Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Sở Xây dựng Gia Lai as follows:
- Has relationships with 1 project owners.
- Has relationships with 61 contractor.
- Announced 31 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 55 contractor selection plans with a total of 87 bidding packages, of which 25 prequalification documents have not found the investment project.
- Has invited bids for 41 packages (with 44 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 39 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 45 packages that have not fully posted the contractor selection results. Of these 38 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.29 contractors.
- Breakdown by bidding field: Goods 0%, Construction 2.27%, Consultancy 95.45%, Non-consultancy 2.27%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 37,158,483,206 VND, of which the total winning bid value is: 34,619,775,354 VND.
- The savings rate is: 6.83%.
Data analysis results of DauThau.info software for bid solicitors Sở Xây dựng Gia Lai as follows:
- Has relationships with 61 contractor.
- The average number of contractors participating in each bidding package is: 1.29 contractors.
- Proportion of bidding fields: Goods 0%, Construction 2.27%, Consulting 95.45%, Non-consulting 2.27%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 37,158,483,206 VND, in which the total winning value is: 34,619,775,354 VND.
- The savings rate is: 6.83%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Xây dựng Gia Lai are as follows:
- Is the investor of 31 development investment projects.
- Is the investor of 72 contractor selection plans, of which 44 were self-published, and 28 were published by other entities.
- Is the investor of 54 Tender Notices, of which 42 were self-invited, and 12 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Sở Xây dựng Gia Lai announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG GIAO THÔNG GIA LAI
07/01/2026 08:23
Sở Xây dựng Gia Lai publishes the plan Plan to select contractors for the project: Construction of new toilets for 2 primary schools and 2 secondary schools in wards of An Nhon town under project 5.2ABC: Improving school sanitation infrastructure in An Nhon town - Vietnam - France cooperation program with 6 bidding package .
30/12/2025 10:55
Investor Sở Xây dựng Gia Lai has posted an investment and development project Construction of new toilets for 2 primary schools and 2 secondary schools in wards of An Nhon town under project 5.2ABC: Improving school sanitation infrastructure in An Nhon town - Vietnam - France cooperation program..
30/12/2025 10:10
Sở Xây dựng Gia Lai publishes the plan Repairing Le Bac bridge Km99+161 National Highway 25, Gia Lai province with 6 bidding package .
23/12/2025 08:40
Sở Xây dựng Gia Lai announced the results of the bid package Construction supervision consultancy .
- Winning bidder: AN BINH TRANSPORT ENGINNEERING - CONSULTING JOINT STOCK COMPANY
23/12/2025 08:20
Sở Xây dựng Gia Lai announced the results of the bid package Construction supervision consultancy .
19/12/2025 17:13
Sở Xây dựng Gia Lai announced the results of the bid package Civil Works .
- Winning bidder: BINH DINH WATERWAY AND ROAD JOINT STOCK COMPANY
19/12/2025 17:11
Sở Xây dựng Gia Lai publishes the plan Plan - LCNT - Unscheduled repairs to ensure traffic safety on National Highway 19, New National Highway 19 and Provincial Road 630 with 2 bidding package .
18/12/2025 09:35
Investor Sở Xây dựng Gia Lai has posted an investment and development project Unscheduled repairs to ensure traffic safety on National Highway 19, New National Highway 19 and Provincial Road 630.
18/12/2025 09:09
Sở Xây dựng Gia Lai announced the results of the bid package Consulting, surveying, making economic and technical reports on construction investment .
- Winning bidder: CÔNG TY TNHH TƯ VẤN HỘI CẦU ĐƯỜNG
17/12/2025 09:06
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Xây dựng Gia Lai announced the results of the bid package Consultancy for design verification and estimation .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG GIAO THÔNG GIA LAI
30/10/2025 08:02
Sở Xây dựng Gia Lai announced the results of the bid package Consulting, surveying, making economic and technical reports on construction investment .
- Winning bidder: Trung tâm kỹ thuật đường bộ 3
30/10/2025 08:01
Sở Xây dựng Gia Lai publishes the plan Plan - CBĐT - Repairing Song Ba bridge Km80+316, National Highway 19, Gia Lai province with 2 bidding package .
30/10/2025 07:58
Sở Xây dựng Gia Lai announced the results of the bid package Develop economic - technical norms of urban drainage services, urban greenery, urban lighting in Binh Dinh province (package 2) .
- Winning bidder: SOUTHERN CITY AND CONSTRUCTION MANAGEMENT COMPANY LIMITED
31/07/2025 10:54
Sở Xây dựng Gia Lai announced the results of the bidding package Develop economic - technical norms of urban drainage services, urban greenery, urban lighting in Binh Dinh province (package 2) with 2 participating contractors .
09/07/2025 09:01
Sở Xây dựng Gia Lai announced the results of the bid package Construction supervision consultancy .
- Winning bidder: THAI TRUONG MINH CO.,LTD
03/07/2025 16:38
Sở Xây dựng Gia Lai announced the results of the bid package Construction supervision consultancy .
- Winning bidder: THAI TRUONG MINH CO.,LTD
03/07/2025 16:36
Sở Xây dựng Gia Lai announced the results of the bid package Civil Works .
- Winning bidder: HUYNH DUONG COMPANY LIMITED
03/07/2025 16:32
Sở Xây dựng Gia Lai announced the results of the bid package Civil Works .
- Winning bidder: BINH DINH WATERWAY AND ROAD JOINT STOCK COMPANY
03/07/2025 16:29
Sở Xây dựng Gia Lai publishes Tender Notice Develop economic - technical norms of urban drainage services, urban greenery, urban lighting in Binh Dinh province (package 2) in the form Open bidding .
27/06/2025 18:14
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Xây dựng Gia Lai announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG GIAO THÔNG GIA LAI
07/01/2026 08:23
Sở Xây dựng Gia Lai publishes the plan Plan to select contractors for the project: Construction of new toilets for 2 primary schools and 2 secondary schools in wards of An Nhon town under project 5.2ABC: Improving school sanitation infrastructure in An Nhon town - Vietnam - France cooperation program with 6 bidding package .
30/12/2025 10:55
Investor Sở Xây dựng Gia Lai has posted an investment and development project Construction of new toilets for 2 primary schools and 2 secondary schools in wards of An Nhon town under project 5.2ABC: Improving school sanitation infrastructure in An Nhon town - Vietnam - France cooperation program..
30/12/2025 10:10
Sở Xây dựng Gia Lai publishes the plan Repairing Le Bac bridge Km99+161 National Highway 25, Gia Lai province with 6 bidding package .
23/12/2025 08:40
Sở Xây dựng Gia Lai announced the results of the bid package Construction supervision consultancy .
- Winning bidder: AN BINH TRANSPORT ENGINNEERING - CONSULTING JOINT STOCK COMPANY
23/12/2025 08:20
Sở Xây dựng Gia Lai announced the results of the bid package Construction supervision consultancy .
19/12/2025 17:13
Sở Xây dựng Gia Lai announced the results of the bid package Civil Works .
- Winning bidder: BINH DINH WATERWAY AND ROAD JOINT STOCK COMPANY
19/12/2025 17:11
Sở Xây dựng Gia Lai publishes the plan Plan - LCNT - Unscheduled repairs to ensure traffic safety on National Highway 19, New National Highway 19 and Provincial Road 630 with 2 bidding package .
18/12/2025 09:35
Investor Sở Xây dựng Gia Lai has posted an investment and development project Unscheduled repairs to ensure traffic safety on National Highway 19, New National Highway 19 and Provincial Road 630.
18/12/2025 09:09
Sở Xây dựng Gia Lai announced the results of the bid package Consulting, surveying, making economic and technical reports on construction investment .
- Winning bidder: CÔNG TY TNHH TƯ VẤN HỘI CẦU ĐƯỜNG
17/12/2025 09:06
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Xây dựng Gia Lai has posted 55 of the contractor selection plan, which contains 87 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Xây dựng Gia Lai has posted 44 Tender Notices in 41 bidding packages. Among these, 41 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Xây dựng Gia Lai has posted 39 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 39 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Xây dựng Gia Lai has a relationship with 61 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Xây dựng Gia Lai has a relationship with 12 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Xây dựng Gia Lai has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects