Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Sở Giao thông Vận Tải Lào Cai as follows:
- Has relationships with 3 project owners.
- Has relationships with 3 contractor.
- Announced 8 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 16 contractor selection plans with a total of 42 bidding packages, of which 11 prequalification documents have not found the investment project.
- Has invited bids for 10 packages (with 10 tender notices), and conducted prequalification for 1 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 42 packages that have not fully posted the contractor selection results. Of these 41 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 10.00%, Construction 70.00%, Consultancy 20.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 15,986,451,000 VND, of which the total winning bid value is: 15,946,477,000 VND.
- The savings rate is: 0.25%.
Data analysis results of DauThau.info software for bid solicitors Sở Giao thông Vận Tải Lào Cai as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 10.00%, Construction 70.00%, Consulting 20.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 15,986,451,000 VND, in which the total winning value is: 15,946,477,000 VND.
- The savings rate is: 0.25%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Giao thông Vận Tải Lào Cai are as follows:
- Is the investor of 8 development investment projects.
- Is the investor of 49 contractor selection plans, of which 14 were self-published, and 35 were published by other entities.
- Is the investor of 10 Tender Notices, of which 2 were self-invited, and 8 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted Tender Notice Audit consulting of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
06/08/2019 10:33
Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted Tender Notice Audit consulting of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
06/08/2019 09:48
Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted Tender Notice Package 3: Audit consulting of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
07/03/2019 08:48
Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted Tender Notice Construction audit of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
25/02/2019 09:09
Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted Tender Notice Civil Works of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
23/08/2018 09:24
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted the request Approval of construction drawing design and project contractor selection plan: Thoroughly handle rubber, potholes, warping compensation and reinforced carpet with 1 layer of asphalt concrete, section Km89 - Km104, National Highway 4D, Laos province Quit of the investor Sở Giao thông Vận Tải Lào Cai with 3 bidding package.
31/07/2018 14:54
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Construction contractor selection plan: Unexpected repair of Khe Lech bridge at Km101+258/QL.279, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 1 bidding package.
11/07/2018 15:46
Investor Sở Giao thông Vận Tải Lào Cai has posted an investment and development project Unexpected repair of Khe Lec bridge at Km101+258/QL.279, Lao Cai province.
11/07/2018 15:15
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Inspection of Vang Mung, Nam Con, Nam Xay and Nam Mu bridges National Highway 279, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 1 bidding package.
10/07/2018 09:28
Investor Sở Giao thông Vận Tải Lào Cai has posted an investment and development project Inspection of Vang Mung, Nam Con, Nam Xay and Nam Mu bridges National Highway 279, Lao Cai province.
10/07/2018 09:09
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Giao thông Vận Tải Lào Cai publishes the plan Construction contractor selection plan: Unexpected repair of Khe Lech bridge at Km101+258/QL.279, Lao Cai province with 1 bidding package .
11/07/2018 15:46
Sở Giao thông Vận Tải Lào Cai publishes the plan Inspection of Vang Mung, Nam Con, Nam Xay and Nam Mu bridges National Highway 279, Lao Cai province with 1 bidding package .
10/07/2018 09:28
Sở Giao thông Vận Tải Lào Cai publishes the plan Adjusting and supplementing the list of repairing damaged road surface and drainage system section Km105-Km106 into the project Repairing damaged pavement Km106-Km109+800, National Highway 4D, Lao Cai province with 1 bidding package .
09/07/2018 14:14
Sở Giao thông Vận Tải Lào Cai publishes Tender Notice Civil Works in the form National competitive bidding .
09/07/2018 10:55
Sở Giao thông Vận Tải Lào Cai publishes the plan Construction contractor selection plan: Repairing the road surface section Km190-Km194, National Highway 4, Lao Cai province with 3 bidding package .
09/07/2018 10:50
Sở Giao thông Vận Tải Lào Cai publishes the plan Construction contractor selection plan: Repairing the road surface section Km190-Km194, National Highway 4, Lao Cai province with 3 bidding package .
09/07/2018 10:28
Sở Giao thông Vận Tải Lào Cai publishes Tender Notice Regular management and maintenance of bridges and roads in 2017 - 2020: DT.154, TEL.157, DT.161, Road 4E, Giang Dong Bridge, Pho Moi Bridge in the form Open bidding (Only select domestic contractors) .
27/09/2017 17:23
Sở Giao thông Vận Tải Lào Cai publishes Tender Notice Regular management and maintenance of bridges and roads in 2017 - 2020: DT.158, DT.155, DT.156, DT.156B in the form Open bidding (Only select domestic contractors) .
27/09/2017 17:19
Sở Giao thông Vận Tải Lào Cai publishes Tender Notice Regular management and maintenance of bridges and roads in 1017 - 2020: Tel.153, Tel.159, Tel.160 in the form Open bidding (Only select domestic contractors) .
27/09/2017 17:09
Sở Giao thông Vận Tải Lào Cai publishes Tender Notice Regular management and maintenance of bridges and roads in 2017 - 2020: Tel.151, Tel.151B, Tel.151C, Tel.152, Tel.152B in the form Open bidding (Only select domestic contractors) .
27/09/2017 17:01
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted Tender Notice Audit consulting of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
06/08/2019 10:33
Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted Tender Notice Audit consulting of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
06/08/2019 09:48
Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted Tender Notice Package 3: Audit consulting of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
07/03/2019 08:48
Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted Tender Notice Construction audit of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
25/02/2019 09:09
Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted Tender Notice Civil Works of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
23/08/2018 09:24
The Bid solicitor Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Lào Cai has posted the request Approval of construction drawing design and project contractor selection plan: Thoroughly handle rubber, potholes, warping compensation and reinforced carpet with 1 layer of asphalt concrete, section Km89 - Km104, National Highway 4D, Laos province Quit of the investor Sở Giao thông Vận Tải Lào Cai with 3 bidding package.
31/07/2018 14:54
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Construction contractor selection plan: Unexpected repair of Khe Lech bridge at Km101+258/QL.279, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 1 bidding package.
11/07/2018 15:46
Investor Sở Giao thông Vận Tải Lào Cai has posted an investment and development project Unexpected repair of Khe Lec bridge at Km101+258/QL.279, Lao Cai province.
11/07/2018 15:15
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Inspection of Vang Mung, Nam Con, Nam Xay and Nam Mu bridges National Highway 279, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 1 bidding package.
10/07/2018 09:28
Investor Sở Giao thông Vận Tải Lào Cai has posted an investment and development project Inspection of Vang Mung, Nam Con, Nam Xay and Nam Mu bridges National Highway 279, Lao Cai province.
10/07/2018 09:09
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Giao thông Vận Tải Lào Cai has posted 16 of the contractor selection plan, which contains 42 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Giao thông Vận Tải Lào Cai posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted 10 Tender Notices in 10 bidding packages. Among these, 2 Tender Notices were self-invited, and 8 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Giao thông Vận Tải Lào Cai has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Giao thông Vận Tải Lào Cai has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects