Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Quy Nhon University as follows:
- Has relationships with 2 project owners.
- Has relationships with 266 contractor.
- Announced 34 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 560 contractor selection plans with a total of 1016 bidding packages, of which 537 prequalification documents have not found the investment project.
- Has invited bids for 209 packages (with 222 tender notices), and conducted prequalification for 0 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 514 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 353 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 512 packages that have not fully posted the contractor selection results. Of these 498 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.73 contractors.
- Breakdown by bidding field: Goods 68.92%, Construction 12.61%, Consultancy 7.66%, Non-consultancy 10.81%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 279,213,354,070 VND, of which the total winning bid value is: 267,499,088,916 VND.
- The savings rate is: 4.20%.
Data analysis results of DauThau.info software for bid solicitors Quy Nhon University as follows:
- Has relationships with 266 contractor.
- The average number of contractors participating in each bidding package is: 1.73 contractors.
- Proportion of bidding fields: Goods 68.92%, Construction 12.61%, Consulting 7.66%, Non-consulting 10.81%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 279,213,354,070 VND, in which the total winning value is: 267,499,088,916 VND.
- The savings rate is: 4.20%.
This Bid solicitor is also an investor. The analysis results of data for the investor Quy Nhon University are as follows:
- Is the investor of 34 development investment projects.
- Is the investor of 651 contractor selection plans, of which 524 were self-published, and 127 were published by other entities.
- Is the investor of 205 Tender Notices, of which 193 were self-invited, and 12 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 5 bidding packages, of which 5 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 98.13% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.61% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Gia Lai (5)
- Provinces before the merger where the contractor has participated in bidding : Bình Định (1), Undefined (4)
- Has relationships with 1 Bid Solicitors
- Has relationships with 3 Bid Investors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Quy Nhon University publishes Tender Notice Tender package No 05: Consulting in making feasibility research reports in the form Open bidding .
26/08/2026 20:14
Quy Nhon University publishes the plan Plan for selecting a contractor for the investment preparation phase of the project: Investment in infrastructure for Quy Nhon University to enhance teacher training capacity in the Central Coast region. with 7 bidding package .
22/08/2026 16:13
Quy Nhon University announced the results of the bid package Procurement Package No. 04: Consulting and appraisal of bidding documents and results of the procurement package for consulting the preparation of a feasibility study report. .
- Winning bidder: TTG CONSTRUCTION CONSULTING JOINT STOCK COMPANY
20/08/2026 14:23
Quy Nhon University announced the results of the bid package Procurement Package No. 03: Consulting services for preparing and evaluating bids for the consulting service package, including preparing a feasibility study report. .
- Winning bidder: MINH NGHIA CONSTRUCTION AND SERVICE TRADING COMPANY LIMITED
20/08/2026 14:19
Quy Nhon University announced the results of the bid package Package 02: Consulting and monitoring survey .
- Winning bidder: MINH NGHIA CONSTRUCTION AND SERVICE TRADING COMPANY LIMITED
20/08/2026 14:16
Quy Nhon University announced the results of the bid package Bid No. 01: Consulting services for survey task development; Geological and topographical surveys .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN KIỂM ĐỊNH XÂY DỰNG C.Q.C
20/08/2026 14:12
Quy Nhon University announced the results of the bid package Procurement and installation of equipment .
- Winning bidder: I.P.L CORPORATION
20/08/2026 11:30
Quy Nhon University publishes the plan Solar panel system for houses A4 and A7 with 3 bidding package .
18/08/2026 14:28
Investor Quy Nhon University has posted an investment and development project Solar panel system for houses A4 and A7.
18/08/2026 14:14
Quy Nhon University announced the results of the bid package Purchase of electrical equipment, water supply, and materials for repairing facilities used for training. .
- Winning bidder: HỘ KINH DOANH CỬA HÀNG THƯƠNG MẠI TỔNG HỢP TIẾN PHÁT
14/08/2026 15:03
The data sheet has been partially hidden, to see the full information please Login or Register
Quy Nhon University announced the results of the bid package Procurement and installation of equipment .
- Winning bidder: CÔNG TY CỔ PHẦN GIẢI PHÁP ONLINE 247
06/07/2026 14:00
Quy Nhon University announced the results of the bid package Organize officials and workers to study and visit in 2026 .
- Winning bidder: VIETRAVEL TOURISM JOINT STOCK COMPANY
01/06/2026 17:05
Quy Nhon University publishes the plan Make a bachelor's shirt for graduation ceremony with 1 bidding package .
19/08/2025 14:55
Quy Nhon University announced the results of the bid package Procurement of research information management software .
- Winning bidder: Pyramid software and consulting company limited
13/08/2025 13:55
Quy Nhon University announced the results of the bid package Procurement and installation of equipment .
- Winning bidder: VICTORY TECHNOLOGY COMPANY LIMITED
06/08/2025 08:30
Quy Nhon University announced the results of the bid package Procurement and installation of equipment .
- Winning bidder: WI-MESH TECHNOLOGY CORPORATION
31/07/2025 11:23
Quy Nhon University publishes the plan Equipped with labor protection vehicles in 2025 with 1 bidding package .
25/07/2025 09:58
Quy Nhon University announced the results of the bid package Buy raw materials .
- Winning bidder: TBR TECHNOLOGY CORPORATION, DOANH TIN CHEMICAL JOINT STOCK COMPANY
24/07/2025 15:36
Quy Nhon University announced the results of the bid package Project management .
- Winning bidder: Công ty TNHH Tư Vấn Thiết Kế Và Xây Dựng Minh Phước
22/07/2025 16:28
Quy Nhon University announced the results of the bid package Supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ - XÂY DỰNG BÌNH PHÚ
18/07/2025 17:01
The data sheet has been partially hidden, to see the full information please Login or Register
Quy Nhon University publishes Tender Notice Tender package No 05: Consulting in making feasibility research reports in the form Open bidding .
26/08/2026 20:14
Quy Nhon University publishes the plan Plan for selecting a contractor for the investment preparation phase of the project: Investment in infrastructure for Quy Nhon University to enhance teacher training capacity in the Central Coast region. with 7 bidding package .
22/08/2026 16:13
Quy Nhon University announced the results of the bid package Procurement Package No. 04: Consulting and appraisal of bidding documents and results of the procurement package for consulting the preparation of a feasibility study report. .
- Winning bidder: TTG CONSTRUCTION CONSULTING JOINT STOCK COMPANY
20/08/2026 14:23
Quy Nhon University announced the results of the bid package Procurement Package No. 03: Consulting services for preparing and evaluating bids for the consulting service package, including preparing a feasibility study report. .
- Winning bidder: MINH NGHIA CONSTRUCTION AND SERVICE TRADING COMPANY LIMITED
20/08/2026 14:19
Quy Nhon University announced the results of the bid package Package 02: Consulting and monitoring survey .
- Winning bidder: MINH NGHIA CONSTRUCTION AND SERVICE TRADING COMPANY LIMITED
20/08/2026 14:16
Quy Nhon University announced the results of the bid package Bid No. 01: Consulting services for survey task development; Geological and topographical surveys .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN KIỂM ĐỊNH XÂY DỰNG C.Q.C
20/08/2026 14:12
Quy Nhon University announced the results of the bid package Procurement and installation of equipment .
- Winning bidder: I.P.L CORPORATION
20/08/2026 11:30
Quy Nhon University publishes the plan Solar panel system for houses A4 and A7 with 3 bidding package .
18/08/2026 14:28
Investor Quy Nhon University has posted an investment and development project Solar panel system for houses A4 and A7.
18/08/2026 14:14
Quy Nhon University announced the results of the bid package Purchase of electrical equipment, water supply, and materials for repairing facilities used for training. .
- Winning bidder: HỘ KINH DOANH CỬA HÀNG THƯƠNG MẠI TỔNG HỢP TIẾN PHÁT
14/08/2026 15:03
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Quy Nhon University has posted 560 of the contractor selection plan, which contains 1016 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Quy Nhon University has posted 222 Tender Notices in 209 bidding packages. Among these, 171 Tender Notices were self-invited, and 51 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Quy Nhon University has posted 514 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 514 package, canceled the bid 0 package (among the bidding packages above).
- There are 353 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Quy Nhon University has a relationship with 266 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Quy Nhon University has a relationship with 71 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Quy Nhon University has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects