Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Project Management Unit No 3 as follows:
- Has relationships with 5 project owners.
- Has relationships with 600 contractor.
- Announced 80 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 720 contractor selection plans with a total of 1359 bidding packages, of which 230 prequalification documents have not found the investment project.
- Has invited bids for 1035 packages (with 1208 tender notices), and conducted prequalification for 8 packages.
- There are 15 bidding packages with content that needs clarification.
- Announced the results of 1271 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 554 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 588 packages that have not fully posted the contractor selection results. Of these 573 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.76 contractors.
- Breakdown by bidding field: Goods 13.49%, Construction 53.23%, Consultancy 30.55%, Non-consultancy 2.15%, Mixed 0.33%, Other fields 0.25000000000001%.
- The total value according to the packages with valid contractor selection results is: 8,302,463,641,424 VND, of which the total winning bid value is: 7,753,092,534,414 VND.
- The savings rate is: 6.62%.
Data analysis results of DauThau.info software for bid solicitors Project Management Unit No 3 as follows:
- Has relationships with 600 contractor.
- The average number of contractors participating in each bidding package is: 1.76 contractors.
- Proportion of bidding fields: Goods 13.49%, Construction 53.23%, Consulting 30.55%, Non-consulting 2.15%, Mixed 0.33%, Other 0.25000000000001%.
- The total value according to the bidding package with valid IMP is: 8,302,463,641,424 VND, in which the total winning value is: 7,753,092,534,414 VND.
- The savings rate is: 6.62%.
This Bid solicitor is also an investor. The analysis results of data for the investor Project Management Unit No 3 are as follows:
- Is the investor of 80 development investment projects.
- Is the investor of 78 contractor selection plans, of which 78 were self-published, and 0 were published by other entities.
- Is the investor of 50 Tender Notices, of which 50 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 41 bidding packages, of which 41 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 49.44% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 84.96% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (40), Sơn La (1)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (40), Sơn La (1)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 37 bidding packages with 4 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package No. 01: Consulting, surveying, making economic and technical reports of the investor Project Management Unit No 3.
18/07/2024 10:38
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Periodic health check in 2024 for officials, employees, and employees of Project Management Board3 of the investor Project Management Unit No 3.
06/07/2024 11:23
Bid solicitor Project Management Unit No 3 has posted Tender Notice Periodic health check in 2024 for officials, employees, and employees of Project Management Board3 of the investor Project Management Unit No 3 with the form Competitive Offer.
09/06/2024 14:22
Bid solicitor Project Management Unit No 3 has posted Tender Notice Tender package No 01: Consulting, surveying, making economic and technical reports of the investor Project Management Unit No 3 with the form Open bidding.
08/06/2024 16:41
The Bid solicitor Project Management Unit No 3 has posted the request Regarding the approval of the contractor selection plan for investment preparation Project: Repairing damage to the road surface of Nam Dinh overpass branch, Km107+715, National Highway 10, Nam Dinh province of the investor Project Management Unit No 3 with 1 bidding package.
29/05/2024 14:23
Investor Project Management Unit No 3 has posted an investment and development project Repairing damage to the road surface of Nam Dinh overpass branch, Km107+715, National Highway 10, Nam Dinh province.
29/05/2024 14:14
The Bid solicitor Project Management Unit No 3 has posted the request Regarding the approval of the contractor selection plan Package: Periodic health examination in 2024 for officials, employees, and employees of Project Management Board3 of the investor Project Management Unit No 3 with 1 bidding package.
17/05/2024 16:44
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package 14: Auditing and settlement consulting of the investor Project Management Unit No 3.
02/05/2024 17:14
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Bidding package No. 1: Survey consulting, preparation of Technical Research Report of the investor Project Management Unit No 3.
01/03/2024 14:02
Bid solicitor Project Management Unit No 3 has posted Tender Notice Package 14: Auditing and settlement consulting of the investor Project Management Unit No 3 with the form Open bidding.
20/02/2024 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Unit No 3 announced the results of the bid package Package No. 3: Construction .
- Winning bidder: VAN XUAN CONSTRUCTION AND MATERIAL EQUIPMENT JOINT STOCK COMPANY, HUNG PHAT 68 CONSTRUCTION INVESTMENT SERVICES JOINT STOCK COMPANY
19/08/2025 16:40
Project Management Unit No 3 announced the results of the bid package Package 4: Construction supervision consultancy .
- Winning bidder: Trung tâm Kỹ thuật đường bộ 1
07/08/2025 18:37
Project Management Unit No 3 announced the results of the bid package Package No. 3: Construction .
- Winning bidder: XANH VIET INVESTMENT CONSTRUCTION JOINT STOCK COMPANY, THINH PHAT TRADING AND CONSTRUCTION OF WORKS INVESTMENT JOINT STOCK COMPANY
07/08/2025 18:35
Project Management Unit No 3 announced the results of the bid package Package No. 4: Construction Supervision Consultant .
- Winning bidder: TRANSPORT ENGINEERING DESIGN INCORPORATED NORTH JOINT STOCK COMPANY
06/08/2025 10:36
Project Management Unit No 3 announced the results of the bid package Package No. 4: Construction Supervision Consultant .
- Winning bidder: VNC CONSTRUCTION JOINT STOCK COMPANY
06/08/2025 10:27
Project Management Unit No 3 announced the results of the bid package Package No. 3: Construction .
- Winning bidder: CÔNG TY CP ĐẦU TƯ XÂY DỰNG AN ĐỨC MINH, CÔNG TY TNHH ĐẦU TƯ VÀ XÂY DỰNG BẮC MIỀN TRUNG, 236 TRAFFIC PROJECT CONSTRUCTION AND MANAGEMENT JOINT STOCK COMPANY
01/08/2025 10:01
Project Management Unit No 3 announced the results of the bid package Package No. 4: Construction Supervision Consultant .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HỒNG ĐỨC TỈNH ĐIỆN BIÊN
31/07/2025 16:47
Project Management Unit No 3 announced the results of the bid package Package 4: Construction supervision consultancy .
- Winning bidder: HIEP PHAT INVESTMENT CONSULTANCY, CONSTRUCTION AND TRADING JOINT STOCK COMPANY
29/07/2025 16:03
Project Management Unit No 3 announced the results of the bid package Package No. 4: Construction of paragraph Km190+00 - Km225+00 .
- Winning bidder: VHS TRADE AND CONSTRUCTION COMPANY LIMITED
29/07/2025 09:36
Project Management Unit No 3 announced the results of the bid package Package 4: Construction supervision consultancy .
- Winning bidder: HAI LONG WORKS CONSULTANT JOINT STOCK COMPANY
28/07/2025 17:57
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package No. 01: Consulting, surveying, making economic and technical reports of the investor Project Management Unit No 3.
18/07/2024 10:38
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Periodic health check in 2024 for officials, employees, and employees of Project Management Board3 of the investor Project Management Unit No 3.
06/07/2024 11:23
Bid solicitor Project Management Unit No 3 has posted Tender Notice Periodic health check in 2024 for officials, employees, and employees of Project Management Board3 of the investor Project Management Unit No 3 with the form Competitive Offer.
09/06/2024 14:22
Bid solicitor Project Management Unit No 3 has posted Tender Notice Tender package No 01: Consulting, surveying, making economic and technical reports of the investor Project Management Unit No 3 with the form Open bidding.
08/06/2024 16:41
The Bid solicitor Project Management Unit No 3 has posted the request Regarding the approval of the contractor selection plan for investment preparation Project: Repairing damage to the road surface of Nam Dinh overpass branch, Km107+715, National Highway 10, Nam Dinh province of the investor Project Management Unit No 3 with 1 bidding package.
29/05/2024 14:23
Investor Project Management Unit No 3 has posted an investment and development project Repairing damage to the road surface of Nam Dinh overpass branch, Km107+715, National Highway 10, Nam Dinh province.
29/05/2024 14:14
The Bid solicitor Project Management Unit No 3 has posted the request Regarding the approval of the contractor selection plan Package: Periodic health examination in 2024 for officials, employees, and employees of Project Management Board3 of the investor Project Management Unit No 3 with 1 bidding package.
17/05/2024 16:44
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Package 14: Auditing and settlement consulting of the investor Project Management Unit No 3.
02/05/2024 17:14
The Bid solicitor Project Management Unit No 3 has posted the results of the bidding package Bidding package No. 1: Survey consulting, preparation of Technical Research Report of the investor Project Management Unit No 3.
01/03/2024 14:02
Bid solicitor Project Management Unit No 3 has posted Tender Notice Package 14: Auditing and settlement consulting of the investor Project Management Unit No 3 with the form Open bidding.
20/02/2024 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project Management Unit No 3 has posted 720 of the contractor selection plan, which contains 1359 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit No 3 posted 8 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project Management Unit No 3 has posted 1208 Tender Notices in 1035 bidding packages. Among these, 406 Tender Notices were self-invited, and 802 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit No 3 has posted 1271 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1271 package, canceled the bid 0 package (among the bidding packages above).
- There are 554 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project Management Unit No 3 has a relationship with 600 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Unit No 3 has a relationship with 71 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Project Management Unit No 3 has a relationship with 8 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects