Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Sở Xây dựng tỉnh Lạng Sơn as follows:
- Has relationships with 1 project owners.
- Has relationships with 89 contractor.
- Announced 113 investment development project, of which 12 projects have not yet announced the prequalification documents.
- Announced 141 contractor selection plans with a total of 201 bidding packages, of which 17 prequalification documents have not found the investment project.
- Has invited bids for 120 packages (with 144 tender notices), and conducted prequalification for 0 packages.
- There are 3 bidding packages with content that needs clarification.
- Announced the results of 127 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 16 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 59 packages that have not fully posted the contractor selection results. Of these 58 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.30 contractors.
- Breakdown by bidding field: Goods 0.69%, Construction 56.25%, Consultancy 36.11%, Non-consultancy 6.94%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 534,590,362,000 VND, of which the total winning bid value is: 518,736,318,000 VND.
- The savings rate is: 2.97%.
Data analysis results of DauThau.info software for bid solicitors Sở Xây dựng tỉnh Lạng Sơn as follows:
- Has relationships with 89 contractor.
- The average number of contractors participating in each bidding package is: 1.30 contractors.
- Proportion of bidding fields: Goods 0.69%, Construction 56.25%, Consulting 36.11%, Non-consulting 6.94%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 534,590,362,000 VND, in which the total winning value is: 518,736,318,000 VND.
- The savings rate is: 2.97%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Xây dựng tỉnh Lạng Sơn are as follows:
- Is the investor of 113 development investment projects.
- Is the investor of 167 contractor selection plans, of which 120 were self-published, and 47 were published by other entities.
- Is the investor of 234 Tender Notices, of which 144 were self-invited, and 90 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Package No. 01: Construction of works Repairing damaged foundations, road surfaces and drainage works in sections Km75 - Km78, Km79 - Km80, Km83 + 692 - Km85 + 00, National Highway 1B, Lang Son province .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG CÔNG TRÌNH 789
08/01/2026 10:46
Sở Xây dựng tỉnh Lạng Sơn publishes Tender Notice Tender package No 01: Construction work in the form Open bidding .
29/12/2025 09:22
Sở Xây dựng tỉnh Lạng Sơn publishes the plan Renovate and partially repair route DT.236 (Loc Binh - Chi Ma) with 2 bidding package .
17/12/2025 10:00
Investor Sở Xây dựng tỉnh Lạng Sơn has posted an investment and development project Renovate and partially repair route DT.236 (Loc Binh - Chi Ma).
17/12/2025 09:09
Sở Xây dựng tỉnh Lạng Sơn publishes Tender Notice Tender package No 01: Construction of section Km53+00 - Km57+00 under the project: Repairing local damage to the foundation and road surface of section Km53+00 - Km61+00, National Highway 3B, Lang Son province in the form Open bidding .
16/12/2025 17:07
Sở Xây dựng tỉnh Lạng Sơn publishes Tender Notice Tender package No 02: Construction of section Km57+00 - Km61+00 under Project: Repair of local damage to the foundation and road surface of section Km53+00 - Km61+00, National Highway 3B, Lang Son province in the form Open bidding .
16/12/2025 17:06
Sở Xây dựng tỉnh Lạng Sơn publishes Tender Notice Tender package No 01: Construction of works Repairing damaged foundations, road surfaces and drainage works in sections Km75 - Km78, Km79 - Km80, Km83 + 692 - Km85 + 00, National Highway 1B, Lang Son province in the form Open bidding .
02/12/2025 14:03
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Bidding package 13: Completed audit audit consultancy .
- Winning bidder: ASCO FIRM AUDITING AND VALUATION COMPANY LIMITED
01/12/2025 14:55
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Construction of works to handle school positions unsafe, located close to provincial roads in Lang Son province. .
- Winning bidder: CÔNG TY TNHH MTV HUYỀN MẠNH
01/12/2025 14:43
Sở Xây dựng tỉnh Lạng Sơn publishes the plan Repairing local damage to the foundation and road surface, section Km53+00 - Km61+00 National Highway 3B, Lang Son province with 4 bidding package .
01/12/2025 11:14
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Xây dựng tỉnh Lạng Sơn publishes the plan Plan for selecting contractors for repairing foundation, road surface and drainage works in the section of Km48+500 - Km53+000, DT.226 with 2 bidding package .
01/07/2025 15:19
Sở Xây dựng tỉnh Lạng Sơn publishes the plan Plan for selecting construction contractors: Repairing the foundation, road surface and drainage system section of Km8+00 - Km14+00, DT.231. with 2 bidding package .
26/06/2025 07:47
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Package No. 01: Construction of works to repair damaged foundation, road surface and water drainage works Km185+250 - Km188+200 and Km194 - Km197; Repair traffic safety system of Km183 - Km229, Highway 279, Lang Son Province .
- Winning bidder: 559 INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
25/06/2025 15:23
Sở Xây dựng tỉnh Lạng Sơn publishes the plan The plan to select the contractor for repairing the road surface of the road surface from km13+300 - km14+250 and the drainage system section from km9+700 - km14+900, DT.239 with 2 bidding package .
25/06/2025 14:15
Sở Xây dựng tỉnh Lạng Sơn publishes the plan Plan for selecting contractors to handle school locations unsafe, located close to provincial roads in Lang Son province with 1 bidding package .
25/06/2025 11:04
Sở Xây dựng tỉnh Lạng Sơn publishes the plan Plan for selecting construction contractors: Flooding points to ensure traffic safety in the rainy season from Km10+600 - Km12+00, DT.237, Loc Binh District. with 1 bidding package .
25/06/2025 10:47
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Package 02: Construction supervision .
- Winning bidder: CÔNG TY CP TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG - NGHỆ AN
22/06/2025 10:09
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Package No. 01: Construction of works to handle flooding points flooded with Vo Ma spillway (Km50+910) and Pacc - 390 Km52+390), Highway 3B, Lang Son Province .
- Winning bidder: HIEP PHU CONSTRUCTION JOINT STOCK COMPANY
22/06/2025 10:07
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Package No. 01: Construction of damaged repair works of Khuoi Xe bridge (Km218+970), Khuoi Sinh (Km221+219), Highway 279, Lang Son Province .
- Winning bidder: 168 TRAFFIC BUILD JOINT STOCK COMPANY, 85 COMMERCE AND TRAFFIC PROJECT CONSTRUCT JOINT STOCK COMPANY
22/06/2025 10:06
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Construction of works: Repairing traffic safety system from Km101+000 to Km128+500 and from km130+00 to km162+00; Repair, complete drainage system Km101+000 - Km128+500 and Km130+000 - Km162+000, Highway 31, Lang Son Province .
- Winning bidder: NUMBER 909 TRADING AND CONSTRUCTION DEVELOPMENT JOINT STOCK COMPANY, TAY TRUONG SON TRANSPORT CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
22/06/2025 10:06
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Package No. 01: Construction of works Repairing damaged foundations, road surfaces and drainage works in sections Km75 - Km78, Km79 - Km80, Km83 + 692 - Km85 + 00, National Highway 1B, Lang Son province .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG CÔNG TRÌNH 789
08/01/2026 10:46
Sở Xây dựng tỉnh Lạng Sơn publishes Tender Notice Tender package No 01: Construction work in the form Open bidding .
29/12/2025 09:22
Sở Xây dựng tỉnh Lạng Sơn publishes the plan Renovate and partially repair route DT.236 (Loc Binh - Chi Ma) with 2 bidding package .
17/12/2025 10:00
Investor Sở Xây dựng tỉnh Lạng Sơn has posted an investment and development project Renovate and partially repair route DT.236 (Loc Binh - Chi Ma).
17/12/2025 09:09
Sở Xây dựng tỉnh Lạng Sơn publishes Tender Notice Tender package No 01: Construction of section Km53+00 - Km57+00 under the project: Repairing local damage to the foundation and road surface of section Km53+00 - Km61+00, National Highway 3B, Lang Son province in the form Open bidding .
16/12/2025 17:07
Sở Xây dựng tỉnh Lạng Sơn publishes Tender Notice Tender package No 02: Construction of section Km57+00 - Km61+00 under Project: Repair of local damage to the foundation and road surface of section Km53+00 - Km61+00, National Highway 3B, Lang Son province in the form Open bidding .
16/12/2025 17:06
Sở Xây dựng tỉnh Lạng Sơn publishes Tender Notice Tender package No 01: Construction of works Repairing damaged foundations, road surfaces and drainage works in sections Km75 - Km78, Km79 - Km80, Km83 + 692 - Km85 + 00, National Highway 1B, Lang Son province in the form Open bidding .
02/12/2025 14:03
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Bidding package 13: Completed audit audit consultancy .
- Winning bidder: ASCO FIRM AUDITING AND VALUATION COMPANY LIMITED
01/12/2025 14:55
Sở Xây dựng tỉnh Lạng Sơn announced the results of the bid package Construction of works to handle school positions unsafe, located close to provincial roads in Lang Son province. .
- Winning bidder: CÔNG TY TNHH MTV HUYỀN MẠNH
01/12/2025 14:43
Sở Xây dựng tỉnh Lạng Sơn publishes the plan Repairing local damage to the foundation and road surface, section Km53+00 - Km61+00 National Highway 3B, Lang Son province with 4 bidding package .
01/12/2025 11:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Xây dựng tỉnh Lạng Sơn has posted 141 of the contractor selection plan, which contains 201 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Xây dựng tỉnh Lạng Sơn has posted 144 Tender Notices in 120 bidding packages. Among these, 144 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Xây dựng tỉnh Lạng Sơn has posted 127 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 127 package, canceled the bid 0 package (among the bidding packages above).
- There are 16 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Xây dựng tỉnh Lạng Sơn has a relationship with 89 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Xây dựng tỉnh Lạng Sơn has a relationship with 21 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Xây dựng tỉnh Lạng Sơn has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects