Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trại giam Phú Sơn 4 as follows:
- Has relationships with 1 project owners.
- Has relationships with 74 contractor.
- Announced 8 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 209 contractor selection plans with a total of 268 bidding packages, of which 204 prequalification documents have not found the investment project.
- Has invited bids for 48 packages (with 52 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 207 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 162 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 61 packages that have not fully posted the contractor selection results. Of these 59 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.70 contractors.
- Breakdown by bidding field: Goods 75.00%, Construction 7.69%, Consultancy 0%, Non-consultancy 17.31%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 195,272,345,347 VND, of which the total winning bid value is: 193,280,366,935 VND.
- The savings rate is: 1.02%.
Data analysis results of DauThau.info software for bid solicitors Trại giam Phú Sơn 4 as follows:
- Has relationships with 74 contractor.
- The average number of contractors participating in each bidding package is: 1.70 contractors.
- Proportion of bidding fields: Goods 75.00%, Construction 7.69%, Consulting 0%, Non-consulting 17.31%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 195,272,345,347 VND, in which the total winning value is: 193,280,366,935 VND.
- The savings rate is: 1.02%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trại giam Phú Sơn 4 are as follows:
- Is the investor of 8 development investment projects.
- Is the investor of 248 contractor selection plans, of which 188 were self-published, and 60 were published by other entities.
- Is the investor of 59 Tender Notices, of which 51 were self-invited, and 8 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trại giam Phú Sơn 4 announced the results of the bid package Bidding Package No. 04: Appraisal consulting Consulting appraising request documents, appraising contractor selection results for Bidding Package No. 01 and Bidding Package No. 02 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN - XÂY DỰNG - CƠ GIỚI VIỆT NAM
10/01/2026 17:47
Trại giam Phú Sơn 4 announced the results of the bid package Package No. 03: Consulting on making a request to evaluate the proposal dossier for package 01 and package No. 02 .
- Winning bidder: MK VIET NAM CONSULTING AND CONSTRUCTION COMPANY LIMITED
10/01/2026 17:42
Trại giam Phú Sơn 4 publishes the plan Buy necessities for the first 6 months of 2026 for inmates of Phu Son 4 Prison with 4 bidding package .
10/01/2026 11:20
Trại giam Phú Sơn 4 announced the results of the bid package Bidding Package No. 02: Consulting on preparation of Requirements Documents, evaluation of preparation of Proposal Documents for goods procurement packages .
- Winning bidder: MK VIET NAM CONSULTING AND CONSTRUCTION COMPANY LIMITED
08/01/2026 15:59
Trại giam Phú Sơn 4 publishes the plan Procurement of necessities for the first 6 months of 2026 to serve prisoners at Phu Son 4 Prison with 2 bidding package .
08/01/2026 15:54
Trại giam Phú Sơn 4 announced the results of the bid package Package No. 01: Supplying fuel for the first 6 months of 2026 for Phu Son 4 Prison .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ THÀNH HƯNG THÁI NGUYÊN
07/01/2026 15:25
Trại giam Phú Sơn 4 announced the results of the bid package Purchase fire prevention, fire fighting and rescue supplies in 2025 .
- Winning bidder: HỘ KINH DOANH BÀN THỊ THỦY
30/12/2025 10:04
Trại giam Phú Sơn 4 announced the results of the bid package Buying renovated materials K1 .
- Winning bidder: CÔNG TY TNHH TÔN THÉP ÁNH DƯƠNG
30/12/2025 09:33
Trại giam Phú Sơn 4 publishes the plan Buying renovated materials K1 with 1 bidding package .
30/12/2025 09:32
Trại giam Phú Sơn 4 publishes the plan Purchase fire prevention, fire fighting and rescue supplies in 2025 with 1 bidding package .
30/12/2025 09:32
The data sheet has been partially hidden, to see the full information please Login or Register
Trại giam Phú Sơn 4 announced the results of the bid package Construction, installation, and relocation of lightning protection poles, Sub-camp No. 4 - Phu Son 4 Prison .
- Winning bidder: PHU THAI INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
31/10/2025 08:06
Trại giam Phú Sơn 4 announced the results of the bid package Construction, installation, and relocation of the central computer room system of 41 security surveillance cameras for Phu Son 4 Prison .
- Winning bidder: BAO NHI TELECOMMUNICATIONS CONSTRUCTION AND DEVELOPMENT.,JSC
28/10/2025 16:02
Trại giam Phú Sơn 4 publishes the plan Construction, installation, and relocation of the central computer room system of 41 security surveillance cameras for Phu Son 4 Prison with 1 bidding package .
28/10/2025 15:29
Trại giam Phú Sơn 4 publishes the plan Construction, installation, and relocation of lightning protection poles, Sub-camp No. 4 - Phu Son 4 Prison with 1 bidding package .
28/10/2025 14:41
Trại giam Phú Sơn 4 announced the results of the bid package Package 01: Procurement of raw materials to produce raincoats for prisoners, campers, students of C10 Department in 2025 .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN ÁO MƯA VIỆT ANH
16/07/2025 09:31
Trại giam Phú Sơn 4 announced the results of the bid package Bidding package 02: Consulting E-HSMT, E-HSDT evaluation for package 01 .
- Winning bidder: MK VIET NAM CONSULTING AND CONSTRUCTION COMPANY LIMITED
15/07/2025 17:04
Trại giam Phú Sơn 4 announced the results of the bid package Package 01: Procurement of materials to produce towels for prisoners, campers, students of C10 Department in 2025 .
- Winning bidder: HỘ KINH DOANH TRỊNH VĂN SƠN
15/07/2025 16:50
Trại giam Phú Sơn 4 announced the results of the bidding package Package 01: Procurement of raw materials to produce raincoats for prisoners, campers, students of C10 Department in 2025 with 1 participating contractors .
10/07/2025 10:43
Trại giam Phú Sơn 4 announced the results of the bid package Buy additional green vegetables for prisoners due to floods .
- Winning bidder: HỘ KINH DOANH ĐÀO VĂN HOÀNG
06/07/2025 09:32
Trại giam Phú Sơn 4 publishes the plan Buy additional vegetables for prisoners due to floods with 1 bidding package .
06/07/2025 09:27
The data sheet has been partially hidden, to see the full information please Login or Register
Trại giam Phú Sơn 4 announced the results of the bid package Bidding Package No. 04: Appraisal consulting Consulting appraising request documents, appraising contractor selection results for Bidding Package No. 01 and Bidding Package No. 02 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN - XÂY DỰNG - CƠ GIỚI VIỆT NAM
10/01/2026 17:47
Trại giam Phú Sơn 4 announced the results of the bid package Package No. 03: Consulting on making a request to evaluate the proposal dossier for package 01 and package No. 02 .
- Winning bidder: MK VIET NAM CONSULTING AND CONSTRUCTION COMPANY LIMITED
10/01/2026 17:42
Trại giam Phú Sơn 4 publishes the plan Buy necessities for the first 6 months of 2026 for inmates of Phu Son 4 Prison with 4 bidding package .
10/01/2026 11:20
Trại giam Phú Sơn 4 announced the results of the bid package Bidding Package No. 02: Consulting on preparation of Requirements Documents, evaluation of preparation of Proposal Documents for goods procurement packages .
- Winning bidder: MK VIET NAM CONSULTING AND CONSTRUCTION COMPANY LIMITED
08/01/2026 15:59
Trại giam Phú Sơn 4 publishes the plan Procurement of necessities for the first 6 months of 2026 to serve prisoners at Phu Son 4 Prison with 2 bidding package .
08/01/2026 15:54
Trại giam Phú Sơn 4 announced the results of the bid package Package No. 01: Supplying fuel for the first 6 months of 2026 for Phu Son 4 Prison .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ THÀNH HƯNG THÁI NGUYÊN
07/01/2026 15:25
Trại giam Phú Sơn 4 announced the results of the bid package Purchase fire prevention, fire fighting and rescue supplies in 2025 .
- Winning bidder: HỘ KINH DOANH BÀN THỊ THỦY
30/12/2025 10:04
Trại giam Phú Sơn 4 announced the results of the bid package Buying renovated materials K1 .
- Winning bidder: CÔNG TY TNHH TÔN THÉP ÁNH DƯƠNG
30/12/2025 09:33
Trại giam Phú Sơn 4 publishes the plan Buying renovated materials K1 with 1 bidding package .
30/12/2025 09:32
Trại giam Phú Sơn 4 publishes the plan Purchase fire prevention, fire fighting and rescue supplies in 2025 with 1 bidding package .
30/12/2025 09:32
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trại giam Phú Sơn 4 has posted 209 of the contractor selection plan, which contains 268 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trại giam Phú Sơn 4 has posted 52 Tender Notices in 48 bidding packages. Among these, 52 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trại giam Phú Sơn 4 has posted 207 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 207 package, canceled the bid 0 package (among the bidding packages above).
- There are 162 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trại giam Phú Sơn 4 has a relationship with 74 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trại giam Phú Sơn 4 has a relationship with 23 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trại giam Phú Sơn 4 has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects