Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON ĐẠI PHONG as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 1 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 98,000,000 VND, of which the total winning bid value is: 98,000,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON ĐẠI PHONG as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 98,000,000 VND, in which the total winning value is: 98,000,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON ĐẠI PHONG are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 11 contractor selection plans, of which 5 were self-published, and 6 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Renovating premises, constructing and installing STEM classroom furniture with 1 bidding package .
24/07/2026 08:24
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan STEM room learning materials category with 1 bidding package .
22/07/2026 08:04
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Contract package: Technological equipment and electrical infrastructure installation, STEM room network with 1 bidding package .
18/07/2026 12:30
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Providing industrial gas to serve cooking for students in the 2025-2026 school year with 1 bidding package .
26/11/2025 22:37
TRƯỜNG MẦM NON ĐẠI PHONG announced the results of the bid package Approving the results of appointment of food supply package Insurelac in the school year 2025-2026 .
- Winning bidder: CÔNG TY TNHH CHẾ BIẾN THỰC PHẨM THƯƠNG MẠI KHÁNH NGỌC
29/09/2025 14:30
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Insurelac milk supply package price is guaranteed regularly for the school year 2025-2026 with 1 bidding package .
29/09/2025 13:41
TRƯỜNG MẦM NON ĐẠI PHONG announced the results of the bid package Supply food package food price regularly for the first term for the school year 2025-2026 .
- Winning bidder: Công ty TNHH Trần Khôi Quảng Nam
29/09/2025 10:20
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan TRAN KHOI NAM CO., LTD with 1 bidding package .
29/09/2025 09:18
The Bid solicitor TRƯỜNG MẦM NON ĐẠI PHONG has posted the results of the bidding package Construction of works: Dai Phong Kindergarten; Category: Upgrade, concrete and tiled corridors on both sides of the school gate (main cluster) of the investor TRƯỜNG MẦM NON ĐẠI PHONG.
- Winning bidder: CÔNG TY TNHH MTV XÂY DỰNG AN PHƯỚC LỘC
24/03/2025 16:34
The Bid solicitor TRƯỜNG MẦM NON ĐẠI PHONG has posted the request Approving the plan to select the construction contractor: Dai Phong Kindergarten; Category: Upgrade, concrete and tiled corridors on both sides of the school gate (main cluster) of the investor TRƯỜNG MẦM NON ĐẠI PHONG with 1 bidding package.
24/03/2025 16:30
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON ĐẠI PHONG announced the results of the bid package Construction of works: Dai Phong Kindergarten; Category: Upgrade, concrete and tiled corridors on both sides of the school gate (main cluster) .
- Winning bidder: CÔNG TY TNHH MTV XÂY DỰNG AN PHƯỚC LỘC
24/03/2025 16:34
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Approving the plan to select the construction contractor: Dai Phong Kindergarten; Category: Upgrade, concrete and tiled corridors on both sides of the school gate (main cluster) with 1 bidding package .
24/03/2025 16:30
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Approving the plan to select the construction contractor: Dai Phong Kindergarten; Category: Upgrade, concrete and tiled corridors on both sides of the school gate (main cluster) with 1 bidding package .
24/03/2025 16:28
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Approving the plan to select the construction contractor: Dai Phong Kindergarten; Category: Upgrade, concrete and tiled corridors on both sides of the school gate (main cluster) with 1 bidding package .
24/03/2025 16:23
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Approving the plan to select the construction contractor: Dai Phong Kindergarten; Category: Upgrade, concrete and tiled corridors on both sides of the school gate (main cluster) with 1 bidding package .
24/03/2025 16:19
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Approving the plan to select the construction contractor: Dai Phong Kindergarten; Category: Upgrade, concrete and tiled corridors on both sides of the school gate (main cluster) with 1 bidding package .
24/03/2025 14:58
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Renovating premises, constructing and installing STEM classroom furniture with 1 bidding package .
24/07/2026 08:24
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan STEM room learning materials category with 1 bidding package .
22/07/2026 08:04
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Contract package: Technological equipment and electrical infrastructure installation, STEM room network with 1 bidding package .
18/07/2026 12:30
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Providing industrial gas to serve cooking for students in the 2025-2026 school year with 1 bidding package .
26/11/2025 22:37
TRƯỜNG MẦM NON ĐẠI PHONG announced the results of the bid package Approving the results of appointment of food supply package Insurelac in the school year 2025-2026 .
- Winning bidder: CÔNG TY TNHH CHẾ BIẾN THỰC PHẨM THƯƠNG MẠI KHÁNH NGỌC
29/09/2025 14:30
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan Insurelac milk supply package price is guaranteed regularly for the school year 2025-2026 with 1 bidding package .
29/09/2025 13:41
TRƯỜNG MẦM NON ĐẠI PHONG announced the results of the bid package Supply food package food price regularly for the first term for the school year 2025-2026 .
- Winning bidder: Công ty TNHH Trần Khôi Quảng Nam
29/09/2025 10:20
TRƯỜNG MẦM NON ĐẠI PHONG publishes the plan TRAN KHOI NAM CO., LTD with 1 bidding package .
29/09/2025 09:18
The Bid solicitor TRƯỜNG MẦM NON ĐẠI PHONG has posted the results of the bidding package Construction of works: Dai Phong Kindergarten; Category: Upgrade, concrete and tiled corridors on both sides of the school gate (main cluster) of the investor TRƯỜNG MẦM NON ĐẠI PHONG.
- Winning bidder: CÔNG TY TNHH MTV XÂY DỰNG AN PHƯỚC LỘC
24/03/2025 16:34
The Bid solicitor TRƯỜNG MẦM NON ĐẠI PHONG has posted the request Approving the plan to select the construction contractor: Dai Phong Kindergarten; Category: Upgrade, concrete and tiled corridors on both sides of the school gate (main cluster) of the investor TRƯỜNG MẦM NON ĐẠI PHONG with 1 bidding package.
24/03/2025 16:30
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON ĐẠI PHONG has posted 5 of the contractor selection plan, which contains 1 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG MẦM NON ĐẠI PHONG has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG MẦM NON ĐẠI PHONG has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON ĐẠI PHONG has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects