Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trung tâm GDNN - GDTX Tiên Lữ as follows:
- Has relationships with 1 project owners.
- Has relationships with 15 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 14 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 12 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 11 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,508,796,000 VND, of which the total winning bid value is: 1,464,486,000 VND.
- The savings rate is: 2.94%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm GDNN - GDTX Tiên Lữ as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,508,796,000 VND, in which the total winning value is: 1,464,486,000 VND.
- The savings rate is: 2.94%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trung tâm GDNN - GDTX Tiên Lữ are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 14 contractor selection plans, of which 7 were self-published, and 7 were published by other entities.
- Is the investor of 2 Tender Notices, of which 1 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan Buy Casper air conditioner with 1 bidding package .
25/12/2025 14:26
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan Buy Casper air conditioner with 1 bidding package .
20/12/2025 15:12
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan First Education and Training Center - Education and Education with 1 bidding package .
20/12/2025 15:11
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Buy two-seat tables and chairs, anti-glare boards, and stainless steel chairs to serve teaching activities .
- Winning bidder: HỘ KINH DOANH LÃ HUY TRUNG
05/12/2025 08:51
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan Buy two-seat tables and chairs, anti-glare boards, and stainless steel chairs to serve teaching activities with 1 bidding package .
02/12/2025 14:59
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI NTP
04/10/2025 10:16
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Project Management Consulting .
- Winning bidder: PHUC MINH HUNG CONSULTANCY CONSTRUCTION COMPANY LIMITED
04/10/2025 10:14
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Civil Works .
- Winning bidder: AN VIEN PHAT CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
04/10/2025 10:13
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan Plan for selecting contractors for construction of Bao Duong works, repairing shacks for students and shared toilet areas with 3 bidding package .
04/10/2025 10:10
Investor Trung tâm GDNN - GDTX Tiên Lữ has posted an investment and development project Bao Duong, repairing shacks for student cars and shared toilet areas.
04/10/2025 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN KIẾN TRÚC XÂY DỰNG ĐỨC MINH
10/03/2025 11:40
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ DỊCH VỤ TOÀN THẮNG HƯNG YÊN
10/03/2025 11:37
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Civil Works .
- Winning bidder: MEA CONSTRUCTION AND TRADING COMPANY LIMITED
10/03/2025 11:35
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan Plan for selecting contractors for repairing the school yard and drainage system with 3 bidding package .
10/03/2025 11:30
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Shopping for teaching equipment .
- Winning bidder: AN DUC TRADING COMPANY LIMITED
26/02/2025 19:25
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan Shopping for teaching equipment with 1 bidding package .
26/02/2025 19:13
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Package No. 3: Strengthening the facilities of Tien Lu Vocational and Continuing Education Center in 2024 .
- Winning bidder: PHUC HUNG TECHNOLOGY AND TRADING COMPANY LIMITED
12/12/2024 19:37
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bidding package Tender package No 3: Strengthening the facilities of Tien Lu Vocational and Continuing Education Center in 2024 with 1 participating contractors .
05/12/2024 10:47
Trung tâm GDNN - GDTX Tiên Lữ publishes Tender Notice Tender package No 3: Strengthening the facilities of Tien Lu Vocational and Continuing Education Center in 2024 in the form Competitive Offer .
28/11/2024 10:15
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Tender package No 01: Consultancy on preparation of Bid Documents, Bid evaluation .
- Winning bidder: BACH VIET INVESTMENT CONSULTING AND CONSTRUCTION TRADING COMPANY LIMITED
20/11/2024 15:21
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan Buy Casper air conditioner with 1 bidding package .
25/12/2025 14:26
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan Buy Casper air conditioner with 1 bidding package .
20/12/2025 15:12
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan First Education and Training Center - Education and Education with 1 bidding package .
20/12/2025 15:11
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Buy two-seat tables and chairs, anti-glare boards, and stainless steel chairs to serve teaching activities .
- Winning bidder: HỘ KINH DOANH LÃ HUY TRUNG
05/12/2025 08:51
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan Buy two-seat tables and chairs, anti-glare boards, and stainless steel chairs to serve teaching activities with 1 bidding package .
02/12/2025 14:59
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI NTP
04/10/2025 10:16
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Project Management Consulting .
- Winning bidder: PHUC MINH HUNG CONSULTANCY CONSTRUCTION COMPANY LIMITED
04/10/2025 10:14
Trung tâm GDNN - GDTX Tiên Lữ announced the results of the bid package Civil Works .
- Winning bidder: AN VIEN PHAT CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
04/10/2025 10:13
Trung tâm GDNN - GDTX Tiên Lữ publishes the plan Plan for selecting contractors for construction of Bao Duong works, repairing shacks for students and shared toilet areas with 3 bidding package .
04/10/2025 10:10
Investor Trung tâm GDNN - GDTX Tiên Lữ has posted an investment and development project Bao Duong, repairing shacks for student cars and shared toilet areas.
04/10/2025 10:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm GDNN - GDTX Tiên Lữ has posted 7 of the contractor selection plan, which contains 14 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trung tâm GDNN - GDTX Tiên Lữ has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm GDNN - GDTX Tiên Lữ has posted 12 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 12 package, canceled the bid 0 package (among the bidding packages above).
- There are 11 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trung tâm GDNN - GDTX Tiên Lữ has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm GDNN - GDTX Tiên Lữ has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trung tâm GDNN - GDTX Tiên Lữ has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects