Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON 10 as follows:
- Has relationships with 1 project owners.
- Has relationships with 13 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 3 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 823,930,676 VND, of which the total winning bid value is: 823,930,676 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON 10 as follows:
- Has relationships with 13 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 823,930,676 VND, in which the total winning value is: 823,930,676 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON 10 are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 4 contractor selection plans, of which 1 were self-published, and 3 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON 10 announced the results of the bid package Package No. 04: Construction insurance .
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
18/05/2026 17:12
TRƯỜNG MẦM NON 10 announced the results of the bid package Tender package No 02: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG ĐĂNG KHOA GROUP
18/05/2026 17:08
TRƯỜNG MẦM NON 10 announced the results of the bid package Tender package No 01: Project management consulting .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGUYỄN PHONG NĐ
18/05/2026 17:06
TRƯỜNG MẦM NON 10 announced the results of the bid package Tender package No 03: Construction work .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NHẬT MINH LÂM ĐỒNG
18/05/2026 17:04
TRƯỜNG MẦM NON 10 publishes the plan Construction of rear fence, drainage system, door replacement, waterproofing of classroom block of Kindergarten 10, Xuan Huong ward - Da Lat with 4 bidding package .
18/05/2026 17:01
Investor TRƯỜNG MẦM NON 10 has posted an investment and development project Construction of rear fence, drainage system, door replacement, waterproofing of classroom block of Kindergarten 10, Xuan Huong ward - Da Lat.
18/05/2026 16:16
TRƯỜNG MẦM NON 10 announced the results of the bid package Providing food, raw materials, and fuel to organize boarding for children at Kindergarten 10 for the second semester of the 2025-2026 school year .
- Winning bidder: HỘ KINH DOANH PHẠM THỊ THUẬN
30/12/2025 15:31
TRƯỜNG MẦM NON 10 announced the results of the bid package Providing food, raw materials, and fuel to organize boarding for children at Kindergarten 10 for the second semester of the 2025-2026 school year .
- Winning bidder: YAKULT VIETNAM CO., LTD
30/12/2025 15:27
TRƯỜNG MẦM NON 10 announced the results of the bid package Providing food, raw materials, and fuel to organize boarding for children at Kindergarten 10 for the second semester of the 2025-2026 school year .
- Winning bidder: CÔNG TY TNHH TÂN GIA NGUYÊN
30/12/2025 15:23
TRƯỜNG MẦM NON 10 announced the results of the bid package Providing food, raw materials, and fuel to organize boarding for children at Kindergarten 10 for the second semester of the 2025-2026 school year .
- Winning bidder: Trần Thị Út
30/12/2025 15:20
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON 10 announced the results of the bid package Package 03: Cost of construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XÂY DỰNG TRIỀU AN
12/05/2025 15:52
TRƯỜNG MẦM NON 10 announced the results of the bid package Package 02: Cost of project management consulting .
- Winning bidder: CÔNG TY TNHH HƯNG DŨNG LÂM ĐỒNG
12/05/2025 15:51
TRƯỜNG MẦM NON 10 announced the results of the bid package Package No. 01: Construction and repair of classrooms, kitchen, internal roads (Hong Lac signal) .
- Winning bidder: THANH DAT PHAT CONTRUCT DESIGN CONSULTANCY COMPANY LIMITED
12/05/2025 15:49
TRƯỜNG MẦM NON 10 publishes the plan Preschool 10; Category: Repairing classrooms, kitchen, internal road yard (Hong Lac signal) with 3 bidding package .
11/05/2025 10:15
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON 10 announced the results of the bid package Package No. 04: Construction insurance .
- Winning bidder: Tổng Công ty Cổ phần Bảo hiểm Ngân hàng Đầu tư và Phát triển Việt Nam
18/05/2026 17:12
TRƯỜNG MẦM NON 10 announced the results of the bid package Tender package No 02: Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG ĐĂNG KHOA GROUP
18/05/2026 17:08
TRƯỜNG MẦM NON 10 announced the results of the bid package Tender package No 01: Project management consulting .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGUYỄN PHONG NĐ
18/05/2026 17:06
TRƯỜNG MẦM NON 10 announced the results of the bid package Tender package No 03: Construction work .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NHẬT MINH LÂM ĐỒNG
18/05/2026 17:04
TRƯỜNG MẦM NON 10 publishes the plan Construction of rear fence, drainage system, door replacement, waterproofing of classroom block of Kindergarten 10, Xuan Huong ward - Da Lat with 4 bidding package .
18/05/2026 17:01
Investor TRƯỜNG MẦM NON 10 has posted an investment and development project Construction of rear fence, drainage system, door replacement, waterproofing of classroom block of Kindergarten 10, Xuan Huong ward - Da Lat.
18/05/2026 16:16
TRƯỜNG MẦM NON 10 announced the results of the bid package Providing food, raw materials, and fuel to organize boarding for children at Kindergarten 10 for the second semester of the 2025-2026 school year .
- Winning bidder: HỘ KINH DOANH PHẠM THỊ THUẬN
30/12/2025 15:31
TRƯỜNG MẦM NON 10 announced the results of the bid package Providing food, raw materials, and fuel to organize boarding for children at Kindergarten 10 for the second semester of the 2025-2026 school year .
- Winning bidder: YAKULT VIETNAM CO., LTD
30/12/2025 15:27
TRƯỜNG MẦM NON 10 announced the results of the bid package Providing food, raw materials, and fuel to organize boarding for children at Kindergarten 10 for the second semester of the 2025-2026 school year .
- Winning bidder: CÔNG TY TNHH TÂN GIA NGUYÊN
30/12/2025 15:23
TRƯỜNG MẦM NON 10 announced the results of the bid package Providing food, raw materials, and fuel to organize boarding for children at Kindergarten 10 for the second semester of the 2025-2026 school year .
- Winning bidder: Trần Thị Út
30/12/2025 15:20
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON 10 has posted 1 of the contractor selection plan, which contains 3 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG MẦM NON 10 has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON 10 has a relationship with 13 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON 10 has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects