Data analysis results of DauThau.info software for bid solicitors TRUNGSON HYDROPOWER COMPANY LIMITED as follows:
- Has relationships with 1 project owners.
- Has relationships with 187 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 49 contractor selection plans with a total of 133 bidding packages, of which 47 prequalification documents have not found the investment project.
- Has invited bids for 128 packages (with 132 tender notices), and conducted prequalification for 0 packages.
- There are 21 bidding packages with content that needs clarification.
- Announced the results of 125 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 5 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 11 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.41 contractors.
- Breakdown by bidding field: Goods 40.15%, Construction 18.18%, Consultancy 10.61%, Non-consultancy 31.06%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 236,679,478,583 VND, of which the total winning bid value is: 208,254,540,935 VND.
- The savings rate is: 12.01%.
Data analysis results of DauThau.info software for bid solicitors TRUNGSON HYDROPOWER COMPANY LIMITED as follows:
- Has relationships with 187 contractor.
- The average number of contractors participating in each bidding package is: 2.41 contractors.
- Proportion of bidding fields: Goods 40.15%, Construction 18.18%, Consulting 10.61%, Non-consulting 31.06%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 236,679,478,583 VND, in which the total winning value is: 208,254,540,935 VND.
- The savings rate is: 12.01%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRUNGSON HYDROPOWER COMPANY LIMITED are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 42 contractor selection plans, of which 33 were self-published, and 9 were published by other entities.
- Is the investor of 152 Tender Notices, of which 132 were self-invited, and 20 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor TRUNGSON HYDROPOWER COMPANY LIMITED has posted the results of the bidding package 25.HH-42 “Supply of materials and equipment for maintenance of downstream warning system (EPP) of Trung Son Hydropower Plant” of the investor TRUNGSON HYDROPOWER COMPANY LIMITED.
31/12/2025 09:16
The Bid solicitor TRUNGSON HYDROPOWER COMPANY LIMITED has posted the results of the bidding package 25.HH-41 “Supply of materials and equipment for maintenance of fire protection system - Trung Son hydroelectric power plant” of the investor TRUNGSON HYDROPOWER COMPANY LIMITED.
- Winning bidder: Công ty Cổ Phần Năng Lượng Fcom
31/12/2025 09:15
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.TV-38 "Consulting on conversion monitoring and deformation of the 9-year 9-year cycle- Trung Son Hydroelectric Plant" .
- Winning bidder: ELECTRIC CONSTRUCTION AND COMMERCE COMPANY LIMITED
29/12/2025 22:37
TRUNGSON HYDROPOWER COMPANY LIMITED publishes Tender Notice 25.HH-42 “Supply of materials and equipment for maintenance of downstream warning system (EPP) of Trung Son Hydropower Plant” in the form Simplified Online Bidding .
18/12/2025 14:19
TRUNGSON HYDROPOWER COMPANY LIMITED publishes Tender Notice 25.HH-41 “Supply of materials and equipment for maintenance of fire protection system - Trung Son hydroelectric power plant” in the form Simplified Online Bidding .
18/12/2025 14:18
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.DV-40 “Providing services to scan and remove malicious code and handle weaknesses and security holes to ensure information security of information systems at Trung Son Hydropower Company Limited in 2025” .
- Winning bidder: SOFTWARE DEVELOPMENT AND TECHNOLOGY PROMOTION JOINT STOCK COMPANY
18/12/2025 09:35
TRUNGSON HYDROPOWER COMPANY LIMITED publishes the plan Contractor selection plan (KHLCNT) for the 10th round of bidding packages in 2025 - Trung Son Hydropower Plant with 3 bidding package .
04/12/2025 15:44
The Bid solicitor TRUNGSON HYDROPOWER COMPANY LIMITED has posted the results of the bidding package 25.HH-28 "Procurement of 07-seat cars for the production and business of Trung Son Hydroelectric Company Limited" of the investor TRUNGSON HYDROPOWER COMPANY LIMITED.
- Winning bidder: TOYOTA THANG LONG JOINT STOCK COMPANY
26/11/2025 09:00
TRUNGSON HYDROPOWER COMPANY LIMITED publishes Tender Notice 25.HH-28 "Procurement of 07-seat cars for the production and business of Trung Son Hydroelectric Company Limited" in the form Simplified Online Bidding .
17/11/2025 10:59
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.TV -27 "Advice on environmental licensing - Trung Son Hydroelectric Plant" .
- Winning bidder: Institute of Technique and Enviromental Technology
13/11/2025 14:02
The data sheet has been partially hidden, to see the full information please Login or Register
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.HH-42 “Supply of materials and equipment for maintenance of downstream warning system (EPP) of Trung Son Hydropower Plant” .
- Winning bidder: Công ty Cổ Phần Năng Lượng Fcom
31/12/2025 09:16
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.HH-41 “Supply of materials and equipment for maintenance of fire protection system - Trung Son hydroelectric power plant” .
- Winning bidder: Công ty Cổ Phần Năng Lượng Fcom
31/12/2025 09:15
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.HH-28 "Procurement of 07-seat cars for the production and business of Trung Son Hydroelectric Company Limited" .
- Winning bidder: TOYOTA THANG LONG JOINT STOCK COMPANY
26/11/2025 09:00
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.HH-29 "Supply and install the package of air conditioning system to cool the cabinet control cabinet control system, 220kV distribution station operators, spillway operators, repair office repair rooms, operating teams, cold storage warehouses" .
- Winning bidder: GLOBAL TELECOMMUNICATION AND TECHNOLOGY COOPERATION JOINT STOCK COMPANY
20/10/2025 23:56
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.TV-20.SCL-07 "Survey consultancy, Economic and technical report on waterproofing of expansion slots (coupling) K12, K14 Dam Dam, Overflow-CTT Trung Son" .
- Winning bidder: VietNam Institute for Building Science and Technology
29/08/2025 09:45
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.DV-16 ”provides security services, cooking services, drivers, maintenance and repair staff in 2025 of Trung Son Hydroelectric Company Limited” .
- Winning bidder: CÔNG TY CỔ PHẦN DỊCH VỤ BẢO VỆ CHUYÊN NGHIỆP AN NINH MIỀN BẮC
22/08/2025 14:12
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 24.XL-48 "Construction of the fire prevention and fighting system of equipment- Trung Son Hydroelectric Plant" .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TMDV ĐỒNG TÂM
31/07/2025 10:19
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bidding package 25.DV-16 ”provides security services, cooking services, drivers, maintenance and repair staff in 2025 of Trung Son Hydroelectric Company Limited” with 1 participating contractors .
15/07/2025 10:41
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bidding package 25.TV-20.SCL-07 "Survey consultancy, Economic and technical report on waterproofing of expansion slots (coupling) K12, K14 Dam Dam, Overflow-CTT Trung Son" with 2 participating contractors .
14/07/2025 11:08
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.HH-07 "Renewing License and supporting/ maintenance services Firewall in TSHPCO in 2025" .
- Winning bidder: TECHNOLOGY DEVELOPMENT AND APPLY SOLUTION PROVIDER JOINT STOCK COMPANY
10/07/2025 09:35
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor TRUNGSON HYDROPOWER COMPANY LIMITED has posted the results of the bidding package 25.HH-42 “Supply of materials and equipment for maintenance of downstream warning system (EPP) of Trung Son Hydropower Plant” of the investor TRUNGSON HYDROPOWER COMPANY LIMITED.
31/12/2025 09:16
The Bid solicitor TRUNGSON HYDROPOWER COMPANY LIMITED has posted the results of the bidding package 25.HH-41 “Supply of materials and equipment for maintenance of fire protection system - Trung Son hydroelectric power plant” of the investor TRUNGSON HYDROPOWER COMPANY LIMITED.
- Winning bidder: Công ty Cổ Phần Năng Lượng Fcom
31/12/2025 09:15
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.TV-38 "Consulting on conversion monitoring and deformation of the 9-year 9-year cycle- Trung Son Hydroelectric Plant" .
- Winning bidder: ELECTRIC CONSTRUCTION AND COMMERCE COMPANY LIMITED
29/12/2025 22:37
TRUNGSON HYDROPOWER COMPANY LIMITED publishes Tender Notice 25.HH-42 “Supply of materials and equipment for maintenance of downstream warning system (EPP) of Trung Son Hydropower Plant” in the form Simplified Online Bidding .
18/12/2025 14:19
TRUNGSON HYDROPOWER COMPANY LIMITED publishes Tender Notice 25.HH-41 “Supply of materials and equipment for maintenance of fire protection system - Trung Son hydroelectric power plant” in the form Simplified Online Bidding .
18/12/2025 14:18
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.DV-40 “Providing services to scan and remove malicious code and handle weaknesses and security holes to ensure information security of information systems at Trung Son Hydropower Company Limited in 2025” .
- Winning bidder: SOFTWARE DEVELOPMENT AND TECHNOLOGY PROMOTION JOINT STOCK COMPANY
18/12/2025 09:35
TRUNGSON HYDROPOWER COMPANY LIMITED publishes the plan Contractor selection plan (KHLCNT) for the 10th round of bidding packages in 2025 - Trung Son Hydropower Plant with 3 bidding package .
04/12/2025 15:44
The Bid solicitor TRUNGSON HYDROPOWER COMPANY LIMITED has posted the results of the bidding package 25.HH-28 "Procurement of 07-seat cars for the production and business of Trung Son Hydroelectric Company Limited" of the investor TRUNGSON HYDROPOWER COMPANY LIMITED.
- Winning bidder: TOYOTA THANG LONG JOINT STOCK COMPANY
26/11/2025 09:00
TRUNGSON HYDROPOWER COMPANY LIMITED publishes Tender Notice 25.HH-28 "Procurement of 07-seat cars for the production and business of Trung Son Hydroelectric Company Limited" in the form Simplified Online Bidding .
17/11/2025 10:59
TRUNGSON HYDROPOWER COMPANY LIMITED announced the results of the bid package 25.TV -27 "Advice on environmental licensing - Trung Son Hydroelectric Plant" .
- Winning bidder: Institute of Technique and Enviromental Technology
13/11/2025 14:02
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRUNGSON HYDROPOWER COMPANY LIMITED has posted 49 of the contractor selection plan, which contains 133 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor TRUNGSON HYDROPOWER COMPANY LIMITED has posted 132 Tender Notices in 128 bidding packages. Among these, 132 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRUNGSON HYDROPOWER COMPANY LIMITED has posted 125 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 125 package, canceled the bid 0 package (among the bidding packages above).
- There are 5 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRUNGSON HYDROPOWER COMPANY LIMITED has a relationship with 187 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRUNGSON HYDROPOWER COMPANY LIMITED has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRUNGSON HYDROPOWER COMPANY LIMITED has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects