Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn as follows:
- Has relationships with 47 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 59 contractor selection plans with a total of 146 bidding packages, of which 11 prequalification documents have not found the investment project.
- Has invited bids for 27 packages (with 29 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 54 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 31 packages with results that do not have tender notice or prequalification notice.
- There are 89 packages that have not fully posted the contractor selection results. Of these 85 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.47 contractors.
- Breakdown by bidding field: Goods 0%, Construction 86.21%, Consultancy 13.79%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 127,908,287,505 VND, of which the total winning bid value is: 124,787,635,014 VND.
- The savings rate is: 2.44%.
Data analysis results of DauThau.info software for bid solicitors Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn as follows:
- Has relationships with 47 contractor.
- The average number of contractors participating in each bidding package is: 1.47 contractors.
- Proportion of bidding fields: Goods 0%, Construction 86.21%, Consulting 13.79%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 127,908,287,505 VND, in which the total winning value is: 124,787,635,014 VND.
- The savings rate is: 2.44%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 3 Contractor selection plan in which 3 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 0 bidding packages in which 0 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the results of the bidding package Package No. 2: Cadastral grid; Measure, draw, establish cadastral maps at scale 1 1000 of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn.
07/09/2022 15:52
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Urban planning in the stage of establishing the VTC in Dong Lai area, Quang Tien commune of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 3 bidding package.
06/09/2022 16:20
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Plan for selecting contractors for a number of consulting bidding packages of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 2 bidding package.
31/08/2022 13:57
Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted Tender Notice Tender package No 2: Cadastral grid; Measure, draw, establish cadastral maps at scale 1 1000 of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with the form National competitive bidding.
19/08/2022 11:22
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Construction and return of roads and ditches for people's living in service of site clearance for construction investment projects Head office of State Treasury Soc Son, Hanoi of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 2 bidding package.
16/08/2022 20:17
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Contractor selection plan of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 3 bidding package.
13/08/2022 10:31
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Construction contractor selection plan of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 2 bidding package.
10/08/2022 16:29
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Contractor selection plan of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 2 bidding package.
30/07/2022 17:39
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Contractor selection plan of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 2 bidding package.
30/07/2022 09:27
Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted Tender Notice Tender package No 2: Cadastral grid; Measure, draw, establish cadastral maps at scale 1 1000 of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with the form National competitive bidding.
29/07/2022 07:45
The data sheet has been partially hidden, to see the full information please Login or Register
Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn announced the results of the bid package Package No. 2: Cadastral grid; Measure, draw, establish cadastral maps at scale 1 1000 .
- Winning bidder: Công ty Cổ phần Tư vấn Đầu tư xây dựng và Thương mại tổng hợp ATM
07/09/2022 15:52
Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn publishes the plan Urban planning in the stage of establishing the VTC in Dong Lai area, Quang Tien commune with 3 bidding package .
06/09/2022 16:20
Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn announced the results of the bidding package Tender package No 2: Cadastral grid; Measure, draw, establish cadastral maps at scale 1 1000 with 1 participating contractors .
31/08/2022 15:11
Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn publishes the plan Plan for selecting contractors for a number of consulting bidding packages with 2 bidding package .
31/08/2022 13:57
Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn publishes Tender Notice Tender package No 2: Cadastral grid; Measure, draw, establish cadastral maps at scale 1 1000 in the form National competitive bidding .
19/08/2022 11:22
Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn publishes the plan Construction and return of roads and ditches for people's living in service of site clearance for construction investment projects Head office of State Treasury Soc Son, Hanoi with 2 bidding package .
16/08/2022 20:17
Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn publishes the plan Contractor selection plan with 3 bidding package .
13/08/2022 10:31
Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn publishes the plan Construction contractor selection plan with 2 bidding package .
10/08/2022 16:29
Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn publishes the plan Contractor selection plan with 2 bidding package .
30/07/2022 17:39
Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn publishes the plan Contractor selection plan with 2 bidding package .
30/07/2022 09:27
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the results of the bidding package Package No. 2: Cadastral grid; Measure, draw, establish cadastral maps at scale 1 1000 of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn.
07/09/2022 15:52
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Urban planning in the stage of establishing the VTC in Dong Lai area, Quang Tien commune of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 3 bidding package.
06/09/2022 16:20
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Plan for selecting contractors for a number of consulting bidding packages of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 2 bidding package.
31/08/2022 13:57
Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted Tender Notice Tender package No 2: Cadastral grid; Measure, draw, establish cadastral maps at scale 1 1000 of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with the form National competitive bidding.
19/08/2022 11:22
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Construction and return of roads and ditches for people's living in service of site clearance for construction investment projects Head office of State Treasury Soc Son, Hanoi of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 2 bidding package.
16/08/2022 20:17
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Contractor selection plan of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 3 bidding package.
13/08/2022 10:31
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Construction contractor selection plan of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 2 bidding package.
10/08/2022 16:29
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Contractor selection plan of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 2 bidding package.
30/07/2022 17:39
The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted the request Contractor selection plan of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with 2 bidding package.
30/07/2022 09:27
Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted Tender Notice Tender package No 2: Cadastral grid; Measure, draw, establish cadastral maps at scale 1 1000 of the investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn with the form National competitive bidding.
29/07/2022 07:45
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted 59 of the contractor selection plan, which contains 146 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted 29 Tender Notice in the 27 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has posted 54 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 54 package, canceled the bid 0 package (among the bidding packages above).
- There are 31 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has a relationship with 47 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn is the owner of 3 contractor selection plan. In which, they self-invite 3 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn is an investor with 44 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Trung tâm Phát triển qũy đất huyện Sóc Sơn thuộc UBND huyện Sóc Sơn is the investor of 0 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code