Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG as follows:
- Has relationships with 9 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 19 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 10 packages (with 11 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 15 packages that have not fully posted the contractor selection results. Of these 15 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.25 contractors.
- Breakdown by bidding field: Goods 54.55%, Construction 27.27%, Consultancy 18.18%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 45,959,959,238 VND, of which the total winning bid value is: 45,756,609,881 VND.
- The savings rate is: 0.44%.
Data analysis results of DauThau.info software for bid solicitors TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 2.25 contractors.
- Proportion of bidding fields: Goods 54.55%, Construction 27.27%, Consulting 18.18%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 45,959,959,238 VND, in which the total winning value is: 45,756,609,881 VND.
- The savings rate is: 0.44%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 1 investment and development projects.
- As the owner of 3 Contractor selection plan in which 3 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 5 bidding packages in which 5 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted the results of the bidding package Package No. 3: Consulting on construction supervision and equipment supply and installation of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG.
- Winning bidder: My Thuan Construction Consulting Joint Stock Company
08/12/2023 17:21
The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted the results of the bidding package Package 6: Construction and equipment supply and installation of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG.
- Winning bidder: DUC VIET THANH COMPANY LIMITED
08/12/2023 17:17
Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted Tender Notice Package 6: Construction and equipment supply and installation of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG with the form Open bidding.
07/11/2023 09:10
Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted Tender Notice Package 6: Construction and equipment supply and installation of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG with the form Open bidding.
30/10/2023 08:24
Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted Tender Notice Tender package No 3: Consulting on construction supervision and equipment supply and installation of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG with the form Open bidding.
28/10/2023 13:58
The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted the request Contractor selection plan (phase 2) for the project of new construction of the office of the People's Court of Vinh Long city, Vinh Long province of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG with 15 bidding package.
20/10/2023 09:31
The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted the results of the bidding package Project management consultancy of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG.
- Winning bidder: COVICO CONSULTANT INVESTMENT CONSTRUCTION COMPANY LIMITED
16/05/2023 14:21
Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted Tender Notice Project management consultancy of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG with the form Open bidding.
28/03/2023 10:43
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG Posted Development Investment Project Building a new office of the People's Court of Vinh Long city, Vinh Long province.
17/02/2023 10:10
The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted the results of the bidding package Civil Works of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ THƯƠNG MẠI PHƯƠNG NAM
09/07/2022 15:26
The data sheet has been partially hidden, to see the full information please Login or Register
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG announced the results of the bid package Package No. 3: Consulting on construction supervision and equipment supply and installation .
- Winning bidder: My Thuan Construction Consulting Joint Stock Company
08/12/2023 17:21
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG announced the results of the bid package Package 6: Construction and equipment supply and installation .
- Winning bidder: NAM QUAN SERVICE TRADING CONSTRUCTION CONSULTING COMPANY LIMITED, D.L.S COMPANY LIMITED, DUC VIET THANH COMPANY LIMITED
08/12/2023 17:17
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG announced the results of the bidding package Package 6: Construction and equipment supply and installation with 1 participating contractors .
19/11/2023 08:20
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG announced the results of the bidding package Tender package No 3: Consulting on construction supervision and equipment supply and installation with 2 participating contractors .
17/11/2023 08:06
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG publishes Tender Notice Package 6: Construction and equipment supply and installation in the form Open bidding .
07/11/2023 09:10
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG publishes Tender Notice Package 6: Construction and equipment supply and installation in the form Open bidding .
30/10/2023 08:24
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG publishes Tender Notice Tender package No 3: Consulting on construction supervision and equipment supply and installation in the form Open bidding .
28/10/2023 13:58
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG publishes the plan Contractor selection plan (phase 2) for the project of new construction of the office of the People's Court of Vinh Long city, Vinh Long province with 15 bidding package .
20/10/2023 09:31
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG announced the results of the bid package Project management consultancy .
- Winning bidder: COVICO CONSULTANT INVESTMENT CONSTRUCTION COMPANY LIMITED
16/05/2023 14:21
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG announced the results of the bidding package Project management consultancy with 1 participating contractors .
18/04/2023 09:01
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted the results of the bidding package Package No. 3: Consulting on construction supervision and equipment supply and installation of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG.
- Winning bidder: My Thuan Construction Consulting Joint Stock Company
08/12/2023 17:21
The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted the results of the bidding package Package 6: Construction and equipment supply and installation of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG.
- Winning bidder: DUC VIET THANH COMPANY LIMITED
08/12/2023 17:17
Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted Tender Notice Package 6: Construction and equipment supply and installation of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG with the form Open bidding.
07/11/2023 09:10
Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted Tender Notice Package 6: Construction and equipment supply and installation of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG with the form Open bidding.
30/10/2023 08:24
Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted Tender Notice Tender package No 3: Consulting on construction supervision and equipment supply and installation of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG with the form Open bidding.
28/10/2023 13:58
The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted the request Contractor selection plan (phase 2) for the project of new construction of the office of the People's Court of Vinh Long city, Vinh Long province of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG with 15 bidding package.
20/10/2023 09:31
The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted the results of the bidding package Project management consultancy of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG.
- Winning bidder: COVICO CONSULTANT INVESTMENT CONSTRUCTION COMPANY LIMITED
16/05/2023 14:21
Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted Tender Notice Project management consultancy of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG with the form Open bidding.
28/03/2023 10:43
TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG Posted Development Investment Project Building a new office of the People's Court of Vinh Long city, Vinh Long province.
17/02/2023 10:10
The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted the results of the bidding package Civil Works of the investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ THƯƠNG MẠI PHƯƠNG NAM
09/07/2022 15:26
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted 3 of the contractor selection plan, which contains 19 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted 11 Tender Notice in the 10 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG is the investor of 5 package, of which 5 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG is an investor with 9 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor TÒA ÁN NHÂN DÂN TỈNH VĨNH LONG is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code