Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON BẠCH ĐẰNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 6 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 7 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,075,964,000 VND, of which the total winning bid value is: 1,075,964,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON BẠCH ĐẰNG as follows:
- Has relationships with 6 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,075,964,000 VND, in which the total winning value is: 1,075,964,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON BẠCH ĐẰNG are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 15 contractor selection plans, of which 6 were self-published, and 9 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package Installing sunshades at preschools for the 2025-2026 school year for Bach Dang Kindergarten .
- Winning bidder: HỘ KINH DOANH TRỊNH XUÂN DUY
10/07/2026 08:36
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Installing sunshades at preschools for the 2025-2026 school year for Bach Dang Kindergarten with 1 bidding package .
08/07/2026 10:02
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Project investment preparation step: Covering the practice yard, purchasing teaching equipment for Bach Dang Kindergarten with 2 bidding package .
26/05/2026 09:40
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package No. 04: Consulting on construction supervision + equipment installation .
- Winning bidder: TRUONG AN VERIFY & CONSUNTANCY JOINT STOCK COMPANY
26/05/2026 09:36
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package Number 03: Project management consulting .
- Winning bidder: NORTHERN TRADING AND CONSTRUCTION JOINT STOCK COMPANY
26/05/2026 09:33
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package No. 05: Construction + equipment installation .
- Winning bidder: NGUYEN TUAN COMPANY LIMITED
26/05/2026 09:29
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Covering the practice yard, purchasing teaching equipment for Bach Dang Kindergarten with 5 bidding package .
26/05/2026 09:25
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package No. 02: Consulting on verification of construction drawings + estimates .
- Winning bidder: HOANG MINH CONSTRUCTION DESIGN AND TRADING CORPORATION
26/05/2026 09:09
Investor TRƯỜNG MẦM NON BẠCH ĐẰNG has posted an investment and development project Covering the practice yard, purchasing teaching equipment for Bach Dang Kindergarten.
26/05/2026 09:09
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package No. 01: Making technical economic reports .
- Winning bidder: TRUONG AN VERIFY & CONSUNTANCY JOINT STOCK COMPANY
26/05/2026 09:04
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package Fix classrooms and yards for Bach Dang Kindergarten .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ HOÀNG NGÂN
04/07/2025 15:52
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Fix classrooms and yards for Bach Dang Kindergarten with 1 bidding package .
04/07/2025 15:49
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package Buy food for semi-boarding kitchen for the secondary school year 2024-2025 .
- Winning bidder: CÔNG TY TNHH TUYẾT NGỌC
27/02/2025 14:40
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Buy food for semi-boarding kitchen for the secondary school year 2024-2025 with 1 bidding package .
27/02/2025 14:36
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package Repairing the corrugated iron roof, water tank of the 2-story, 8-room classroom and electrical cables in the central area of Bach Dang Kindergarten after Storm No. 3 .
- Winning bidder: BAO QUYEN VIET NAM TRADING AND PRODUCTION COMPANY LIMITED
23/10/2024 14:21
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Repairing the corrugated iron roof, water tank of the 2-story, 8-room classroom and electrical cables in the central area of Bach Dang Kindergarten after Storm No. 3 with 1 bidding package .
23/10/2024 14:13
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package Repair of corrugated iron roof, main cable, water tank of 2-story 8-room classroom of Bach Dang kindergarten damaged after storm No. 3 .
- Winning bidder: BAO QUYEN VIET NAM TRADING AND PRODUCTION COMPANY LIMITED
21/10/2024 22:47
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Repair of corrugated iron roof, main cable, water tank of 2-story 8-room classroom of Bach Dang kindergarten damaged after storm No. 3 with 1 bidding package .
21/10/2024 22:44
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package Repairing the classroom of Bach Dang kindergarten; Category: 2-storey house with 4 rooms; 2-storey house with 8 rooms (13-24 month old class A, 4 year old class A, 5 year old class B, 5 year old class C) .
- Winning bidder: BAO QUYEN VIET NAM TRADING AND PRODUCTION COMPANY LIMITED
08/07/2024 09:51
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Repairing the classroom of Bach Dang kindergarten
Category: 2-storey house with 4 rooms; 2-storey house with 8 rooms (13-24 month old class A, 4 year old class A, 5 year old class B, 5 year old class C) with 1 bidding package .
08/07/2024 09:43
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package Installing sunshades at preschools for the 2025-2026 school year for Bach Dang Kindergarten .
- Winning bidder: HỘ KINH DOANH TRỊNH XUÂN DUY
10/07/2026 08:36
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Installing sunshades at preschools for the 2025-2026 school year for Bach Dang Kindergarten with 1 bidding package .
08/07/2026 10:02
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Project investment preparation step: Covering the practice yard, purchasing teaching equipment for Bach Dang Kindergarten with 2 bidding package .
26/05/2026 09:40
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package No. 04: Consulting on construction supervision + equipment installation .
- Winning bidder: TRUONG AN VERIFY & CONSUNTANCY JOINT STOCK COMPANY
26/05/2026 09:36
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package Number 03: Project management consulting .
- Winning bidder: NORTHERN TRADING AND CONSTRUCTION JOINT STOCK COMPANY
26/05/2026 09:33
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package No. 05: Construction + equipment installation .
- Winning bidder: NGUYEN TUAN COMPANY LIMITED
26/05/2026 09:29
TRƯỜNG MẦM NON BẠCH ĐẰNG publishes the plan Covering the practice yard, purchasing teaching equipment for Bach Dang Kindergarten with 5 bidding package .
26/05/2026 09:25
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package No. 02: Consulting on verification of construction drawings + estimates .
- Winning bidder: HOANG MINH CONSTRUCTION DESIGN AND TRADING CORPORATION
26/05/2026 09:09
Investor TRƯỜNG MẦM NON BẠCH ĐẰNG has posted an investment and development project Covering the practice yard, purchasing teaching equipment for Bach Dang Kindergarten.
26/05/2026 09:09
TRƯỜNG MẦM NON BẠCH ĐẰNG announced the results of the bid package No. 01: Making technical economic reports .
- Winning bidder: TRUONG AN VERIFY & CONSUNTANCY JOINT STOCK COMPANY
26/05/2026 09:04
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON BẠCH ĐẰNG has posted 7 of the contractor selection plan, which contains 7 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON BẠCH ĐẰNG has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON BẠCH ĐẰNG has a relationship with 6 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON BẠCH ĐẰNG has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects