 122 bidding packages with 15 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 08: Construction insurance of the investor Project Management Unit 1.
- Winning bidder: Agriculture Bank Insurance Joint Stock Corporation
24/09/2025 15:28
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 03: Construction supervision consultancy of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG SÔNG TIỀN
24/09/2025 09:34
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 06: Construction supervision of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
09/09/2025 14:20
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 12: Supply and installation of equipment of the investor Project Management Unit 1.
04/09/2025 13:16
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 11: Construction work of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TIẾN PHÁT 3979
03/09/2025 15:00
Project Management Unit 1 announced the results of the bid package Package 06: Construction work .
- Winning bidder: Liên Danh Xây Dựng Trường THPT Đoàn Văn Tố
27/08/2025 17:20
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 03: Advice on supervision of topographic survey (phase of design dossiers of implementation after basic design). of the investor Project Management Unit 1.
- Winning bidder: DUONG NHAN CONSTRUCTION COMPANY LIMITED
29/07/2025 09:14
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Bidding package 04: Design verification consultancy and construction estimate of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
29/07/2025 09:10
Project Management Unit 1 announced the results of the bid package Package No. 06: Advice on making bidding documents, evaluating bidding documents package 09. .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MTV XÂY DỰNG THƯƠNG MẠI VÀ DỊCH VỤ STD
28/07/2025 08:24
Project Management Unit 1 publishes the plan Adjust the contractor selection plan package 09: Construction and procurement, equipment installation at high school sites and related bidding packages with 4 bidding package .
28/07/2025 08:16
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Unit 1 announced the results of the bid package Package 08: Construction insurance .
- Winning bidder: Agriculture Bank Insurance Joint Stock Corporation
24/09/2025 15:28
Project Management Unit 1 announced the results of the bid package Package 03: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG SÔNG TIỀN
24/09/2025 09:34
Project Management Unit 1 announced the results of the bid package Package 06: Construction supervision .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
09/09/2025 14:20
Project Management Unit 1 announced the results of the bid package Package 12: Supply and installation of equipment .
- Winning bidder: VDI TECHNOLOGY JOINT STOCK COMPANY
04/09/2025 13:16
Project Management Unit 1 announced the results of the bid package Package No. 11: Construction work .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG PHÁT THUẬN THÀNH, CÔNG TY TNHH THỐNG NHẤT, CÔNG TY TNHH XÂY DỰNG TIẾN PHÁT 3979
03/09/2025 15:00
Project Management Unit 1 announced the results of the bid package Package No. 03: Advice on supervision of topographic survey (phase of design dossiers of implementation after basic design). .
- Winning bidder: DUONG NHAN CONSTRUCTION COMPANY LIMITED
29/07/2025 09:14
Project Management Unit 1 announced the results of the bid package Bidding package 04: Design verification consultancy and construction estimate .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
29/07/2025 09:10
Project Management Unit 1 announced the results of the bidding package Package 06: Construction supervision with 1 participating contractors .
18/07/2025 16:45
Project Management Unit 1 announced the results of the bidding package Tender package No 11: Construction work with 3 participating contractors .
18/07/2025 16:04
Project Management Unit 1 announced the results of the bidding package Package 12: Supply and installation of equipment with 2 participating contractors .
10/07/2025 10:33
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 08: Construction insurance of the investor Project Management Unit 1.
- Winning bidder: Agriculture Bank Insurance Joint Stock Corporation
24/09/2025 15:28
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 03: Construction supervision consultancy of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG SÔNG TIỀN
24/09/2025 09:34
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 06: Construction supervision of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
09/09/2025 14:20
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package 12: Supply and installation of equipment of the investor Project Management Unit 1.
04/09/2025 13:16
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 11: Construction work of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TIẾN PHÁT 3979
03/09/2025 15:00
Project Management Unit 1 announced the results of the bid package Package 06: Construction work .
- Winning bidder: Liên Danh Xây Dựng Trường THPT Đoàn Văn Tố
27/08/2025 17:20
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Package No. 03: Advice on supervision of topographic survey (phase of design dossiers of implementation after basic design). of the investor Project Management Unit 1.
- Winning bidder: DUONG NHAN CONSTRUCTION COMPANY LIMITED
29/07/2025 09:14
The Bid solicitor Project Management Unit 1 has posted the results of the bidding package Bidding package 04: Design verification consultancy and construction estimate of the investor Project Management Unit 1.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
29/07/2025 09:10
Project Management Unit 1 announced the results of the bid package Package No. 06: Advice on making bidding documents, evaluating bidding documents package 09. .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MTV XÂY DỰNG THƯƠNG MẠI VÀ DỊCH VỤ STD
28/07/2025 08:24
Project Management Unit 1 publishes the plan Adjust the contractor selection plan package 09: Construction and procurement, equipment installation at high school sites and related bidding packages with 4 bidding package .
28/07/2025 08:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project Management Unit 1 has posted 319 of the contractor selection plan, which contains 1535 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit 1 posted 8 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project Management Unit 1 has posted 563 Tender Notices in 516 bidding packages. Among these, 554 Tender Notices were self-invited, and 9 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit 1 has posted 1009 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1009 package, canceled the bid 0 package (among the bidding packages above).
- There are 664 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project Management Unit 1 has a relationship with 379 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit 1 has a relationship with 81 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Project Management Unit 1 has a relationship with 11 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects