Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Sở Xây dựng Thái Bình as follows:
- Has relationships with 1 project owners.
- Has relationships with 28 contractor.
- Announced 24 investment development project, of which 5 projects have not yet announced the prequalification documents.
- Announced 64 contractor selection plans with a total of 79 bidding packages, of which 45 prequalification documents have not found the investment project.
- Has invited bids for 4 packages (with 4 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 35 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 31 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 32 packages that have not fully posted the contractor selection results. Of these 32 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.75 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 100.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 12,995,487,000 VND, of which the total winning bid value is: 12,384,854,660 VND.
- The savings rate is: 4.70%.
Data analysis results of DauThau.info software for bid solicitors Sở Xây dựng Thái Bình as follows:
- Has relationships with 28 contractor.
- The average number of contractors participating in each bidding package is: 1.75 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 100.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 12,995,487,000 VND, in which the total winning value is: 12,384,854,660 VND.
- The savings rate is: 4.70%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Xây dựng Thái Bình are as follows:
- Is the investor of 24 development investment projects.
- Is the investor of 49 contractor selection plans, of which 45 were self-published, and 4 were published by other entities.
- Is the investor of 16 Tender Notices, of which 4 were self-invited, and 12 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Sở Xây dựng Thái Bình has posted the results of the bidding package Bid evaluation consultancy of the investor Sở Xây dựng Thái Bình.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG FCT VIỆT NAM
21/08/2025 14:14
The Bid solicitor Sở Xây dựng Thái Bình has posted the request Construction of works and ensuring traffic safety of the investor Sở Xây dựng Thái Bình with 1 bidding package.
01/07/2025 18:05
The Bid solicitor Ban Quản lý và bảo trì công trình has posted the results of the bidding package Construction of works and ensuring traffic safety of the investor Sở Xây dựng Thái Bình.
- Winning bidder: THANG LONG BRIDGE NO 11 REPAIR AND CONSTRUCTION JOINT STOCK COMPANY
30/06/2025 14:07
The Bid solicitor Ban Quản lý và bảo trì công trình has posted the results of the bidding package Construction of works and ensuring traffic safety of the investor Sở Xây dựng Thái Bình.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI MINH TRƯỜNG
29/06/2025 10:46
The Bid solicitor Ban Quản lý và bảo trì công trình has posted the results of the bidding package Construction of works and ensuring traffic safety of the investor Sở Xây dựng Thái Bình.
- Winning bidder: TIEN PHU BUILDING COMPANY LIMITED
29/06/2025 10:45
The Bid solicitor Ban Quản lý và bảo trì công trình has posted the results of the bidding package Process testing and evaluation of works of the investor Sở Xây dựng Thái Bình.
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
29/06/2025 10:41
Investor Sở Xây dựng Thái Bình has posted an investment and development project Repair damage to the road surface of Km80 - Km80+200, Km80+790 - Km81 and drainage system section of Km80 -Km81, QL.10, Thai Binh Province.
29/06/2025 10:10
Investor Sở Xây dựng Thái Bình has posted an investment and development project Repair damage to the road surface of Km74+00 -km75+700 and drainage system segment Km74+100 - Km75+200, Highway 10, Thai Binh Province.
29/06/2025 10:10
Investor Sở Xây dựng Thái Bình has posted an investment and development project Repair of Tra Ly Bridge Km16+100, Highway 37, Thai Binh Province.
29/06/2025 10:10
The Bid solicitor Sở Xây dựng Thái Bình has posted the results of the bidding package Construction audit of the investor Sở Xây dựng Thái Bình.
- Winning bidder: /
26/06/2025 17:42
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Xây dựng Thái Bình announced the results of the bid package Bid evaluation consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG FCT VIỆT NAM
21/08/2025 14:14
Sở Xây dựng Thái Bình publishes the plan Construction of works and ensuring traffic safety with 1 bidding package .
01/07/2025 18:05
Sở Xây dựng Thái Bình announced the results of the bid package Construction audit .
- Winning bidder: /
26/06/2025 17:42
Sở Xây dựng Thái Bình publishes the plan Construction of works and ensuring traffic safety with 1 bidding package .
19/06/2025 09:51
Sở Xây dựng Thái Bình announced the results of the bid package Consulting, surveying, making economic - technical reports for construction works .
- Winning bidder: SAO KHUE INVESTMENT- CONSTRUCTION JOINT STOCK COMPANY
17/06/2025 13:50
Sở Xây dựng Thái Bình publishes the plan Survey consultancy, Economic and technical report on construction works under the existing point of handling project, inadequate traffic safety Km62+00 - Km62+400, Highway 39 with 1 bidding package .
17/06/2025 13:46
Sở Xây dựng Thái Bình publishes the plan Construction of works and ensuring traffic safety with 1 bidding package .
09/06/2025 09:53
Sở Xây dựng Thái Bình publishes the plan Construction of works and ensuring traffic safety with 1 bidding package .
09/06/2025 09:41
Sở Xây dựng Thái Bình publishes the plan Process testing and evaluation of works with 1 bidding package .
03/06/2025 09:53
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Sở Xây dựng Thái Bình has posted the results of the bidding package Bid evaluation consultancy of the investor Sở Xây dựng Thái Bình.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG FCT VIỆT NAM
21/08/2025 14:14
The Bid solicitor Sở Xây dựng Thái Bình has posted the request Construction of works and ensuring traffic safety of the investor Sở Xây dựng Thái Bình with 1 bidding package.
01/07/2025 18:05
The Bid solicitor Ban Quản lý và bảo trì công trình has posted the results of the bidding package Construction of works and ensuring traffic safety of the investor Sở Xây dựng Thái Bình.
- Winning bidder: THANG LONG BRIDGE NO 11 REPAIR AND CONSTRUCTION JOINT STOCK COMPANY
30/06/2025 14:07
The Bid solicitor Ban Quản lý và bảo trì công trình has posted the results of the bidding package Construction of works and ensuring traffic safety of the investor Sở Xây dựng Thái Bình.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI MINH TRƯỜNG
29/06/2025 10:46
The Bid solicitor Ban Quản lý và bảo trì công trình has posted the results of the bidding package Construction of works and ensuring traffic safety of the investor Sở Xây dựng Thái Bình.
- Winning bidder: TIEN PHU BUILDING COMPANY LIMITED
29/06/2025 10:45
The Bid solicitor Ban Quản lý và bảo trì công trình has posted the results of the bidding package Process testing and evaluation of works of the investor Sở Xây dựng Thái Bình.
- Winning bidder: CÔNG TY TNHH GIAO THÔNG VẬN TẢI
29/06/2025 10:41
Investor Sở Xây dựng Thái Bình has posted an investment and development project Repair damage to the road surface of Km80 - Km80+200, Km80+790 - Km81 and drainage system section of Km80 -Km81, QL.10, Thai Binh Province.
29/06/2025 10:10
Investor Sở Xây dựng Thái Bình has posted an investment and development project Repair damage to the road surface of Km74+00 -km75+700 and drainage system segment Km74+100 - Km75+200, Highway 10, Thai Binh Province.
29/06/2025 10:10
Investor Sở Xây dựng Thái Bình has posted an investment and development project Repair of Tra Ly Bridge Km16+100, Highway 37, Thai Binh Province.
29/06/2025 10:10
The Bid solicitor Sở Xây dựng Thái Bình has posted the results of the bidding package Construction audit of the investor Sở Xây dựng Thái Bình.
- Winning bidder: /
26/06/2025 17:42
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Xây dựng Thái Bình has posted 64 of the contractor selection plan, which contains 79 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Xây dựng Thái Bình has posted 4 Tender Notices in 4 bidding packages. Among these, 4 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Xây dựng Thái Bình has posted 35 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 35 package, canceled the bid 0 package (among the bidding packages above).
- There are 31 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Xây dựng Thái Bình has a relationship with 28 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Xây dựng Thái Bình has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Xây dựng Thái Bình has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects