Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRUNG ĐOÀN 292. as follows:
- Has relationships with 1 project owners.
- Has relationships with 10 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 39 contractor selection plans with a total of 33 bidding packages, of which 39 prequalification documents have not found the investment project.
- Has invited bids for 26 packages (with 27 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 34 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 8 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.04 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 7,023,297,950 VND, of which the total winning bid value is: 6,814,605,330 VND.
- The savings rate is: 2.97%.
Data analysis results of DauThau.info software for bid solicitors TRUNG ĐOÀN 292. as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 1.04 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 7,023,297,950 VND, in which the total winning value is: 6,814,605,330 VND.
- The savings rate is: 2.97%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRUNG ĐOÀN 292. are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 42 contractor selection plans, of which 38 were self-published, and 4 were published by other entities.
- Is the investor of 28 Tender Notices, of which 27 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRUNG ĐOÀN 292. publishes the plan Procurement of VTHH to repair and upgrade petroleum storage systems of units with 1 bidding package .
13/01/2026 08:52
TRUNG ĐOÀN 292. announced the results of the bid package VTHH shopping for units .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ MINH HIẾU
30/09/2025 09:29
TRUNG ĐOÀN 292. publishes the plan VTHH shopping for units with 1 bidding package .
26/09/2025 14:15
TRUNG ĐOÀN 292. announced the results of the bid package VTHH shopping, equipment operating in PK-KQ .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ MINH HIẾU
11/08/2025 15:28
TRUNG ĐOÀN 292. publishes Tender Notice VTHH shopping, equipment operating in PK-KQ in the form Competitive Offer .
01/08/2025 10:00
TRUNG ĐOÀN 292. publishes the plan VTHH shopping, equipment operating in PK-KQ with 1 bidding package .
01/08/2025 08:50
TRUNG ĐOÀN 292. announced the results of the bid package VTHH shopping consolidated equipment equipment .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ MINH HIẾU
17/07/2025 15:29
TRUNG ĐOÀN 292. publishes the plan Provide VTHH, consolidate repair equipment equipment with 1 bidding package .
11/07/2025 14:53
The Bid solicitor TRUNG ĐOÀN 292. has posted the results of the bidding package VTHH shopping guarantee for SSC, QLVT of the investor TRUNG ĐOÀN 292..
10/06/2025 16:33
The Bid solicitor TRUNG ĐOÀN 292. has posted the results of the bidding package Buying fuel decentralized phase 2 in 2025 of the investor TRUNG ĐOÀN 292..
- Winning bidder: CÔNG TY TNHH XĂNG DẦU THUẬN HƯNG
10/06/2025 15:52
The data sheet has been partially hidden, to see the full information please Login or Register
TRUNG ĐOÀN 292. announced the results of the bid package VTHH shopping guarantee for SSC, QLVT .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ MINH HIẾU
10/06/2025 16:33
TRUNG ĐOÀN 292. announced the results of the bid package Buying fuel decentralized phase 2 in 2025 .
- Winning bidder: CÔNG TY TNHH XĂNG DẦU THUẬN HƯNG
10/06/2025 15:52
TRUNG ĐOÀN 292. publishes the plan Buying fuel decentralized phase 2 in 2025 with 1 bidding package .
05/06/2025 15:02
TRUNG ĐOÀN 292. publishes the plan VTHH shopping guarantee for SSC, QLVT with 1 bidding package .
05/06/2025 14:26
TRUNG ĐOÀN 292. announced the results of the bid package VTHH shopping for technical equipment in 2025 .
- Winning bidder: HỘ KINH DOANH VĨNH THÁI
12/05/2025 10:12
TRUNG ĐOÀN 292. announced the results of the bid package VTHH shopping for preservation, maintenance and repair of radio air conditioners .
- Winning bidder: HỘ KINH DOANH HÒA DŨNG
09/05/2025 16:50
TRUNG ĐOÀN 292. announced the results of the bid package VTHH shopping for minor weapons .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ MINH HIẾU
09/05/2025 15:38
TRUNG ĐOÀN 292. publishes the plan VTHH shopping for technical equipment in 2025 with 1 bidding package .
07/05/2025 07:22
TRUNG ĐOÀN 292. publishes the plan VTHH shopping for preservation, maintenance and repair of radio air conditioners with 1 bidding package .
05/05/2025 16:18
TRUNG ĐOÀN 292. publishes the plan VTHH shopping for minor weapons with 1 bidding package .
05/05/2025 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
TRUNG ĐOÀN 292. publishes the plan Procurement of VTHH to repair and upgrade petroleum storage systems of units with 1 bidding package .
13/01/2026 08:52
TRUNG ĐOÀN 292. announced the results of the bid package VTHH shopping for units .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ MINH HIẾU
30/09/2025 09:29
TRUNG ĐOÀN 292. publishes the plan VTHH shopping for units with 1 bidding package .
26/09/2025 14:15
TRUNG ĐOÀN 292. announced the results of the bid package VTHH shopping, equipment operating in PK-KQ .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ MINH HIẾU
11/08/2025 15:28
TRUNG ĐOÀN 292. publishes Tender Notice VTHH shopping, equipment operating in PK-KQ in the form Competitive Offer .
01/08/2025 10:00
TRUNG ĐOÀN 292. publishes the plan VTHH shopping, equipment operating in PK-KQ with 1 bidding package .
01/08/2025 08:50
TRUNG ĐOÀN 292. announced the results of the bid package VTHH shopping consolidated equipment equipment .
- Winning bidder: HỘ KINH DOANH NGUYỄN THỊ MINH HIẾU
17/07/2025 15:29
TRUNG ĐOÀN 292. publishes the plan Provide VTHH, consolidate repair equipment equipment with 1 bidding package .
11/07/2025 14:53
The Bid solicitor TRUNG ĐOÀN 292. has posted the results of the bidding package VTHH shopping guarantee for SSC, QLVT of the investor TRUNG ĐOÀN 292..
10/06/2025 16:33
The Bid solicitor TRUNG ĐOÀN 292. has posted the results of the bidding package Buying fuel decentralized phase 2 in 2025 of the investor TRUNG ĐOÀN 292..
- Winning bidder: CÔNG TY TNHH XĂNG DẦU THUẬN HƯNG
10/06/2025 15:52
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRUNG ĐOÀN 292. has posted 39 of the contractor selection plan, which contains 33 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRUNG ĐOÀN 292. has posted 27 Tender Notices in 26 bidding packages. Among these, 27 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRUNG ĐOÀN 292. has posted 34 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 34 package, canceled the bid 0 package (among the bidding packages above).
- There are 8 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRUNG ĐOÀN 292. has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRUNG ĐOÀN 292. has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects