Data analysis results of DauThau.info software for bid solicitors Sở Giao thông vận tải Hà Tĩnh as follows:
- Has relationships with 2 project owners.
- Has relationships with 78 contractor.
- Announced 50 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 186 contractor selection plans with a total of 293 bidding packages, of which 101 prequalification documents have not found the investment project.
- Has invited bids for 154 packages (with 243 tender notices), and conducted prequalification for 0 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 144 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 127 packages that have not fully posted the contractor selection results. Of these 116 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.22 contractors.
- Breakdown by bidding field: Goods 4.12%, Construction 64.61%, Consultancy 18.93%, Non-consultancy 12.35%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 843,732,108,067 VND, of which the total winning bid value is: 823,010,503,850 VND.
- The savings rate is: 2.46%.
Data analysis results of DauThau.info software for bid solicitors Sở Giao thông vận tải Hà Tĩnh as follows:
- Has relationships with 78 contractor.
- The average number of contractors participating in each bidding package is: 1.22 contractors.
- Proportion of bidding fields: Goods 4.12%, Construction 64.61%, Consulting 18.93%, Non-consulting 12.35%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 843,732,108,067 VND, in which the total winning value is: 823,010,503,850 VND.
- The savings rate is: 2.46%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Giao thông vận tải Hà Tĩnh are as follows:
- Is the investor of 50 development investment projects.
- Is the investor of 196 contractor selection plans, of which 144 were self-published, and 52 were published by other entities.
- Is the investor of 237 Tender Notices, of which 220 were self-invited, and 17 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the request The project of repairing the background damage, the road surface of Km47+500 ÷ km48+400, km49+400 ÷ km50+050, km52+00 ÷ km52+150 (t), km52+390 ÷ km52+490, km52+540 ÷ km52+640. Supplementing drainage ditches Km48+450 ÷ km48+600 (p), km49+250 ÷ km49+350 (p), km49+250 ÷ km49+400 (t), km49+570 ÷ km50+080 (t), km49+570 ÷ km50+070 (p), km50+100 ÷ km50+450 (t), km50+100 ÷ km51+km52+km52 ÷ Km53+00 (T+P), Highway 8C, Ha Tinh Province of the investor Sở Giao thông vận tải Hà Tĩnh with 3 bidding package.
28/02/2025 16:40
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the request Project of repairing road surface and drainage ditches Km407+600 ÷ km410+400 and repairing the expansion slots: Tung Toad Km385+484; Dong Dang Km397+500; Insert Rén Km399+627; Slot km399+798; Cake of KM400+073; Trees km401+012; Grapefruit tree Km402+858, Highway 15, Ha Tinh Province of the investor Sở Giao thông vận tải Hà Tĩnh with 3 bidding package.
20/02/2025 08:29
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the request Project of repairing road surface and drainage ditches Km407+600 ÷ km410+400 and repairing the expansion slots: Tung Toad Km385+484; Dong Dang Km397+500; Insert Rén Km399+627; Slot km399+798; Cake of KM400+073; Trees km401+012; Grapefruit tree Km402+858, Highway 15, Ha Tinh Province of the investor Sở Giao thông vận tải Hà Tĩnh with 3 bidding package.
20/02/2025 08:27
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Repair damaged road surface and complete traffic safety system in section Km1+800 - Km2+080; Km22+580 - Km24+00; Km24+900 - Km26; Km44+950 - Km45+150; Km48+00 - Km48+200 and Repairing expansion joints of Thach Son bridge; repairing bridge piers and girders at Cua Nhuong bridge, National Highway 15B, Ha Tinh province of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: Road Engineering Center
08/01/2025 08:56
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Consulting survey, design construction drawings - cost estimates of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: ROAD TECHNICA CENTRE No.2
08/01/2025 08:54
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Construction supervision of XDCT of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: 479 CONSULTANCY AND CONSTRUCTION JOINT STOCK COMPANY
08/01/2025 08:51
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Civil Works of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: NGOC MINH - UDIC TRADING AND CONSTRUCTION JOINT STOCK COMPANY
07/01/2025 16:44
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Management and maintenance of national inland waterways (routes) under the management of Ha Tinh Department of Transport - 2025 of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: HA TINH MANAGEMENT AND CONSTRUCTION TRAFFIC WORKS JOINT STOCK COMPANY
19/12/2024 16:11
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Inspecting the current status of Cho Bong suspension bridge, Huong Dai bridge Km28+300/DT.552, Khe Tac bridge Km11+480/DT.554 and Ong Ngu bridge Km95+840/DT.554 of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
11/12/2024 16:06
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Construction supervision of XDCT of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: 479 CONSULTANCY AND CONSTRUCTION JOINT STOCK COMPANY
06/12/2024 09:38
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Giao thông vận tải Hà Tĩnh publishes the plan The project of repairing the background damage, the road surface of Km47+500 ÷ km48+400, km49+400 ÷ km50+050, km52+00 ÷ km52+150 (t), km52+390 ÷ km52+490, km52+540 ÷ km52+640. Supplementing drainage ditches Km48+450 ÷ km48+600 (p), km49+250 ÷ km49+350 (p), km49+250 ÷ km49+400 (t), km49+570 ÷ km50+080 (t), km49+570 ÷ km50+070 (p), km50+100 ÷ km50+450 (t), km50+100 ÷ km51+km52+km52 ÷ Km53+00 (T+P), Highway 8C, Ha Tinh Province with 3 bidding package .
28/02/2025 16:40
Sở Giao thông vận tải Hà Tĩnh publishes the plan Project of repairing road surface and drainage ditches Km407+600 ÷ km410+400 and repairing the expansion slots: Tung Toad Km385+484; Dong Dang Km397+500; Insert Rén Km399+627; Slot km399+798; Cake of KM400+073; Trees km401+012; Grapefruit tree Km402+858, Highway 15, Ha Tinh Province with 3 bidding package .
20/02/2025 08:29
Sở Giao thông vận tải Hà Tĩnh publishes the plan Project of repairing road surface and drainage ditches Km407+600 ÷ km410+400 and repairing the expansion slots: Tung Toad Km385+484; Dong Dang Km397+500; Insert Rén Km399+627; Slot km399+798; Cake of KM400+073; Trees km401+012; Grapefruit tree Km402+858, Highway 15, Ha Tinh Province with 3 bidding package .
20/02/2025 08:27
Sở Giao thông vận tải Hà Tĩnh announced the results of the bid package Repair damaged road surface and complete traffic safety system in section Km1+800 - Km2+080; Km22+580 - Km24+00; Km24+900 - Km26; Km44+950 - Km45+150; Km48+00 - Km48+200 and Repairing expansion joints of Thach Son bridge; repairing bridge piers and girders at Cua Nhuong bridge, National Highway 15B, Ha Tinh province .
- Winning bidder: Road Engineering Center
08/01/2025 08:56
Sở Giao thông vận tải Hà Tĩnh announced the results of the bid package Consulting survey, design construction drawings - cost estimates .
- Winning bidder: ROAD TECHNICA CENTRE No.2
08/01/2025 08:54
Sở Giao thông vận tải Hà Tĩnh announced the results of the bid package Construction supervision of XDCT .
- Winning bidder: 479 CONSULTANCY AND CONSTRUCTION JOINT STOCK COMPANY
08/01/2025 08:51
Sở Giao thông vận tải Hà Tĩnh announced the results of the bid package Civil Works .
- Winning bidder: NGOC MINH - UDIC TRADING AND CONSTRUCTION JOINT STOCK COMPANY
07/01/2025 16:44
Sở Giao thông vận tải Hà Tĩnh announced the results of the bid package Management and maintenance of national inland waterways (routes) under the management of Ha Tinh Department of Transport - 2025 .
- Winning bidder: HA TINH MANAGEMENT AND CONSTRUCTION TRAFFIC WORKS JOINT STOCK COMPANY
19/12/2024 16:11
Sở Giao thông vận tải Hà Tĩnh announced the results of the bidding package Consulting, surveying, designing BVTC and costing with 1 participating contractors .
17/12/2024 08:51
Sở Giao thông vận tải Hà Tĩnh announced the results of the bidding package Repair damaged road surface and complete traffic safety system in section Km1+800 - Km2+080; Km22+580 - Km24+00; Km24+900 - Km26; Km44+950 - Km45+150; Km48+00 - Km48+200 and Repairing expansion joints of Thach Son bridge; repairing bridge piers and girders at Cua Nhuong bridge, National Highway 15B, Ha Tinh province with 1 participating contractors .
17/12/2024 08:45
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the request The project of repairing the background damage, the road surface of Km47+500 ÷ km48+400, km49+400 ÷ km50+050, km52+00 ÷ km52+150 (t), km52+390 ÷ km52+490, km52+540 ÷ km52+640. Supplementing drainage ditches Km48+450 ÷ km48+600 (p), km49+250 ÷ km49+350 (p), km49+250 ÷ km49+400 (t), km49+570 ÷ km50+080 (t), km49+570 ÷ km50+070 (p), km50+100 ÷ km50+450 (t), km50+100 ÷ km51+km52+km52 ÷ Km53+00 (T+P), Highway 8C, Ha Tinh Province of the investor Sở Giao thông vận tải Hà Tĩnh with 3 bidding package.
28/02/2025 16:40
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the request Project of repairing road surface and drainage ditches Km407+600 ÷ km410+400 and repairing the expansion slots: Tung Toad Km385+484; Dong Dang Km397+500; Insert Rén Km399+627; Slot km399+798; Cake of KM400+073; Trees km401+012; Grapefruit tree Km402+858, Highway 15, Ha Tinh Province of the investor Sở Giao thông vận tải Hà Tĩnh with 3 bidding package.
20/02/2025 08:29
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the request Project of repairing road surface and drainage ditches Km407+600 ÷ km410+400 and repairing the expansion slots: Tung Toad Km385+484; Dong Dang Km397+500; Insert Rén Km399+627; Slot km399+798; Cake of KM400+073; Trees km401+012; Grapefruit tree Km402+858, Highway 15, Ha Tinh Province of the investor Sở Giao thông vận tải Hà Tĩnh with 3 bidding package.
20/02/2025 08:27
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Repair damaged road surface and complete traffic safety system in section Km1+800 - Km2+080; Km22+580 - Km24+00; Km24+900 - Km26; Km44+950 - Km45+150; Km48+00 - Km48+200 and Repairing expansion joints of Thach Son bridge; repairing bridge piers and girders at Cua Nhuong bridge, National Highway 15B, Ha Tinh province of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: Road Engineering Center
08/01/2025 08:56
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Consulting survey, design construction drawings - cost estimates of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: ROAD TECHNICA CENTRE No.2
08/01/2025 08:54
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Construction supervision of XDCT of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: 479 CONSULTANCY AND CONSTRUCTION JOINT STOCK COMPANY
08/01/2025 08:51
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Civil Works of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: NGOC MINH - UDIC TRADING AND CONSTRUCTION JOINT STOCK COMPANY
07/01/2025 16:44
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Management and maintenance of national inland waterways (routes) under the management of Ha Tinh Department of Transport - 2025 of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: HA TINH MANAGEMENT AND CONSTRUCTION TRAFFIC WORKS JOINT STOCK COMPANY
19/12/2024 16:11
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Inspecting the current status of Cho Bong suspension bridge, Huong Dai bridge Km28+300/DT.552, Khe Tac bridge Km11+480/DT.554 and Ong Ngu bridge Km95+840/DT.554 of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
11/12/2024 16:06
The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted the results of the bidding package Construction supervision of XDCT of the investor Sở Giao thông vận tải Hà Tĩnh.
- Winning bidder: 479 CONSULTANCY AND CONSTRUCTION JOINT STOCK COMPANY
06/12/2024 09:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Giao thông vận tải Hà Tĩnh has posted 186 of the contractor selection plan, which contains 293 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted 243 Tender Notices in 154 bidding packages. Among these, 220 Tender Notices were self-invited, and 23 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has posted 144 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 144 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has a relationship with 78 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Giao thông vận tải Hà Tĩnh has a relationship with 44 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Giao thông vận tải Hà Tĩnh has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects