Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON ĐÔNG HƯNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 4 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG MẦM NON ĐÔNG HƯNG as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG MẦM NON ĐÔNG HƯNG are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 6 contractor selection plans, of which 1 were self-published, and 5 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Package No. 01: Construction and equipment installation .
14/07/2026 19:08
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Consultancy for design verification and estimation .
- Winning bidder: Công ty Cổ phần Thương mại TVP Việt Nam
14/07/2026 19:08
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Project management consultancy .
- Winning bidder: VIEN DONG CONSTRUCTION ARCHITECTURE JOINT STOCK COMPANY
14/07/2026 19:05
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Consulting on making economic - technical reports .
- Winning bidder: LITEUP CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY
14/07/2026 19:03
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Package No. 03: Independent Audit Consulting .
- Winning bidder: TVASC VIET NAM AUDITING COMPANY LIMITED
14/07/2026 19:00
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Package 02: Construction supervision consultancy and equipment installation .
- Winning bidder: Công ty Cổ phần Thương mại TVP Việt Nam
14/07/2026 18:43
TRƯỜNG MẦM NON ĐÔNG HƯNG publishes the plan Repairing Dong Hung Kindergarten, Chan Hung commune with 3 bidding package .
14/07/2026 18:21
TRƯỜNG MẦM NON ĐÔNG HƯNG publishes the plan Planning and design for the construction phase of the project: Repairing Dong Hung Kindergarten, Chan Hung commune with 3 bidding package .
13/07/2026 17:45
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Package No. 05: Construction supervision consultancy .
- Winning bidder: Công ty Cổ phần Thương mại TVP Việt Nam
02/12/2025 16:41
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Tender package No 04: Construction work .
- Winning bidder: SANG NGHIEP CONSTRUCTION & CONSULTANT JOINT STOCK COMPANY
02/12/2025 16:38
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON ĐÔNG HƯNG publishes the plan Urgent repairs to overcome consequences after storm No. 03 (Yagi) at Dong Hung kindergarten in 2024 with 4 bidding package .
11/12/2024 18:51
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Package No. 01: Construction and equipment installation .
14/07/2026 19:08
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Consultancy for design verification and estimation .
- Winning bidder: Công ty Cổ phần Thương mại TVP Việt Nam
14/07/2026 19:08
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Project management consultancy .
- Winning bidder: VIEN DONG CONSTRUCTION ARCHITECTURE JOINT STOCK COMPANY
14/07/2026 19:05
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Consulting on making economic - technical reports .
- Winning bidder: LITEUP CONSTRUCTION INVESTMENT CONSULTANCY JOINT STOCK COMPANY
14/07/2026 19:03
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Package No. 03: Independent Audit Consulting .
- Winning bidder: TVASC VIET NAM AUDITING COMPANY LIMITED
14/07/2026 19:00
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Package 02: Construction supervision consultancy and equipment installation .
- Winning bidder: Công ty Cổ phần Thương mại TVP Việt Nam
14/07/2026 18:43
TRƯỜNG MẦM NON ĐÔNG HƯNG publishes the plan Repairing Dong Hung Kindergarten, Chan Hung commune with 3 bidding package .
14/07/2026 18:21
TRƯỜNG MẦM NON ĐÔNG HƯNG publishes the plan Planning and design for the construction phase of the project: Repairing Dong Hung Kindergarten, Chan Hung commune with 3 bidding package .
13/07/2026 17:45
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Package No. 05: Construction supervision consultancy .
- Winning bidder: Công ty Cổ phần Thương mại TVP Việt Nam
02/12/2025 16:41
TRƯỜNG MẦM NON ĐÔNG HƯNG announced the results of the bid package Tender package No 04: Construction work .
- Winning bidder: SANG NGHIEP CONSTRUCTION & CONSULTANT JOINT STOCK COMPANY
02/12/2025 16:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG MẦM NON ĐÔNG HƯNG has posted 1 of the contractor selection plan, which contains 4 of the bidding package. See full list here
Summary: The Bid solicitor TRƯỜNG MẦM NON ĐÔNG HƯNG has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG MẦM NON ĐÔNG HƯNG has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects