Data analysis results of DauThau.info software for bid solicitors Sở Giao thông vận tải tỉnh Bắc Kạn as follows:
- Has relationships with 24 contractor.
- Announced 51 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 144 contractor selection plans with a total of 250 bidding packages, of which 29 prequalification documents have not found the investment project.
- Has invited bids for 7 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 51 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 43 packages with results that do not have tender notice or prequalification notice.
- There are 42 packages that have not fully posted the contractor selection results. Of these 35 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.67 contractors.
- Breakdown by bidding field: Goods 14.29%, Construction 0%, Consultancy 0%, Non-consultancy 85.71%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 14,005,845,097 VND, of which the total winning bid value is: 13,583,376,082 VND.
- The savings rate is: 3.02%.
Data analysis results of DauThau.info software for bid solicitors Sở Giao thông vận tải tỉnh Bắc Kạn as follows:
- Has relationships with 24 contractor.
- The average number of contractors participating in each bidding package is: 1.67 contractors.
- Proportion of bidding fields: Goods 14.29%, Construction 0%, Consulting 0%, Non-consulting 85.71%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 14,005,845,097 VND, in which the total winning value is: 13,583,376,082 VND.
- The savings rate is: 3.02%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 51 investment and development projects.
- As the owner of 115 Contractor selection plan in which 103 Contractor selection plan is self-published, and 12 Contractor selection plan is posted by other units.
- Being the investor of 105 bidding packages in which 7 packages are self-invited, and 98 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Contractor selection plan Project: Repairing damage to the foundation, road surface and reinforcing the shoulder of section Km251+700-Km252+100; Km252+280-Km252+600; Km255+200-Km255+300; Km257+450-Km258+00 National Highway 279, Bac Kan province of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 3 bidding package.
25/10/2024 15:21
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Supplementing the contractor selection plan for site clearance work: Repairing damage to the foundation, road surface and handling traffic safety points in the section Km272+500 - Km277+450 National Highway 279, Bac Kan province of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 2 bidding package.
25/10/2024 08:37
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the results of the bidding package Package No. 03: Measuring cadastral maps and surveying, installing stakes for site clearance of the investor Sở Giao thông vận tải tỉnh Bắc Kạn.
- Winning bidder: CÔNG TY TNHH MTV DỊCH VỤ TƯ VẤN TÀI NGUYÊN VÀ MÔI TRƯỜNG PHƯƠNG ĐÔNG
23/10/2024 16:52
Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted Tender Notice Hire services for additional class B1, B2, and C driving tests in 2024 of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with the form Open bidding.
23/10/2024 16:45
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Contractor selection plan Project: Adding signs, water markers, buoys for inland waterways, Song Nang - Ba Be Lake locality of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 2 bidding package.
21/10/2024 16:23
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the results of the bidding package Tender package No 02: Construction supervision consultancy of the investor Sở Giao thông vận tải tỉnh Bắc Kạn.
- Winning bidder: TRANSPORT ENGINEERING DESIGN INCORPORATED NORTH JOINT STOCK COMPANY
16/10/2024 15:27
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Contractor selection plan for the project of repairing and upgrading overflow works to prevent and overcome consequences of natural disasters and traffic road spillway Km13+900, DT.251 in Coc Dan commune, Ngan Son district of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 4 bidding package.
15/10/2024 17:23
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Contractor selection plan for the project of installing soft orchids on provincial road DT.253 in Ba Be district, Bac Kan province of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 2 bidding package.
15/10/2024 08:51
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the results of the bidding package Construction audit of the investor Sở Giao thông vận tải tỉnh Bắc Kạn.
- Winning bidder: VIET NAM AUDITING FINANCIAL CONSULTANCY COMPANY LIMITED
11/10/2024 16:30
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Hire services for additional class B1, B2, and C driving tests in 2024 of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 1 bidding package.
11/10/2024 14:21
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Giao thông vận tải tỉnh Bắc Kạn publishes the plan Contractor selection plan Project: Repairing damage to the foundation, road surface and reinforcing the shoulder of section Km251+700-Km252+100; Km252+280-Km252+600; Km255+200-Km255+300; Km257+450-Km258+00 National Highway 279, Bac Kan province with 3 bidding package .
25/10/2024 15:21
Sở Giao thông vận tải tỉnh Bắc Kạn publishes the plan Supplementing the contractor selection plan for site clearance work: Repairing damage to the foundation, road surface and handling traffic safety points in the section Km272+500 - Km277+450 National Highway 279, Bac Kan province with 2 bidding package .
25/10/2024 08:37
Sở Giao thông vận tải tỉnh Bắc Kạn announced the results of the bid package Package No. 03: Measuring cadastral maps and surveying, installing stakes for site clearance .
- Winning bidder: CÔNG TY TNHH MTV DỊCH VỤ TƯ VẤN TÀI NGUYÊN VÀ MÔI TRƯỜNG PHƯƠNG ĐÔNG
23/10/2024 16:52
Sở Giao thông vận tải tỉnh Bắc Kạn publishes Tender Notice Hire services for additional class B1, B2, and C driving tests in 2024 in the form Open bidding .
23/10/2024 16:45
Sở Giao thông vận tải tỉnh Bắc Kạn publishes the plan Contractor selection plan Project: Adding signs, water markers, buoys for inland waterways, Song Nang - Ba Be Lake locality with 2 bidding package .
21/10/2024 16:23
Sở Giao thông vận tải tỉnh Bắc Kạn announced the results of the bid package Tender package No 02: Construction supervision consultancy .
- Winning bidder: TRANSPORT ENGINEERING DESIGN INCORPORATED NORTH JOINT STOCK COMPANY
16/10/2024 15:27
Sở Giao thông vận tải tỉnh Bắc Kạn publishes the plan Contractor selection plan for the project of repairing and upgrading overflow works to prevent and overcome consequences of natural disasters and traffic road spillway Km13+900, DT.251 in Coc Dan commune, Ngan Son district with 4 bidding package .
15/10/2024 17:23
Sở Giao thông vận tải tỉnh Bắc Kạn publishes the plan Contractor selection plan for the project of installing soft orchids on provincial road DT.253 in Ba Be district, Bac Kan province with 2 bidding package .
15/10/2024 08:51
Sở Giao thông vận tải tỉnh Bắc Kạn announced the results of the bid package Construction audit .
- Winning bidder: VIET NAM AUDITING FINANCIAL CONSULTANCY COMPANY LIMITED
11/10/2024 16:30
Sở Giao thông vận tải tỉnh Bắc Kạn publishes the plan Hire services for additional class B1, B2, and C driving tests in 2024 with 1 bidding package .
11/10/2024 14:21
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Contractor selection plan Project: Repairing damage to the foundation, road surface and reinforcing the shoulder of section Km251+700-Km252+100; Km252+280-Km252+600; Km255+200-Km255+300; Km257+450-Km258+00 National Highway 279, Bac Kan province of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 3 bidding package.
25/10/2024 15:21
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Supplementing the contractor selection plan for site clearance work: Repairing damage to the foundation, road surface and handling traffic safety points in the section Km272+500 - Km277+450 National Highway 279, Bac Kan province of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 2 bidding package.
25/10/2024 08:37
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the results of the bidding package Package No. 03: Measuring cadastral maps and surveying, installing stakes for site clearance of the investor Sở Giao thông vận tải tỉnh Bắc Kạn.
- Winning bidder: CÔNG TY TNHH MTV DỊCH VỤ TƯ VẤN TÀI NGUYÊN VÀ MÔI TRƯỜNG PHƯƠNG ĐÔNG
23/10/2024 16:52
Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted Tender Notice Hire services for additional class B1, B2, and C driving tests in 2024 of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with the form Open bidding.
23/10/2024 16:45
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Contractor selection plan Project: Adding signs, water markers, buoys for inland waterways, Song Nang - Ba Be Lake locality of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 2 bidding package.
21/10/2024 16:23
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the results of the bidding package Tender package No 02: Construction supervision consultancy of the investor Sở Giao thông vận tải tỉnh Bắc Kạn.
- Winning bidder: TRANSPORT ENGINEERING DESIGN INCORPORATED NORTH JOINT STOCK COMPANY
16/10/2024 15:27
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Contractor selection plan for the project of repairing and upgrading overflow works to prevent and overcome consequences of natural disasters and traffic road spillway Km13+900, DT.251 in Coc Dan commune, Ngan Son district of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 4 bidding package.
15/10/2024 17:23
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Contractor selection plan for the project of installing soft orchids on provincial road DT.253 in Ba Be district, Bac Kan province of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 2 bidding package.
15/10/2024 08:51
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the results of the bidding package Construction audit of the investor Sở Giao thông vận tải tỉnh Bắc Kạn.
- Winning bidder: VIET NAM AUDITING FINANCIAL CONSULTANCY COMPANY LIMITED
11/10/2024 16:30
The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted the request Hire services for additional class B1, B2, and C driving tests in 2024 of the investor Sở Giao thông vận tải tỉnh Bắc Kạn with 1 bidding package.
11/10/2024 14:21
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Giao thông vận tải tỉnh Bắc Kạn has posted 144 of the contractor selection plan, which contains 250 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted 7 Tender Notice in the 7 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has posted 51 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 51 package, canceled the bid 0 package (among the bidding packages above).
- There are 43 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Giao thông vận tải tỉnh Bắc Kạn has a relationship with 24 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: Investor Sở Giao thông vận tải tỉnh Bắc Kạn has a relationship with 3 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Giao thông vận tải tỉnh Bắc Kạn is the investor of 105 package, of which 7 package is self-invited, other units invite bid 98 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Giao thông vận tải tỉnh Bắc Kạn is the owner of 115 contractor selection plan. In which, they self-invite 103 of contractor selection plan, other units invite bids of 12 of contractor selection plan.
Summary: Investor Sở Giao thông vận tải tỉnh Bắc Kạn is an investor with 97 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Giao thông vận tải tỉnh Bắc Kạn is the investor of 51 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code