Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Sở Giao thông Vận Tải Lào Cai as follows:
- Has relationships with 3 contractor.
- Announced 9 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 16 contractor selection plans with a total of 42 bidding packages, of which 11 prequalification documents have not found the investment project.
- Has invited bids for 10 packages (with 10 tender notices), and conducted prequalification for 1 packages.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 42 packages that have not fully posted the contractor selection results. Of these 41 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 10.00%, Construction 70.00%, Consultancy 20.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 15,986,451,000 VND, of which the total winning bid value is: 15,946,477,000 VND.
- The savings rate is: 0.25%.
Data analysis results of DauThau.info software for bid solicitors Sở Giao thông Vận Tải Lào Cai as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 10.00%, Construction 70.00%, Consulting 20.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 15,986,451,000 VND, in which the total winning value is: 15,946,477,000 VND.
- The savings rate is: 0.25%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 9 investment and development projects.
- As the owner of 49 Contractor selection plan in which 14 Contractor selection plan is self-published, and 35 Contractor selection plan is posted by other units.
- Being the investor of 9 bidding packages in which 1 packages are self-invited, and 8 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Construction contractor selection plan: Unexpected repair of Khe Lech bridge at Km101+258/QL.279, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 1 bidding package.
11/07/2018 15:46
Sở Giao thông Vận Tải Lào Cai Posted Development Investment Project Unexpected repair of Khe Lec bridge at Km101+258/QL.279, Lao Cai province.
11/07/2018 15:15
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Inspection of Vang Mung, Nam Con, Nam Xay and Nam Mu bridges National Highway 279, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 1 bidding package.
10/07/2018 09:28
Sở Giao thông Vận Tải Lào Cai Posted Development Investment Project Inspection of Vang Mung, Nam Con, Nam Xay and Nam Mu bridges National Highway 279, Lao Cai province.
10/07/2018 09:09
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Adjusting and supplementing the list of repairing damaged road surface and drainage system section Km105-Km106 into the project Repairing damaged pavement Km106-Km109+800, National Highway 4D, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 1 bidding package.
09/07/2018 14:14
Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted Tender Notice Civil Works of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
09/07/2018 10:55
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Construction contractor selection plan: Repairing the road surface section Km190-Km194, National Highway 4, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 3 bidding package.
09/07/2018 10:50
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Construction contractor selection plan: Repairing the road surface section Km190-Km194, National Highway 4, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 3 bidding package.
09/07/2018 10:28
Sở Giao thông Vận Tải Lào Cai Posted Development Investment Project Repairing road surface section Km190 - Km194, National Highway 4, Lao Cai province.
09/07/2018 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Giao thông Vận Tải Lào Cai publishes the plan Construction contractor selection plan: Unexpected repair of Khe Lech bridge at Km101+258/QL.279, Lao Cai province with 1 bidding package .
11/07/2018 15:46
Sở Giao thông Vận Tải Lào Cai publishes the plan Inspection of Vang Mung, Nam Con, Nam Xay and Nam Mu bridges National Highway 279, Lao Cai province with 1 bidding package .
10/07/2018 09:28
Sở Giao thông Vận Tải Lào Cai publishes the plan Adjusting and supplementing the list of repairing damaged road surface and drainage system section Km105-Km106 into the project Repairing damaged pavement Km106-Km109+800, National Highway 4D, Lao Cai province with 1 bidding package .
09/07/2018 14:14
Sở Giao thông Vận Tải Lào Cai publishes Tender Notice Civil Works in the form National competitive bidding .
09/07/2018 10:55
Sở Giao thông Vận Tải Lào Cai publishes the plan Construction contractor selection plan: Repairing the road surface section Km190-Km194, National Highway 4, Lao Cai province with 3 bidding package .
09/07/2018 10:50
Sở Giao thông Vận Tải Lào Cai publishes the plan Construction contractor selection plan: Repairing the road surface section Km190-Km194, National Highway 4, Lao Cai province with 3 bidding package .
09/07/2018 10:28
Sở Giao thông Vận Tải Lào Cai publishes Tender Notice Regular management and maintenance of bridges and roads in 2017 - 2020: DT.154, TEL.157, DT.161, Road 4E, Giang Dong Bridge, Pho Moi Bridge in the form Open bidding (Only select domestic contractors) .
27/09/2017 17:23
Sở Giao thông Vận Tải Lào Cai publishes Tender Notice Regular management and maintenance of bridges and roads in 2017 - 2020: DT.158, DT.155, DT.156, DT.156B in the form Open bidding (Only select domestic contractors) .
27/09/2017 17:19
Sở Giao thông Vận Tải Lào Cai publishes Tender Notice Regular management and maintenance of bridges and roads in 1017 - 2020: Tel.153, Tel.159, Tel.160 in the form Open bidding (Only select domestic contractors) .
27/09/2017 17:09
Sở Giao thông Vận Tải Lào Cai publishes Tender Notice Regular management and maintenance of bridges and roads in 2017 - 2020: Tel.151, Tel.151B, Tel.151C, Tel.152, Tel.152B in the form Open bidding (Only select domestic contractors) .
27/09/2017 17:01
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Construction contractor selection plan: Unexpected repair of Khe Lech bridge at Km101+258/QL.279, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 1 bidding package.
11/07/2018 15:46
Sở Giao thông Vận Tải Lào Cai Posted Development Investment Project Unexpected repair of Khe Lec bridge at Km101+258/QL.279, Lao Cai province.
11/07/2018 15:15
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Inspection of Vang Mung, Nam Con, Nam Xay and Nam Mu bridges National Highway 279, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 1 bidding package.
10/07/2018 09:28
Sở Giao thông Vận Tải Lào Cai Posted Development Investment Project Inspection of Vang Mung, Nam Con, Nam Xay and Nam Mu bridges National Highway 279, Lao Cai province.
10/07/2018 09:09
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Adjusting and supplementing the list of repairing damaged road surface and drainage system section Km105-Km106 into the project Repairing damaged pavement Km106-Km109+800, National Highway 4D, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 1 bidding package.
09/07/2018 14:14
Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted Tender Notice Civil Works of the investor Sở Giao thông Vận Tải Lào Cai with the form National competitive bidding.
09/07/2018 10:55
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Construction contractor selection plan: Repairing the road surface section Km190-Km194, National Highway 4, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 3 bidding package.
09/07/2018 10:50
The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted the request Construction contractor selection plan: Repairing the road surface section Km190-Km194, National Highway 4, Lao Cai province of the investor Sở Giao thông Vận Tải Lào Cai with 3 bidding package.
09/07/2018 10:28
Sở Giao thông Vận Tải Lào Cai Posted Development Investment Project Repairing road surface section Km190 - Km194, National Highway 4, Lao Cai province.
09/07/2018 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Giao thông Vận Tải Lào Cai has posted 16 of the contractor selection plan, which contains 42 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Giao thông Vận Tải Lào Cai posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted 10 Tender Notice in the 10 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Giao thông Vận Tải Lào Cai has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Giao thông Vận Tải Lào Cai has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Giao thông Vận Tải Lào Cai has a relationship with 4 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Giao thông Vận Tải Lào Cai is the investor of 9 package, of which 1 package is self-invited, other units invite bid 8 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Giao thông Vận Tải Lào Cai is the owner of 49 contractor selection plan. In which, they self-invite 14 of contractor selection plan, other units invite bids of 35 of contractor selection plan.
Summary: Investor Sở Giao thông Vận Tải Lào Cai is an investor with 20 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Giao thông Vận Tải Lào Cai is the investor of 9 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code