Data analysis results of DauThau.info software for bid solicitors Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên as follows:
- Has relationships with 39 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 48 contractor selection plans with a total of 77 bidding packages, of which 48 prequalification documents have not found the investment project.
- Has invited bids for 30 packages (with 33 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 53 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 26 packages with results that do not have tender notice or prequalification notice.
- There are 27 packages that have not fully posted the contractor selection results. Of these 25 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.80 contractors.
- Breakdown by bidding field: Goods 24.24%, Construction 6.06%, Consultancy 60.61%, Non-consultancy 9.09%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 24,920,358,815 VND, of which the total winning bid value is: 23,909,661,586 VND.
- The savings rate is: 4.06%.
Data analysis results of DauThau.info software for bid solicitors Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên as follows:
- Has relationships with 39 contractor.
- The average number of contractors participating in each bidding package is: 1.80 contractors.
- Proportion of bidding fields: Goods 24.24%, Construction 6.06%, Consulting 60.61%, Non-consulting 9.09%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 24,920,358,815 VND, in which the total winning value is: 23,909,661,586 VND.
- The savings rate is: 4.06%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 48 Contractor selection plan in which 48 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 33 bidding packages in which 32 packages are self-invited, and 1 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the request Print the 2025 propaganda calendar of the Forest Protection and Development Fund of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên with 1 bidding package.
24/10/2024 07:46
Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted Tender Notice Bidding Tender package No 03 - Audit Consulting for 2023 forest environmental services settlement report according to Decree No. 156/ND-CP and 2023 Financial Report according to Circular No. 107/TT-BTC of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên with the form Open bidding.
24/09/2024 14:26
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Bid package No. 03 - Communication products: Jackets, baseball caps of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
- Winning bidder: VOLED VIET NAM JOINT STOCK COMPANY
24/09/2024 09:23
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Muong Muon Hydropower Plant of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
- Winning bidder: South Coast and Plateau Institute of Forest In ventory and Planning
05/09/2024 16:59
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Propagating the work of payment for forest environmental services on Dien Bien Phu Newspaper in 2024 of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
- Winning bidder: Báo Điện Biên Phủ
29/08/2024 10:28
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Phi Linh Hydropower Plant of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
26/08/2024 16:41
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Nam Nua 2 Hydropower Plant of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
26/08/2024 16:25
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Muong Tung Hydropower Plant of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
26/08/2024 16:07
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Package 03 - Consulting on determining basin boundaries and forest area in the basin of De Bau hydropower plant of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
26/08/2024 15:33
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Bidding package No. 02 - Consulting on appraisal of bidding documents, appraisal of LCNT results of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
- Winning bidder: BMT TRADING AND SERVICES INVESTMENT CONSULTING JOINT STOCK COMPANY
26/08/2024 14:43
The data sheet has been partially hidden, to see the full information please Login or Register
Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên publishes the plan Print the 2025 propaganda calendar of the Forest Protection and Development Fund with 1 bidding package .
24/10/2024 07:46
Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên announced the results of the bidding package Bidding Tender package No 03 - Audit Consulting for 2023 forest environmental services settlement report according to Decree No. 156/ND-CP and 2023 Financial Report according to Circular No. 107/TT-BTC with 3 participating contractors .
12/10/2024 15:19
Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên publishes Tender Notice Bidding Tender package No 03 - Audit Consulting for 2023 forest environmental services settlement report according to Decree No. 156/ND-CP and 2023 Financial Report according to Circular No. 107/TT-BTC in the form Open bidding .
24/09/2024 14:26
Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên announced the results of the bid package Bid package No. 03 - Communication products: Jackets, baseball caps .
- Winning bidder: VOLED VIET NAM JOINT STOCK COMPANY
24/09/2024 09:23
Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên announced the results of the bid package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Muong Muon Hydropower Plant .
- Winning bidder: South Coast and Plateau Institute of Forest In ventory and Planning
05/09/2024 16:59
Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên announced the results of the bid package Propagating the work of payment for forest environmental services on Dien Bien Phu Newspaper in 2024 .
- Winning bidder: Báo Điện Biên Phủ
29/08/2024 10:28
Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên announced the results of the bid package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Phi Linh Hydropower Plant .
- Winning bidder: Trung tâm Quy hoạch và Thiết kế Nông, Lâm nghiệp tỉnh Điện Biên, CÔNG TY TNHH TƯ VẤN DỊCH VỤ ĐẤT ĐAI PHÚ HƯNG
26/08/2024 16:41
Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên announced the results of the bid package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Nam Nua 2 Hydropower Plant .
- Winning bidder: South Coast and Plateau Institute of Forest In ventory and Planning
26/08/2024 16:25
Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên announced the results of the bid package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Muong Tung Hydropower Plant .
- Winning bidder: South Coast and Plateau Institute of Forest In ventory and Planning
26/08/2024 16:07
Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên announced the results of the bid package Package 03 - Consulting on determining basin boundaries and forest area in the basin of De Bau hydropower plant .
- Winning bidder: Trung tâm Quy hoạch và Thiết kế Nông, Lâm nghiệp tỉnh Điện Biên, CÔNG TY TNHH TƯ VẤN DỊCH VỤ ĐẤT ĐAI PHÚ HƯNG
26/08/2024 15:33
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the request Print the 2025 propaganda calendar of the Forest Protection and Development Fund of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên with 1 bidding package.
24/10/2024 07:46
Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted Tender Notice Bidding Tender package No 03 - Audit Consulting for 2023 forest environmental services settlement report according to Decree No. 156/ND-CP and 2023 Financial Report according to Circular No. 107/TT-BTC of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên with the form Open bidding.
24/09/2024 14:26
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Bid package No. 03 - Communication products: Jackets, baseball caps of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
- Winning bidder: VOLED VIET NAM JOINT STOCK COMPANY
24/09/2024 09:23
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Muong Muon Hydropower Plant of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
- Winning bidder: South Coast and Plateau Institute of Forest In ventory and Planning
05/09/2024 16:59
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Propagating the work of payment for forest environmental services on Dien Bien Phu Newspaper in 2024 of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
- Winning bidder: Báo Điện Biên Phủ
29/08/2024 10:28
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Phi Linh Hydropower Plant of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
26/08/2024 16:41
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Nam Nua 2 Hydropower Plant of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
26/08/2024 16:25
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Package No. 03 - Consulting on determining basin boundaries and forest areas within the basin of Muong Tung Hydropower Plant of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
26/08/2024 16:07
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Package 03 - Consulting on determining basin boundaries and forest area in the basin of De Bau hydropower plant of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
26/08/2024 15:33
The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted the results of the bidding package Bidding package No. 02 - Consulting on appraisal of bidding documents, appraisal of LCNT results of the investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên.
- Winning bidder: BMT TRADING AND SERVICES INVESTMENT CONSULTING JOINT STOCK COMPANY
26/08/2024 14:43
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted 48 of the contractor selection plan, which contains 77 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted 33 Tender Notice in the 30 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has posted 53 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 53 package, canceled the bid 0 package (among the bidding packages above).
- There are 26 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has a relationship with 39 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên is the investor of 33 package, of which 32 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên is the owner of 48 contractor selection plan. In which, they self-invite 48 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Quỹ Bảo vệ và Phát triển rừng tỉnh Điện Biên is an investor with 40 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code